ArxBridge
EMP Shielding Cost Factors Explained
EMP shielding costs move with room size, openings, attenuation and testing, so the figure follows what the enclosure must hold back and prove.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
EMP shielding is a room, a cabinet or a whole building wrapped in a conductive skin that keeps a pulse out, and the figure for the work moves with what the enclosure must hold back and how hard it is to prove. Room size, the number of openings, the attenuation level in dB over a frequency range, the doors, the vents, the filters, the cable entries, the seams and the testing after installation each push the figure in their own way, so the schedule names every driver before a figure is put beside it.
The figure is a sum of drivers rather than a single rate, because a small room with many openings can cost more than a large room with few, and a high attenuation level over a wide frequency range asks for more work than a modest level over a narrow range. The EMP shielding page sets out what the shielding itself is, and the RF shielding page sets out the shielding that sits beside it in the same building.
Cost factor guides on this site follow the same pattern, and the bollard cost factors guide shows how a figure moves with the ground, the rating and the number of units, while the fire rated windows cost factors guide shows how a figure moves with the size, the rating and the glass in each opening.
- SizeThe first driver of the figure
- OpeningsWhere the figure rises fastest
- dBAttenuation over a frequency range
- TestingThe proof that closes the job
The enclosure and what it must hold back
An EMP enclosure is a conductive skin round a room, and the skin must be whole for the pulse to stay out, so every joint, every opening and every cable that crosses the skin is part of the work. A room that holds servers, a room that holds control equipment and a cabinet that holds a single rack each need a skin, and the figure follows the size of the skin and the number of places where the skin is broken.
The level the enclosure must reach is named as attenuation in dB over a frequency range, and the range matters as much as the number, because a level that holds at one frequency may fall away at another. The schedule names the dB figure and the frequencies beside it, so the work is priced against a level that can be tested rather than a single number with no range behind it.
Room size and shape: the first driver of the figure
Room size moves the figure first, because the skin is priced by the area it must cover and a larger room needs more material, more joints and more time to fit. A square room costs less per unit of area than a long thin room, because the long thin room has more wall for the same floor and more corners where the skin must turn and be sealed.
Shape moves the figure beside size, because every corner, every recess and every column that breaks the wall adds a joint that must be sealed and tested. A plain rectangular room with flat walls and a flat ceiling is the cheapest shape to shield, and a room with alcoves, risers and a sloping ceiling asks for more cutting, more folding and more sealing at each change of direction.
Openings: doors, vents, filters and cable entries
Openings are where the figure rises fastest, because every place the skin is broken must be closed again with a part that shields as well as the skin round it. A door, a vent, a filter and a cable entry each need their own shielded part, and the figure grows with the number of openings rather than with the size of the room alone.
The door is the largest opening and the hardest to shield, because it must open and shut many times a day while keeping its seal, and the seal round the door is the part that wears first. The control room doors guide shows how a door on a room full of equipment is chosen, and the steel door frames guide shows how the frame round the door carries the seal that the leaf shuts against.
Vents and filters let air through while keeping the pulse out, and each vent needs a honeycomb or a filter that is sized to the air flow and the attenuation level. Cable entries let power and data through, and each cable needs a filter or a waveguide that is sized to the cable and the level, so a room with many cables through its wall needs many filtered entries and the figure follows the count.
| Driver | What grows | What it asks for | What to check |
|---|---|---|---|
| Room size | Skin area | More material and joints | Length, width, height |
| Openings | Shielded parts | Doors, vents, filters | Count of each type |
| Attenuation | dB over a range | Thicker skin, tighter joints | Level and frequencies |
| Doors | Moving seals | Seals that survive daily use | Leaf, frame, seal |
| Seams | Joint length | Welding and sealing | Every joint named |
| Testing | Proof visits | Tests after installation | Level proved on site |
Attenuation in dB across a frequency range: the level sets the work
Attenuation is named in dB, and the dB figure says how much of the pulse the skin holds back, so a higher figure asks for a thicker skin, tighter joints and more care at every opening. A modest level over a narrow range can be met with a light skin and simple joints, while a high level over a wide range asks for a heavier skin and joints that are welded rather than folded.
