Certified physical security

ArxBridge
Installer checking the seal of navy steel fire-rated doors in a UK office corridor

ArxBridge

Fire Door Regulations for Dialysis Centres

A dialysis centre runs regular patient sessions beside treatment rooms and a drug store, so each leaf takes the fire period that its room needs.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

FD30 to EN 1634-1 guards the entrance leaf of a dialysis centre, with the same period guarding the waiting area, the treatment rooms and the staff office, and FD60 guarding the water treatment plant room, the drug store and the plant room.

EN 1634-1 tests a leaf for periods from FD30 up to FD120, and the letters that follow the minutes tell what it stops, E for flame, EW for flame and some heat, and EI for flame and heat together.

A dialysis centre holds treatment rooms where patients sit beside machines for a session, a water treatment plant room that makes purified water for those machines, a waiting area where the next session gathers, and a staff office where patient records are kept, and the same patient cohorts return for session after session, so the fire order follows the session pattern rather than a stream of walk in arrivals.

  • FD30 / FD60Periods to EN 1634-1
  • Session listsRegular patient cohorts attend sessions
  • Staff officeWhere FD30 holds the records and keys
  • One routeFrom the treatment rooms to the street

Seven leaves round a dialysis unit: the period each leaf carries

Seven leaves sit on a dialysis centre fire order, and each leaf takes the period that fits the room behind it, with the entrance, the waiting area, the treatment rooms and the staff office sitting at FD30, and the water treatment plant room, the drug store and the plant room sitting at FD60.

FD30 gives thirty minutes to the four leaves where patients and staff gather through the day, and FD60 gives sixty minutes to the three leaves where purified water, medicines or plant sit behind a shut leaf.

Room Period Grade
Entrance FD30 B3
Waiting area FD30 B3
Treatment rooms FD30 B3
Staff office FD30 B3
Water treatment plant room FD60 C5
Drug store FD60 C5
Plant room FD60 C5

One leaf can carry both results in a single report, with its fire minutes and its forced entry grade standing side by side, and the dual doorset guide covers how the fire test and the forced entry test run together on that leaf.

What FD30 and FD60 hold back in a dialysis unit

A leaf on its own carries none of the minutes, because the frame, the seals and the closer all carry part of them, and a leaf hung in a different frame loses every minute named in the report.

FD30 gives thirty minutes to the route out while patients and staff leave the treatment rooms together, and the water treatment plant room, the drug store and the plant room take a full hour of FD60, because the rooms behind those three leaves hold water plant, medicines or plant that must stay shut away from the rest of the unit.

The letters beside the minutes say what the leaf stops, E for flame, EW for flame and some heat, and EI for flame and heat together, so the order must state the letters with the minutes and never order a leaf on minutes alone.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Water treatment plant room, drug store and plant room: three leaves that hold a full hour

Purified water for the dialysis machines is made behind the water treatment plant room leaf, which is why the leaf carries FD60, and it stays shut between visits, holding the heat back while the plant runs with no one watching it.

FD60 sits on the drug store leaf as well, since the medicines for the sessions sit behind it in counted stock. The plant room leaf takes FD60 for the same reason, because the pumps, heaters and boards that warm the unit and light the treatment rooms sit behind that leaf.

No one opens the water treatment plant room leaf without its key, and at every other time the leaf stays shut, because the plant inside runs with no one watching it. If that leaf were left open, heat and smoke would reach the kit inside before anyone in the treatment rooms knew a fire had started.

Entrance and waiting area leaves: FD30 on the way in and the way out

The entrance leaf and the waiting area leaf both sit at FD30, because those two leaves sit on the way out, and thirty minutes gives the route the time it needs while patients leave the waiting area and the treatment rooms together.

At a session change the patients and their visitors head out together, so the leaf on the way out has to open under a crowd with no key and no code. Under BS EN 1125 a push bar must span no less than 60 percent of the leaf width on any leaf that serves more than 60 people. The panic hardware guide covers those bars, and the emergency exit guide covers the leaves that carry them.

The waiting area fills before each session and empties at each session change, so the leaf beside it opens and shuts more often than any other leaf in the unit. A leaf that will not shut after a crowd has passed it gives its thirty minutes away, and the closer guide covers the closers that pull a leaf shut after every passage.

Treatment room leaves: FD30 where patients are connected to machines

Treatment room leaves sit at FD30, because patients are connected to machines in those rooms and staff need time to disconnect each patient before the room empties, and thirty minutes gives the room the time that work takes.

A patient connected to a machine cannot leave the treatment room at the first sound of the alarm, so the leaf beside the room must hold the heat back while staff work through the chairs in turn. The hospital fire door guide covers a building where patients stay in beds round the clock, while the GP surgery fire door guide covers a building where patients arrive without a session list.

