ArxBridge
Pedestrian Gates
Pedestrian gates for the boundary line: the leaf, the lock and the line, LPS 1175 grades, powered safety to EN 12453 and the gate on the order.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
A boundary line needs a way through it, and the pedestrian gate is the way people pass. A fence can hold the line and a vehicle gate can hold the lorries, but neither lets a person walk through, and a boundary with no gate for people is a boundary that gets climbed, cut or propped open.
The gate must hold the same line as the fence beside it. A gate proved to a lower grade than the fence is the weak point of the boundary, because the attack moves to the gate the moment the fence holds. The leaf, the frame, the posts and the lock were proved together.
The fences the gate stands beside are covered in the crash rated fences and HVM fencing guide, and the vehicle gates on the same boundary are set out in the anti-ram gates and barriers guide. A gate ordered without the fence beside it may land in the wrong line, so the gate, the fence and the grade are named together on one line of the order.
- LPS 1175 B3 / C5 / D10Forced entry periods to LPS 1175
- EN 1627 RC1 to RC6Resistance classes for gates
- 1,200 mm / 500 mmProtectUK gaps and height
- EN 12453Safety on a powered gate
The gate on the boundary line: what a pedestrian gate must do
A pedestrian gate stands in the fence line and opens for the people who belong on the site. The gate opens inward or outward on its hinges, and it shuts behind each person, so the line holds between one opening and the next. A gate that stands open all day holds nothing, whatever its grade.
The gate must open for the people who use it every day and stay shut for the rest. A gate that cannot be opened by the weakest person behind it will be propped open, and a gate propped open holds nothing back. The force to open a door on the route must stay below 30 N for the first 30 degrees of travel and below 22.5 N beyond, under BS 8300 and Approved Document M.
The gate must also shut on its own, because a gate that needs a hand to close it will be left open. A closer or a spring pulls the leaf shut after each person, and the closer belongs on the order beside the leaf, with the power size chosen for the leaf. The security gates cost factors guide works through what each step up the scale adds to the price.
The leaf, the frame and the posts: the gate that holds its line
A gate is only as strong as the posts that hold it. Posts set in concrete carry the leaf through every opening, and a post that moves lets the leaf drop and drag on the ground. The posts, the concrete and the fixings belong on the order beside the leaf, so the gate that arrives is the gate that was proved.
The frame must carry the leaf without twisting, because a frame that twists lets the leaf move in its fixings. The leaf, the frame, the posts and the lock were proved together, and a leaf swapped for another after the test leaves the gate different from the one tested.
The ground under the gate matters as much as the gate itself. A gate on ground that moves with the frost will drag in winter and stand open in summer, so the foundations take the ground the gate stands on into account. The PAS 68 bollard foundations guide covers the foundations a bollard stands on, and the gate takes the same care with the ground under its posts.
The closer, the latch and the wear that lets a gate sag
A gate on a busy boundary opens and shuts a hundred times a day, and every opening works on the parts that hold it shut. The closer pulls the gate shut after each person, the latch catches it, and the hinges carry the weight through every swing, so the wear shows first where the parts move against each other. The round looks at the closer, the latch and the hinges in turn, and each fault is noted against the gate it belongs to, so the repair follows the fault instead of waiting for the gate to fail. A gate that is used by staff, residents and visitors in turn takes more openings in a day than a gate on a store, so the round is set by how often the gate is used, not by the calendar alone.
A gate that has started to sag tells the site in plain terms. The latch misses the keep, the gate drags on the ground, and the gap at the top grows wider than the gap at the bottom, because the hinges have worn or the posts have moved. The doorset was proved as one assembly, so the gate, the frame, the posts and the lock are checked together, and a latch adjusted without checking the posts will miss the keep again within the week. The fire door closers guide names the size and the fitting a closer needs, and the master key guide puts the keys for the whole site on one suite.
| Part | What wear looks like | What to do |
|---|---|---|
| Closer | Gate no longer shuts on its own | Closer power checked, closer replaced |
| Latch | Latch misses the keep | Hinges and posts checked first |
| Hinges | Gate drops and drags on the ground | Hinges replaced, posts checked for movement |
| Posts | Posts lean and gaps grow uneven | Posts re-set in concrete, gate re-hung |
Dragging on the ground is the last sign the gate gives, not the first
Dragging is the last sign, not the first, and the round should catch the wear before the gate reaches the ground. A hinge that has worked loose lets the leaf drop a little at a time, and a post that has moved in wet ground lets the whole gate lean, so the fixings on the hinges and the concrete round the posts are checked on the same visit. A gate that is lifted and re-hung without the posts being put right will drag again, because the posts carry the gate through every opening, and a post that gives way lets the gate drop with it. The maintenance checklist sets out the checks the round should make on each visit.
Keep the gate record beside the boundary schedule, with the gate, the lock and the reader on the same line, so each repair is tied to the fault it answers and the boundary is never left standing open. The gate automation guide covers the drive and the release on a powered gate. The LPS 1175 gates and grilles guide names the ratings for a gate and its grille, and the security gates cost factors guide sets out the build step by step.
Reading the rating: LPS 1175, EN 1627 and the attack a gate must take
The order names the rating the gate was proved to. Under LPS 1175, B3 holds three minutes, C5 holds five and D10 holds ten, each against the tool set for its category, all under Issue 8.2 of September 2024.
EN 1627 proves windows and doors against attack in classes RC1 to RC6, with each class naming the tools and the time the assembly must resist. The class on the order follows the risk behind the gate, not the size of the leaf. A gate on a yard that holds stock takes a higher class than a gate on a garden.