The frequency range beside the dB figure matters as much as the figure itself, because the skin behaves differently at different frequencies and a level that holds at low frequencies may fall away at high ones. The schedule names the lowest frequency and the highest frequency with the dB figure, so the work is priced against a range that can be tested rather than a single point that hides the hard end of the range.
The level is set by the equipment inside the room, because the equipment that must keep working through a pulse sets the attenuation its enclosure must reach. The testing and surveys page sets out how a level is proved on site, and the MRI shielded rooms page sets out a room where the level is set by the equipment inside it.
Doors that open and shut: the moving part of the shield
The number of doors moves the figure with the number of openings, because each door needs its own leaf, its own frame and its own seal, and a room with two doors needs two sets of parts and two sets of fitting time. A single door that serves the whole room costs less than a pair of doors on opposite walls, and a door that is used all day needs a heavier seal than a door that is opened once a week.
The hinges and the closer on a shielded door must carry a heavy leaf without letting it drop, because a leaf that drops leaves a gap at the top and the seal no longer touches the frame. The types of security doors guide shows how a leaf is chosen by what it must do, and the steel vs aluminium security doors guide shows how the leaf material changes the weight the hinges must carry.
Seams, joints and the weld that keeps the shield whole
Every place the skin meets a wall, a floor or a ceiling is a joint as well, and those joints are where the shield most often fails, because the skin must turn a corner and meet a surface that is not part of the shield. The corners are sealed with care and the seal is tested after the skin is fitted, so a corner that was missed is found while the fitter is still on site rather than after the room is handed over.
Penetrations that are added after the skin is fitted are the most expensive joints of all, because a hole cut in a finished skin must be sealed again and tested again. The how to specify security doors guide lists what the schedule must hold for every opening, and the security door specification mistakes guide names the openings that are most often left off the schedule and added late.
Testing after installation: the proof that closes the job
Testing after installation is the proof that the enclosure reaches the level on the schedule, and the testing is priced by the number of visits, the number of points tested and the frequencies covered. A single visit that tests a few points costs less than a programme that tests every seam, every opening and every frequency, and the schedule names the points and the frequencies so the testing is priced against a list rather than a hope.
The test is done after the skin is fitted and after the doors, the vents and the cable entries are in place, because a test done before the openings are fitted proves a room that does not yet exist. Where a test finds a gap, the gap is sealed and the point is tested again, and the retest is part of the figure, so a room with many openings may need more than one visit before the level is proved.
The first test finds the seam, and the failed point is put right before the retest
The skin is on, the doors are hung and every entry is sealed, and the first test is the first time the enclosure is asked to prove itself whole. The test team works through the points the schedule lists, at the frequencies it lists, and a point that fails is a seam, a joint or an entry that lets the pulse in. A seam can part where the skin turns a corner, a joint can loosen where two sheets meet, or a filter can sit loose in its entry, and the test finds the failure where the eye cannot. Each failed point goes on the record with the frequency it failed at, so the repair and the retest both return to the same place.
A failed point is put right by opening the seam, cleaning it and sealing it again, and by making the joint whole before the test team returns. A door seal worn thin where the door swings all day is changed for the seal the schedule lists, because a seal that leaks at one frequency leaks at the level the room must hold. The repair is work and the retest is work beside it, so both sit on the figure from the start, as visits with points and frequencies. How a level is proved on site is covered on the testing and surveys page, and the door for a room full of equipment is covered in the control room doors guide.
| What the test finds | What puts it right | What the retest checks |
|---|---|---|
| Seam opened at a corner | Seam cleaned and sealed again | Same point, same frequency |
| Joint between sheets loose | Joint made whole, fixings checked | Joint and the points beside it |
| Door seal worn | Seal changed for the seal named | Door shut, seal in contact |
| Cable entry filter loose | Filter seated and fixed as named | Entry and the cable through it |
A retest is part of the proof, not a second job
A retest is not a second job that follows the first, it is the second half of the proof the first test began. The figure that names the retest from the start treats the visits as one programme, with the first visit finding the weak points and the second proving the repairs, and the schedule lists both visits beside the points they cover. A figure that names a single visit leaves the retest to appear later, when the room is already working and the test team must return through it. The level is written as attenuation in dB across a frequency range, and the retest proves the same level at the same frequencies, so the proof the room carries is the proof the test measured.
