Programming a Security Door and Barrier Package on a Live Site
A door and barrier package is a sequence, not a shopping list. Survey first, order second, foundations before barriers, and handover last of all.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
A door and barrier package is a sequence, not a shopping list. Survey first, order second, foundations before barriers, and handover last. This guide sets out the order and why it matters.
- SurveyWhat the site really holds
- OrderPlaced on measured openings
- FoundationsFirst in the ground, first to cure
- HandoverThe record the next person needs
Survey before the order
Nothing should be ordered until the site has been measured. The survey settles the openings, the structure around them, the ground the barriers will fix into, the access routes for delivery, and the services buried where a foundation will go. A door ordered from an unchecked drawing may not fit its opening.
The NPSA guidance on hostile vehicle mitigation places the practical site assessment at the heart of the requirement: a detailed review of the vulnerabilities and opportunities in the environment, in operational security and in physical security measures. That review is the survey in its widest sense, and it belongs before the requirement is fixed.
Measure every opening, not a sample of them. Openings in one building differ by a few millimetres, and a doorset made for one may not fit the next. Note the wall the frame bolts into and anything added since the drawings were made. The security doors specification guide sets the scope in the order from the start.
The order follows the survey
Place the order on the survey, not on the drawings. The order should name the product, the size as measured, the hardware, the fixings, and the rating the threat assessment calls for. A rating chosen before the survey is a rating chosen for a site nobody has walked.
Agree the sequence in the order as well as the products. Name which openings come first, which barriers need foundations, and what must be ready before each stage starts. A supplier who knows the sequence can plan the work.
Check the listing before ordering, not after the products arrive. The LPS 1175 certificate guide explains the Red Book Live check, and the tender response checklist shows the supplier view. The public frameworks guide covers how the order is placed on a framework.
Foundations first, and the wait that follows
Barriers go into the ground first, and the ground work sets the pace of the package. The NPSA foundation guidance sets out three types: deep foundations, more than half a metre below the ground, shallow foundations, half a metre or less, and surface foundations, fixed to the ground or standing free with no digging at all. The type follows the ground, the services under it, and the rating the barrier must hold.
A foundation must match the tested conditions, or go further than them. The NPSA guidance says the installation should match or exceed the tested conditions, and where the site forces a bespoke foundation, a suitably qualified engineer should validate the change. Digging a shallower foundation because the programme is short is a new build with no test behind it.
Then comes the wait. The NPSA curing guidance says a standard mix reaches about 60 per cent of its strength within three days and about 75 per cent after seven days, with the strength quoted at 28 days. A range of 10 to 30 degrees is preferred; below 5 degrees the process practically stops. Do not pour onto snow or frozen ground, and adding water to a stiff mix weakens the result. Plan the programme around that wait. The bollard foundations guide sets out what the rating needs below the pavement.
Doors once the openings are ready
Doors follow the openings, not the delivery date. An opening is ready when the structure is sound, the dimensions match the survey, and the wall can take the fixings. A doorset fitted into an opening that is still being built will be fitted twice.
Fixing is part of the rating, and a doorset fixed badly is not a rated installation. The fixings, frame and seals must follow the tested method. Check each opening against the drawing before fixing begins.
Ask for the installer’s listing before the work starts, and check it on Red Book Live. The product listing and the installer listing are separate entries; one is no substitute for the other. The LPCB installer scheme asks the installer to issue a Certificate of Conformity for each installation. The installation handover guide lists the checks for the day the product arrives on site.
Keeping a live site open
Most packages land on a site that stays open while the work runs. The site must stay protected at every stage, not only when the work is finished. The NPSA guidance asks for the scheme to fit the site’s normal operations, with vehicle access control and emergency access planned as parts of it.
Work in phases, and hand each phase over before the next begins. A phased programme lets one entrance stay protected while another is rebuilt, and gives the site a working line at every point. Name the phase boundaries, and what must be true before the next phase starts.
Plan for the people who use the site, not only for the work. Deliveries, visitors, staff and emergency vehicles all need a route while the work runs. A programme that forgets the people who use the site will be stopped by them. The ten mistakes guide lists the errors buyers keep making.
Commissioning before anyone signs
Commissioning is the step that turns fitted products into a working package. Run every operable unit through its full movement, test every lock and control, and check that the access system lets the right people through and keeps the wrong people out. A unit that has never been run through its movement has never been proved, whatever its certificate says.
Test the failures as well as the successes. Cut the power and check the manual release. Sound the alarm and check the hold-open devices release. Try the emergency route the fire service would use. A package that only works when everything is normal has not been commissioned; it has only been switched on.
Write down what was tested and what the result was, unit by unit. The commissioning record is the last evidence before handover; without it, the next person trusts what nobody measured. When a stage slips, re-plan the sequence rather than compressing it. The Gateway 2 guide covers that same discipline, applied to fire doors in higher-risk buildings.
| Stage | What happens | What must be true first |
|---|---|---|
| Survey | Openings, ground, services measured | Drawings and access in hand |
| Order | Products named on measured sizes | Survey complete, listing checked |
| Foundations | Dig, pour, cure | Services mapped, engineer signed |
| Doors and barriers | Fix, seal, set | Openings ready, concrete cured |
| Commissioning | Run, test, record | Every unit fitted and powered |
| Handover | Record passed on, receipt signed | Commissioning record complete |
Handover: the record the next person needs
Handover is the day the evidence passes to the person who will run the building. For a higher-risk building, the gov.uk golden thread guidance says what that evidence must hold. The client hands over the papers the building control application rested on, the papers behind the completion certificate application, the certificate itself, the means to reach and control the building information, and the fire safety information for the Responsible Person.
Whoever takes the record signs to say it arrived and can be used. That signature matters: the next person needs the record on the day a fault appears, not on the day someone finds the password.
Keep the record in one place, in digital form, guarded against unauthorised access, with version control, so the next person finds the truth in one file. The same discipline serves any package: the test evidence, the installation record, the commissioning record, and every maintenance visit after, all in one place. The golden thread records guide lists the fire door records that belong in the thread. The barrier care guide shows what happens to the line once it is in service, and the Vehicle Dynamics Assessment guide shows how the threat was worked out.
A package is finished when the record is handed over, not when the last unit is fitted.
What should be surveyed before the order?
Measure each opening, the wall beside it, the ground under the barriers, the way deliveries reach the site, and the services under any foundation. A door ordered from unchecked drawings can arrive to find its opening is a different size.
How long does a barrier foundation need?
Three days gives about three-fifths of the quoted strength, seven days about three-quarters, and the quoted figure itself is the 28-day one. Hold the programme to those marks, and keep loads off the pour.
Can doors be fitted while the site stays open?
Yes, when the work is phased so each entrance is rebuilt in turn while the others stay protected. Agree the boundaries of each phase in advance, with the conditions that open the next one.
What does handover need for a higher-risk building?
The papers behind both applications, the certificate itself, and the fire safety information. The person who takes the record signs for receipt.
What happens when a stage slips?
Change the plan, not the standards. Shift a phase or move the handover date, and keep the curing wait and the commissioning tests intact.
Contact us for a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.