ArxBridge
Self Storage Security Doors
A self-storage site guards other people's goods behind unit doors, so each leaf takes the grade the room behind it demands, from gate to office.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
A self-storage site is a yard, a set of buildings and rows of unit doors behind one gate, and the doors between those parts decide what stays where it belongs. The yard holds the customers, the buildings hold the units, and the offices behind them hold the keys, the takings and the plant, so each door takes its proof from the room behind it.
LPS 1175 sets the grade on a self-storage door, and the category follows what sits behind the leaf. Issue 8.2 of September 2024 names the three categories B3, C5 and D10, at three, five and ten minutes. The entrance takes the lowest of the three, the unit corridor takes the middle one, and the cash room takes the highest.
A self-storage site follows the same rules as any other commercial building, and the fire door regulations commercial buildings guide covers the shared parts, while the warehouse security doors guide covers the stores beside the units. The site order names every door, with the grade and the lock beside each one, so the door that arrives is the door its room asked for.
- LPS 1175 B3 / C5 / D10Forced entry grades to Issue 8.2
- Unit corridorsWhere the grade rises
- FD30 / FD60Fire periods to EN 1634-1
- One listEvery site door named
Units, corridors and offices: one site, three grades
Three parts make up a self-storage site, and the grade follows what each part holds. The yard holds the customers, the unit corridors hold the goods, and the cash room holds the money the day has taken, so each part takes the doors its work demands.
The entrance leaf opens for every customer who arrives and shuts behind them on its own, because a leaf left standing open guards nothing. The unit corridor leaf is never seen by the public, and it must hold against the attack the goods behind it invite.
The order is written from a list that names every opening, the leaf it takes and the grade beside it, because a leaf with no line on the list may turn up in the wrong corridor.
The entrance and the gatehouse: the leaves every customer passes
An entrance leaf has two jobs at once: to open for every customer who arrives, and to hold an intruder out once the site shuts. The leaf, the frame and the lock are proved as one doorset, and the test report names all three.
A closer pulls the entrance leaf shut after every customer who passes, because a leaf left standing open guards nothing. The closer is set so the leaf comes home without a slam, and the pull is checked by opening the leaf and watching it shut on its own.
Glazing in the entrance leaf lets the staff see who stands outside before the leaf opens, and the pane carries the same proof as the leaf beside it. What the glass itself adds to the order is worked through in the fire rated glass cost guide, and the bead and the fixings that hold the pane are named in the test report.
Unit corridors: the doors behind the rows of units
Behind every row of units runs a corridor, and the leaf that guards it takes the grade the value behind it demands. C5 suits the unit corridor, because the goods behind it justify the minutes it takes to break through, and the leaf must hold until the alarm is answered.
Only the site team holds the key to the unit corridor, because customers must never pass it alone. The corridor leaf takes C5, the cash room beside it takes D10, and the entrance takes B3.
The corridor leaf shuts out the sound of trolleys as well as an intruder, so the office stays quiet while deliveries move through. Seals round its edges and a closer that brings it home after every member of staff who passes do that work.
One doorset can hold fire back and hold an intruder out at once, because the corridor needs both proofs. EN 1634-1 gives the fire proof in minutes and letters, E, EW and EI from 30 to 120, while LPS 1175 gives the forced entry proof in B3, C5 and D10. Both proofs are run on the same leaf, frame and seals, so one report holds them both, and the fire and security doors dual certification guide shows how one doorset carries the pair.
The office and the cash room: where the keys and the takings wait
The cash room takes the highest grade on the site, because the takings sit behind its leaf. Leaf, frame, fixings and lock are proved as one doorset, and the test report names each part, so the door that arrives is the door that was proved.
D10 suits the cash room, because it must hold longest, while the unit corridor beside it takes C5 and the entrance takes B3. Drawings drawn before Issue 8 call the same three categories SR2, SR3 and SR4, so the order carries the new name beside the old one.
The office beside the cash room needs the same care, because the records and the keys sit behind its doors. Its leaf takes C5, and its lock takes the same key as the cash room, so the staff who work there can open both doors with one key. The keeping an LPS 1175 rating valid guide names what breaks a rating once a door is fitted.
Plant rooms and the delivery bay: the doors that keep the site running
The plant room holds the services that keep the site running, and its leaf takes the grade the value behind it demands. C5 suits the plant room, because the boards and the plant behind it justify the minutes it takes to break through.
