Certified physical security

ArxBridge
Steel door sample in a security test frame with an assessor in a UK test laboratory

ArxBridge

Stadium Security Doors

Stadium security doors: rated doors for stands, concourses, hospitality and back of house, with the vehicle line and one schedule for the venue.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

A stadium fills in an hour and empties in minutes, and the doors on its boundary decide who gets in and how fast they leave. Tens of thousands of supporters pass through the turnstiles, hospitality guests arrive through separate entrances, staff and players use doors the public never sees, and each door has to hold against attack while letting a crowd move.

The order comes from the venue, not from one door. A turnstile line takes the crowd, a hospitality entrance takes guests, a players tunnel takes the teams and a service yard takes deliveries, and each door needs a rating, a control and hardware to fit it.

The rating, the access control, the vehicle line and the records sit inside one schedule, and an order that names them plainly gets the right doors on the right openings. Our security turnstiles guide covers readers, fobs and biometrics in the lane, and the public spaces sector page covers the buildings the doors protect.

  • LPS 1175 B3 / C5 / D10Forced entry ratings, three, five and ten minutes
  • ISO 22343-1Vehicle security barrier ratings
  • BS EN 1125Panic hardware for doors serving more than 60 people
  • Martyn’s LawEnhanced tier for premises holding 800 or more

Stands, concourses and the turnstile line: where a stadium puts its security doors

A stadium divides into parts that meet the crowd in different ways, and each part puts its doors in a different place. The turnstile line meets supporters on foot, the concourse moves them to their seats, the hospitality areas meet guests behind separate doors, and the service yard meets deliveries and team coaches.

Every one of those parts has doors that must hold against attack and doors that must open for a crowd, and the two duties sit on the same schedule. A door that holds against a forced entry attempt but traps a stand full of supporters inside has failed its other duty, and a door that opens freely but lets any stranger into the players tunnel has failed its first.

Walk the venue and note every door a person or a vehicle can reach, then set each one by the attack it could face. A staffed main entrance faces less risk than a rear gate onto a road nobody watches after a night match, so the rating follows the door, not the stadium.

The turnstile line and the doors behind it: sorting a crowd on the way in

Turnstiles sort a crowd, and the doors behind them hold the line when the turnstiles stop. Supporters arrive in waves before kick-off, tickets are checked at the lane, and a failed door leaves the crowd outside.

A door on the turnstile line must close behind the person who passes through, and a door left standing open is no door at all. A closer or a motor that pulls the leaf shut belongs on the schedule beside the door, and the inspection round should look for the door that no longer shuts on its own.

Every lane on the way in must open freely on the way out when the alarm sounds, so the release on a turnstile or a speed gate belongs on the inspection round beside the reader. Test the release every round, because a lane that stays locked in an evacuation has failed the one job it was fitted for. The turnstile versus speed gate versus portal guide works through which lane suits which entrance.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Reading the rating on a stadium order: B3, C5 and D10

Under LPS 1175 the rating on a doorset names the tool set it stood against and the time it stood for. Three minutes against light hand tools is B3, five minutes against heavier hand tools is C5, and ten minutes against heavy tools is D10. Issue 8.2, dated September 2024, carries those labels, and older drawings still show SR2, SR3 and SR4 for the same three ratings, in the same order.

The rating follows the door, not the building. A hospitality entrance that faces a quiet street takes a lower rating than a rear door onto an unlit service road, and a door into the control room takes the highest rating on the site, because the room behind it runs the venue. The forced entry ratings are set out in full on our LPS 1175 page, and the two routes are compared in our LPS 1175 versus PAS 24 guide.

A stadium door can carry a fire period and a forced entry rating together, but only where one doorset has been tested for both jobs. The EN 1634-1 classification proves the fire side and the LPS 1175 or PAS 24 rating proves the security side, and each proof must name the doorset that will be fitted, because a door with one proof has proved one job only. How the two proofs sit on one doorset is worked through in our dual certification guide.

The concourse doors that hold a crowd and release it

A concourse door works in two directions at once. Before the match it lets supporters through to their seats, and after the final whistle it must empty a stand in minutes, so the leaf must open under a crowd leaning on it.