The door is the part the test comes back to most, because it opens and shuts all day while its seal must stay whole. What the shielding itself is can be read on the EMP shielding page, and the RF shielding page covers the shielding that works beside EMP shielding in the same building. How a door figure moves with the grade and the hardware is worked through in the security door cost factors guide. When the schedule lists the size of the room, every opening, the level, the frequencies and the doors, the security door enquiry checklist travels with the enquiry, with the doors and their figures on it.
Putting the figure together: one schedule, every driver on it
One list carries the whole enclosure order, with a line for every driver that names the room size, the openings, the attenuation level and the frequencies, the doors, the vents, the filters, the cable entries, the seams and the testing beside it. A list that names only the room size leaves the fitter to guess how many openings the skin must close, and a figure built on a guess grows when the openings are counted on site.
The figure is compared driver by driver, because two figures for the same room can differ by the openings one of them left out or the testing one of them priced short. The security door cost factors UK guide shows how a door figure moves with the leaf, the grade and the hardware, the bullet resistant door cost factors guide shows how a rated leaf moves a figure, and the fire door cost factors guide shows how a fire period moves a figure beside it.
An EMP figure follows the drivers on the schedule, so the room size, the openings, the attenuation level and the testing must all sit on the same list before a figure is put beside them.
What moves the figure for EMP shielding most?
The number of openings moves it fastest, because every door, vent, filter and cable entry needs a shielded part of its own.
Why is attenuation named with a frequency range?
The skin behaves differently at different frequencies, so the dB figure means little without the lowest and highest frequency beside it.
Does room shape change the figure?
Yes, a long thin room with alcoves and columns has more wall and more joints than a plain rectangular room of the same floor area.
When is EMP shielding tested?
After the skin, the doors, the vents and the cable entries are all in place, because a test before then proves a room that does not yet exist.
What should the schedule name?
Room size, every opening, the attenuation level and frequencies, the seams and the testing visits, each with its count beside it.
A penetration cut after the skin is fitted is the dearest joint on the job
A hole cut in a finished skin must be sealed again and tested again, and the joint that follows is the most expensive joint on the job. The schedule names every cable entry, every vent and every filter before the skin is fitted, because a cable that arrives after the room is handed over needs a filtered entry of its own, and the figure follows the count of entries, not the size of the room alone. A vent that must move more air needs a larger honeycomb or filter, and a cable entry for a thick cable needs a larger waveguide, so the size of each opening belongs on the schedule beside its count.
Of all the openings, the door is the widest and the hardest to keep shielded, because it swings open and shut through the day while its seal must stay whole, and that seal is the first part to wear. A room with two doors needs two sets of parts and two sets of fitting time, so the number of doors belongs on the schedule beside the room size. The control room doors guide shows how a door on a room full of equipment is chosen, and the RF shielding page sets out the shielding that sits beside EMP work in the same building.
| Driver | What changes after the order | What to check on the figure |
|---|---|---|
| Cable entries | Cables added late | Every entry named before the skin is fitted |
| Vents and filters | Air flow changed | Filter sized to the air flow and the level |
| Doors | A second door added | Leaf, frame and seal for each door |
| Seams | Joint length grows with the skin | Every joint named on the schedule |
| Testing | A gap found on the first visit | Retest named on the figure |
Two figures for one room part company at the openings
A figure that leaves an opening out of the count, or prices the testing short, will sit below a figure that names both, and the gap between them is work nobody has paid for yet. A single visit that tests a few points is not the same programme as one that tests every seam, every opening and every frequency, and the schedule names the points and the frequencies so the testing is priced against a list rather than a hope. Where a test finds a gap, the gap is sealed and the point is tested again, and the retest belongs on the figure from the start. A figure that lists the visits, the points tested and the frequencies covered can be matched to the schedule, while a figure that lists only one visit leaves the retest to turn up later.
The attenuation level sets the work beside the openings, because a higher figure in dB over a wide range asks for a thicker skin, tighter joints and more care at every opening. The level is set by the equipment inside the room, and the testing and surveys page sets out how a level is proved on site. The security door cost factors guide shows how a door figure moves with the leaf, the grade and the hardware, and the EMP shielding page sets out what the shielding itself is. When the schedule carries the room size, every opening, the level, the frequencies, the doors and the testing, put it on the security door enquiry checklist, which asks for the doors on the list with their figures beside them.
Get a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.