Goods reach the site through the delivery bay, so its leaf must be wide enough for pallets, with a closer that pulls it shut after each load. C5 suits the delivery bay leaf, because the stock passing through it is worth the minutes it takes to break through. The leaf, the frame, the fixings and the lock are proved together as one doorset, and the report names the grade the leaf holds. For the doors that take the deliveries in, the loading bay doors guide covers them in full, and the plant room door requirements guide sets out what the plant room leaf must do.
A delivery bay leaf that stands open through the working day takes a hold-open device proved to BS EN 1155, which releases the leaf the moment the alarm sounds.
The leaf is fitted with a 4 mm gap round it, so it swings clear and the seal closes the opening when the leaf shuts. The intumescent seal swells as the heat climbs toward 200 to 250 degrees and closes that gap, unless a coat of paint over the seal stops it swelling.
The way out for a full site: escape routes customers can follow
Once the alarm sounds, the customers on a site take the route the building gives them, so the way out must be clear. Each door on that route opens with a single push from whoever reaches it, whether the power is on or off.
Each door on the route takes a smoke proof as well as a fire period, to BS EN 1634-3. At room temperature the mark is Sa, and at 200 degrees it is S200. Smoke moves faster than flame, so it reaches the customers on the route ahead of the fire, and a seal holds only where it meets the frame all round. The smoke control doors guide works through how the doors hold smoke back while people move past them.
The whole route lasts only as long as its weakest leaf, so no leaf on it takes a shorter proof than the route needs. A leaf proved for less than its neighbours gives way first, and the route goes with it.
| Position | Door | Grade | What to check |
|---|---|---|---|
| Entrance | Glazed leaf | LPS 1175 B3 | Leaf, glass, closer |
| Unit corridor | Steel leaf | LPS 1175 C5 | Leaf, lock, seals |
| Office | Steel leaf | LPS 1175 C5 | Leaf, lock, reader |
| Cash room | Steel leaf | LPS 1175 D10 | Leaf, lock, reader |
| Plant room | Steel leaf | LPS 1175 C5 | Leaf, lock, seals |
| Delivery bay | Steel leaf | LPS 1175 C5 | Leaf, closer, lock |
Locks, fobs and the site team: who opens which door
Staff move from the yard through the corridors to the plant room and back, and each leaf on that route opens for staff and stays shut for the public. A reader sits beside every leaf on the route, and it opens for the fobs the list names. The fire door hardware guide sets out what the lock the key turns must do.
Readers, releases and wiring beside a leaf are covered in the door entry systems guide.
Each leaf carries its answer for a power failure on the order, written beside its door before the order goes out, so no leaf is left to guess when the power goes.
The self-storage order: every leaf on one list
The whole site order sits on one list, a line for every door with the leaf, the grade, the lock and the closer beside it, so the door that arrives is the door its room asked for. A list that names a single leaf for the whole site leaves the fitter to guess which room takes which grade, and a leaf in the wrong room guards the wrong thing.
The order is priced door by door, with the figure for each leaf, lock and closer written against that door on the schedule, and the schedule and the quotation are laid side by side before anything is signed, because a door with no figure beside it still arrives on the invoice, and a lock ordered after the rest of the doorset costs more than the same lock ordered with it. The how to specify security doors guide sets out the columns the schedule needs, and the security door cost factors guide shows how the figure moves as the grade rises.
Doors on the site are tried through the week, a few leaves each day, so none goes untried for long: the entrance at opening, the corridor before the first customer arrives, and the cash room door at closing. Any fault is written against the door where it was found on the day it was found, with the leaf, the part and the date beside it, so the repair is booked before the next day starts. What a visit should look for is set out in the fire door inspection checklist, and the security door maintenance checklist covers the doors that must hold both fire and forced entry.
A self-storage door holds only as long as the units behind it and the corridors beside it, so the grade, the period and the lock must all sit on the same list.
What grade should a self-storage door carry?
The room behind the leaf decides the grade: B3, C5 or D10 to LPS 1175, and the cash room takes a higher category than the entrance beside it.
Can one leaf hold fire and forced entry?
Yes, one doorset can carry both proofs where the fire test and the forced entry test were run on the same leaf, frame and seals, so a single report covers the pair.
Do self-storage doors need access control?
The doors behind the yard take a reader beside the leaf, so the leaf opens for staff and stays shut for the public.
What period should a self-storage door carry?
A self-storage door takes FD30 or FD60, proved to EN 1634-1, and the letters beside the minutes name what the leaf held back. The period follows the room the leaf guards.
Who checks the self-storage doors?
The site team walks the round that covers every door, and the record of each visit stays with the site file.
Get a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.