Any door that serves more than 60 people takes panic hardware to BS EN 1125, and the bar on it must run across at least 60 percent of the leaf and release in one push. Fit the bar to the leaf it was tested with, because a bar on an untested leaf leaves the doorset with no proven rating at all.

The force needed to open a concourse door is capped by BS 8300 and Approved Document M, below 30 N through the first 30 degrees and below 22.5 N beyond that, so a closer set too strong puts the door outside the rules and a supporter carrying a child or using a walking stick cannot open it. Closer power sizes come from BS EN 1154, and no fire door takes less than EN 3. Our fire door hardware guide covers the grades and the parts that make a fire door work, and the fire door closers guide lists the power sizes and the adjustments that keep a closer inside the rules.

The turnstile line first: sorting a crowd before the door

A crowd is sorted at the turnstile line before it reaches the doors, and the doors behind the line must open for the people the turnstiles let through. The turnstile sorts the crowd on the way in, and the concourse doors take the flow that follows, so the doors must open with a light push and shut behind the last person through.

Concourse doors must hold a crowd and release it, and the two jobs ask for different proofs. The leaf must hold against the pressure of a crowd leaning on it, and it must still open the moment the alarm sounds, so the panic hardware and the closer belong on the same line as the leaf. The bar that releases the crowd is proved to BS EN 1125, taking a bar across at least 60 percent of the leaf width, and it is the hardware for a room that holds more than 60 people.

Whether the bar works for everyone in the ground comes down to the force it takes to open the door. The force must stay below 30 N for the first 30 degrees of travel and below 22.5 N beyond, under BS 8300 and Approved Document M, so a child or an older supporter can push the leaf open with one hand.

The grade on a stadium order follows the room the door guards, and forced entry is proved to LPS 1175, with B3, C5 and D10 holding three, five and ten minutes against the tool sets for their categories, all under Issue 8.2, dated September 2024.

Outside the ground: the gates and bollards on the approach

The rooms the public never sees take a different door from the concourse, because the stores and the plant behind them hold a heavier fire load. A hospitality door must welcome guests and still resist a person who tries to force it, while a back of house door guards the rooms that feed the ground. The period follows the fire load behind the door, so most rooms take FD30 and the heaviest loads take FD60.

Outside the ground, the approach takes gates and bollards that close the line a vehicle could drive through. The rating is proved to ISO 22343-1, which supersedes PAS 68:2013, with test vehicles from a 1,500 kg car to a 30,000 kg truck at 48, 64 or 80 km/h, and the order should name the rating the approach could bring. The spacing on the line follows ProtectUK, with no more than 1,200 mm clear between bollards and a minimum height of 500 mm.

The enhanced tier and the security plan set the duties a stadium carries, and the doors must prove they can empty the ground. The fire strategy must show how the building empties and how the doors release, and the schedule should name the rating, the reader and the release beside every door, so the door that arrives is the door that was tested.

Position Door Rating What to check
Turnstile line Concourse door LPS 1175 B3 Lock, closer, release
Concourse Panic bar door BS EN 1125 Bar, closer, force
Hospitality Glazed fire door FD30 Glass, seals, closer
Approach gate Vehicle gate ISO 22343-1 Rating, release, motor

Put the rating, the bar and the release on the same line as every stadium door on the order, so the leaf that arrives matches the leaf that was tested. The lanes and readers at the staff entrance are covered in our security turnstiles guide, and the rated options for the gate line are covered in our anti-ram gates and barriers guide. The ratings in full are set out in our ISO 22343 vehicle security barriers guide, and the periods for the shared parts of a public building are set out in our commercial buildings fire door regulations guide.

Hospitality areas and back of house: the doors the public never sees

The rooms behind the public face carry their own risks. A hospitality suite door needs a lock that keeps strangers out of the boxes, a kitchen door needs a closer that survives heat and steam through a match day, and a plant room door needs FD60 and a closer strong enough to shut a heavy leaf against the draught.

Deliveries come in through the back of the ground, so the bay door and the personnel door beside it belong on the same schedule as the concourse doors. Nobody should have to lift a shutter to walk out, so the personnel door goes in the same order as the shutter. Bay doors in full are covered in our loading bay doors guide.

Staff, players and officials pass through doors the public never sees, and those doors take a lock that resists attack from the corridor. A thumb turn on the inside lets a person leave without a key, and a cylinder that meets TS 007, a 1-star cylinder with a 2-star handle or escutcheon giving a 3-star set, resists attack from the outside.