Between sessions the treatment rooms stand empty with the machines switched off, and the leaves round them stay shut until staff open them for the next cohort. A leaf left open between sessions would let smoke reach the machines unnoticed, so the closer is checked each time the room empties and the leaf is pushed shut behind the last nurse out.

Smoke before flame on the dialysis corridor: Sa and S200 beside the period

Smoke gets down the route before flame does, so the leaves along the route from the treatment rooms to the waiting area carry a smoke rating to BS EN 1634-3, Sa where the smoke is at room temperature and S200 where it is at 200 degrees.

A few leaves stand held open through a session by devices that let go when the alarm sounds, so each leaf closes by itself and the smoke stays on one side. The closer guide covers the closers that pull a leaf shut, while the smoke control guide covers leaves that keep smoke back.

While staff disconnect patients from the machines the smoke moves down the corridor, so the leaves on the route shut before it reaches the waiting area, and the compartmentation guide shows how those leaves split the building into parts that hold fire and smoke apart.

Hinges, closers and seals that hold the dialysis fire period in place

Three parts carry the hour on an FD60 leaf, the closer that pulls it shut, the seals that meet the frame and the gaps round the leaf that stay at 4 mm. A leaf left ajar gives its minutes away before the fire reaches it, and the gap guide shows how that 4 mm gap is measured.

A seal set in a groove round the leaf swells as the fire heats it, closing the gap while the flames grow. The swelling begins near 200 degrees and runs on to 250 degrees, and the seal guide sets out how those seals behave once the heat rises.

The hinges on a dialysis centre fire leaf are proved through 200,000 swings, grade 13 carrying 120 kg and grade 14 carrying 160 kg, so the leaf still meets its frame after years of sessions. Its closer is proved to BS EN 1154, where EN 1 is the smallest power size the standard lists and no fire leaf takes less than EN 3. What each piece on the leaf must carry is set out in the hardware guide.

A fire leaf needs to shut by itself yet open under a light hand, and under BS 8300 and Approved Document M the force to open it stays below 30 N through the first 30 degrees and below 22.5 N past that point.

Steam works on a dialysis doorset over a working week

Steam hangs in the air round a dialysis unit, and the door that stands nearest the wet room takes it first. Damp settles on the face of the door and on the strip in its groove, and the strip drinks it in, swelling a little each day until it presses hard against the frame. A door that swelled in the damp no longer swings free, and the closer must work against a door that sticks on every pass.

The door itself swells too, and a swollen door binds at the top corner first, where the gap was already narrow. Staff push harder to move it, the hinges take the extra load, and the screws that hold the hinges start to work loose in the frame. The upkeep pages give the jobs that keep hinges tight and a door swinging free, and a door that sticks is a door whose period is already at risk. Steam finds the smallest opening, and a door that binds in the damp is checked on the round before the next session starts.

Sign Where it shows What to do
Door binds at the top Corner by the frame Read the gap round the door
Strip feels soft Groove in the frame Look for splits and paint
Closer strains Arm above the door Test the pull on the next round

Under BS EN 1154 the lowest grade a fire door closer may carry is EN 3, and the grade matters more where steam has swollen the door, because the closer must still draw a heavier door to its frame. The closer pages give the grades a fire door closer may carry, and a closer that cannot shut a swollen door leaves the room open to smoke.

The swollen seal: steam takes the gap the fire period needs

Smoke reaches the corridor while chairs are still full, which is why Sa or S200 sits beside the period on the route doors. Sa holds smoke back at room temperature, S200 holds it back at 200 degrees, and a strip that has swollen shut in the damp cannot be counted on to swell again when heat reaches it. The smoke pages set out which doors on a route carry each rating.

The gap round the door is read with a gauge, and a reading past 4 mm is written down beside the door that carries it. The gap pages show where the gauge is held and what the reading should say, and a gap that grows as the door swells tells the round that the door, not the closer, is the part that has changed.

Once the heat passes 200 degrees the strip starts to grow, and the growth is done before 250 degrees, while paint on the strip stops the growth and leaves the gap open. The seal pages trace the strip from its first warmth to its full close, and a strip that stays damp through the week needs a dry look before it is trusted.

When the unit orders its doors, the checklist for the enquiry runs through the rooms one by one, so the dialysis doors that stand in steam arrive with hinges, closers and strips matched to a wet room.

Alarm sounding in the unit: getting patients off machines and out

The route to the street is marked by signs at every turn, because the alarm may sound while the treatment rooms are full and patients must find the way out without asking, and the signage guide covers the signs that sit on the leaf and along the route.