The vehicle line outside the ground: gates, bollards and the approach

A vehicle barrier earns its ISO 22343-1 rating in a live test, with a vehicle driven at it and the result written into one string. Cars from 1,500 kg up to trucks of 30,000 kg are driven at 48, 64 or 80 km/h, and the string records the vehicle class, the speed, the angle and the penetration, so a rating such as V/7500[N3]/80/90:0/0 can be written straight onto the schedule for the approach.

Vehicle ratings moved on from PAS 68:2013, and ISO 22343-1:2023 is the standard a schedule should name now. A line that still asks for PAS 68 asks for a rating no test house issues, so write the current standard beside each barrier and the rating beside the standard. The ratings in full are in our ISO 22343 vehicle security barriers guide, and the change from PAS 68 and IWA 14-1 to the current standard is worked through in our PAS 68 bollards guide.

The gap beside a barrier and the height of the barrier both belong on the schedule, because ProtectUK guidance puts a 1,200 mm cap on the clear gap and a 500 mm floor under the height. Leave a wider gap and a vehicle slips past the barrier; fit a lower barrier and a vehicle climbs it. The hostile vehicle mitigation page covers the line in full, and our anti-ram gates and barriers guide works through the options, while our road blockers guide covers the blockers that rise from the road.

The enhanced tier and the security plan: duties a stadium carries

Every stadium falls under Martyn’s Law, and the tier follows the crowd it holds. Premises holding 200 to 799 people sit in the standard tier, and premises holding 800 or more sit in the enhanced tier, so a stadium is an enhanced tier premises. The law reached Royal Assent in April 2025, go-live is expected in spring 2027, and the Security Industry Authority regulates the scheme.

The security plan for the venue should name the doors beside the measures they carry. A door that holds against attack, a gate that releases on alarm and a barrier that stops a vehicle each belong on the same plan, with the rating beside each one, so the next operator can see each door’s duty.

Our Martyn’s Law guide sets out the tiers and what each one asks of a building, and the Martyn’s Law standards page sets out the law itself.

Ordering for the whole venue: one schedule, one set of evidence

Build the enquiry as a specification, with one line for every door on the venue. Each line names the position, the door type, the forced entry rating, the fire period, the access control and the automation, and the leaf, the frame, the fixings and the hardware as one assembly. Where a door must resist a vehicle as well, ask for the rating on the whole line, not on the leaf alone.

Have the test report, the classification and the hardware schedule travel with the doors, and file them the day the doors arrive. The handover pack should name the inspection routine the venue will follow, so the record covers the whole life of the line.

Position Door Rating What to check
Turnstile line Pedestrian door LPS 1175 B3 Closer, reader, self-closing
Concourse escape route Fire and security doorset B3, FD30 Panic hardware, seals
Control room Security door LPS 1175 D10 Lock, hinges, fixings
Hospitality entrance Security door LPS 1175 C5 Lock, closer, reader
Vehicle approach Bollards and barriers ISO 22343-1 Fixings, spacing, height

A stadium door guards a crowd on one side and a rating on the other, so the forced entry rating, the release on alarm and the vehicle line must all sit on the same schedule.

What security rating do stadium doors need?

The venue decides, by the attack each door could face. A turnstile line door often takes B3, a hospitality door takes C5, and a control room door takes D10, all to LPS 1175.

Can one stadium doorset hold a fire rating and a security rating?

Yes, where the doorset is tested for both. The fire proof is a classification to EN 1634-1 and the forced entry proof a rating to LPS 1175 or PAS 24, and both must name the doorset that will be fitted.

Do stadium turnstiles need to release on alarm?

Yes. Turnstiles and speed gates sit on the way in, not on the way out, and they must release when the alarm sounds so the crowd can leave.

What vehicle rating does a stadium approach need?

The venue decides, by the vehicle the line must stop. ISO 22343-1 tests barriers against vehicles from a 1,500 kg car to a 30,000 kg truck, at 48, 64 or 80 km/h.

Who checks stadium security doors?

The venue team, on the routine the security plan and the fire strategy set. Each record names the door, the fault, the repair and the date.

Specifying security doors for a stadium?Send the door schedule and the venue plan for a tested doorset quotation.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.