Martyn’s Law received Royal Assent in April 2025, with go-live expected in spring 2027, and its tiers cover premises that hold 200 to 799 people and premises that hold 800 or more, so a unit that fills its waiting area at a session change needs to know which tier it sits in, and the Martyn’s Law guide covers the tiers and what each one asks of a venue.

Outside, the street front needs the same care as the route, because patients gather there once the alarm sounds and the unit stands empty, and bollards guard the front of the building with a clear gap of no more than 1,200 mm between them and a height of no less than 500 mm under ProtectUK. The ratings for vehicle impact now follow ISO 22343-1:2023, which stands in place of PAS 68:2013, while the bollard guide covers the posts that stand there.

Each leaf gets one line on the order, naming its room, its period, its grade and its closer, and every line is read back against its room before the order is signed, so no leaf takes minutes that belong to another room. The proof guide covers the proof behind each leaf, and the specifying guide covers the leaf, the frame and the hardware as one set.

At the start of the day the senior nurse takes the door list round the unit and tries each leaf in turn. A leaf that will not shut is written down the same morning, and the note stays open until a closer or a seal is put right and the leaf shuts on its own again.

Put the period, the grade and the closer for every leaf on one list, then read each line back against its room before the order is sent.

What period should a dialysis centre plant room door carry?

The plant room leaf takes FD60 to EN 1634-1, because the pumps, heaters and boards behind it warm the unit and light the treatment rooms.

What period should a dialysis centre entrance door carry?

FD30 to EN 1634-1 sits on the entrance leaf, because it guards the way out from the waiting area to the street.

Can a dialysis centre leaf hold a fire period and a security grade?

Yes, one dialysis centre leaf can be proved for fire and for forced entry together, and the two results stand side by side in one report.

Do dialysis centre fire doors need a smoke rating?

Yes, the leaves along the route from the treatment rooms to the street carry Sa or S200 to BS EN 1634-3, so the smoke stays on one side of the leaf while patients leave.

What happens when a fire door will not shut?

The senior nurse writes the leaf down that same morning, and the note stays open until a closer or a seal is put right and the leaf shuts on its own again.

Off the machine first, then out: the order the alarm sets

The alarm can sound in the middle of a session, with every chair full and every patient joined to a machine, and the order of the next few minutes is agreed long before the alarm ever sounds. Staff free the patients in turn, chair by chair, and the patient nearest the door is freed first, so the way out stays clear while the rest of the chairs are still being freed. Nobody runs for the door while a patient is still joined to a machine, because a chair left behind blocks the very route the rest need.

The treatment room leaf holds FD30 while that work runs, and thirty minutes is more than the freeing of a full room takes. Smoke reaches the corridor while the chairs are still being freed, which is why the leaves on the route carry Sa or S200 beside their period, holding the smoke back at room temperature and at 200 degrees. The smoke control guide works through the leaves that keep the corridor clear while a room empties.

Step Who moves Leaf
1 Staff free the chairs nearest the door Treatment room leaf holds while the work runs
2 Patients who can walk follow the signs to the waiting area Corridor leaves shut behind them
3 Staff move the patients who cannot walk, then the senior nurse walks the rooms Every leaf pushed shut on the way out

Where the route serves more than 60 people, the leaf on the way out carries a bar proved to BS EN 1125, running across no less than 60 percent of its width, so one push opens it under a crowd. The panic hardware guide follows that bar from the push to the latch, and the emergency exit guide follows the leaves that carry it to the street.

The leaves that must still be shut when the last chair empties

Some leaves are held open through a session and let go by themselves when the alarm sounds, and each one must close on its own once the device releases it, or the smoke walks straight down the corridor behind the last patient out. A device that holds a leaf open through a session carries a proof to BS EN 1155, and it lets the leaf shut by itself once the alarm sounds. The closer guide follows the closers that draw a leaf to its frame after each person passes, and a leaf left standing open after the crowd has gone holds no minutes at all.

Signs mark the way at each turn, since the alarm can sound while every chair is full and nobody in the room has walked the route before. The signage guide follows those signs from the treatment room leaf to the street door, and the route itself is kept clear, so no chair and no trolley ever stands where the patients must walk.

Between sessions the rooms stand empty and the machines are off, and the leaves round them are pushed shut behind the last nurse out, so a fire that starts in an empty room meets a shut leaf before it meets the corridor. A leaf left open between sessions lets smoke reach the machines unnoticed, and the closer is tried each time the room empties.

The unit is priced room by room, and the healthcare doors quote page takes the list of rooms with the period each leaf must hold, so the treatment rooms and the leaves that guard them are priced as one set.

Specifying fire doors for a dialysis centre?Send the room list with the period each leaf must hold, and ask for a tested door quotation.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.