The rating belongs to the assembly, not to the leaf alone. The leaf, the frame, the posts and the lock were proved together, and a leaf swapped for another after the test leaves the gate different from the one tested. The LPS 1175 gates and grilles guide works through the ratings a gate and its grille can carry, and the LPS 1175 versus EN 1627 guide works through the two ratings side by side.
Locks, latches and the key that opens the gate
A gate lock must hold the leaf shut against the attack the rating names, and still open for the person who holds the key. A lock that holds the leaf but cannot be opened by the person behind it is no lock at all, because the gate must open for the people who belong on the site.
Cylinders that resist the drill take a 3-star set, with a 1-star cylinder and a 2-star handle together making the 3-star set to TS 007. The cylinder, the handle and the lock belong on the order beside the leaf, because the set is proved as one.
A latch that holds the leaf shut through the day must still let the gate open from the inside without a key, where the gate sits on an escape route. A panic bar to BS EN 1125 throws the latch when pushed, and the bar must work with the lock beside it, not against it. The school security doors guide covers the doors on a site where keys change hands often.
The handover: keys, fobs and the lost fob routine
A pedestrian gate is only as strong as the keys and fobs that open it, and the handover is where the list behind the reader is written. A resident needs the main gate and the gate to their own block, a cleaner needs the gates to the rooms they clean, and a manager needs them all, so one fob can carry all three patterns, because the list behind the reader decides which gate each fob opens, and the list is the lock. Write the entry plan onto the schedule beside the gates, with each gate, its reader and the people it must open for on the same line.
A lost fob must be stopped the day it is lost, because a fob that still opens the gate is a key in the wrong hands, and a fob costs nothing to stop while a key costs a new one. The routine should name who stops the fob, who holds the master key, and who holds the key that opens every gate, because a gate that cannot be opened by the person who holds the key is no gate at all. A cylinder that resists the drill and a handle that resists it too make the 3-star set together under TS 007, with the cylinder carrying 1 star and the handle 2 stars. The keys for the whole site are put on one suite in the master key guide, and the ratings a gate and its grille can carry are named in the LPS 1175 gates and grilles guide.
| Who | What they open | What the list names |
|---|---|---|
| Resident | Main gate, own block | Fob pattern, gates allowed |
| Cleaner | Rooms they clean | Fob pattern, hours allowed |
| Manager | Every gate | Master key, all gates |
| Visitor | One visit only | Intercom, release for that visit |
Consent comes before the order when the gate stands on a listed building
A pedestrian gate on a listed building, or on a boundary inside a conservation area, asks for more than a rating. The planning check comes before the order, because the gate must sit within the consent the building holds, and a gate fitted without it can be ordered down. The materials the consent allows belong on the order beside the leaf: iron, timber or steel in the finish the building already carries, so the gate reads as part of the boundary rather than a new line across it.
The rating still belongs on the gate, and the leaf, the frame, the posts and the lock were proved together, so a leaf swapped for another after the test leaves the gate different from the one tested. Under LPS 1175, B3 holds three minutes, C5 holds five and D10 holds ten, each against the tool set for its category, all under Issue 8.2 of September 2024, and EN 1627 proves windows and doors against attack in classes RC1 to RC6. The two ratings are put side by side in the LPS 1175 versus EN 1627 guide, the fence the gate stands beside is named in the crash rated fences and HVM fencing guide, the speed gates that guard a lobby are named on the pedestrian speed gates page, and the lobby line beside the doors is named in the turnstile versus speed gate versus portal guide.
Powered gates and the safety that stops the leaf hurting someone
A powered pedestrian gate opens at the push of a button, and the motor that moves the leaf must stop when a person is in its path. A powered gate answers to EN 12453, the standard that sets out how a powered gate must behave when a person stands in the path of the leaf.
Photocells watch the line the leaf travels, and a safety edge stops the leaf when it meets resistance. Loops in the ground hold the gate open while a person waits, and each device belongs on the order beside the motor, because a gate without them is a gate that can hurt someone.
The release must also work when the power fails. A gate that needs power to open is no gate at all in a blackout, so the manual release belongs on the order beside the motor. The gate automation guide covers the release that lets a powered gate open by hand, and the automatic gates cost factors guide works through what each step up the scale adds to the price.
Gates beside the vehicle line: one boundary, one schedule
Pedestrian gates and vehicle gates share the boundary, so they share the schedule. A boundary where the vehicle gate carries a vehicle rating and the pedestrian gate beside it carries nothing is a boundary with a hole in it, because the attack moves to the weakest part. The pedestrian gate and the vehicle gate beside it should carry the same forced entry grade, so the boundary holds as one.
Where the boundary must stop a vehicle as well as a person, the line is proved to ISO 22343-1, with the mass, the speed and the penetration named together. Test vehicles run from a 1,500 kg car to a 30,000 kg truck, at speeds of 48, 64 or 80 km/h. The ISO 22343 vehicle security barriers guide sets out the ratings in full, and the road blockers guide covers the barriers that stop a vehicle in its lane.
The gaps between the parts of the line matter as much as the parts themselves. ProtectUK guidance puts the maximum clear gap at 1,200 mm and the minimum height at 500 mm. The sliding vehicle gates guide covers the gates that run along a fence line, and the pedestrian gate beside them takes the same line.
Who passes and who does not: residents, staff and the visitor at the gate
The people who use a site do not all need the same gates. A resident needs the main gate and the gate to their own block, a cleaner needs the gates to the rooms they clean, and a manager needs them all. One fob can carry all three patterns, because the list behind the reader decides which gate each fob opens, and the list is the lock.
A visitor does not use the residents’ way in. The visitor presses the panel at the gate, the person inside sees who stands there and answers, and the gate opens for that visit alone. The intercom carries the voice to the flat, and the camera shows the face at the gate before the release is pressed.
The entry plan belongs on the schedule with the gates, naming each gate, the reader beside it, and the people who may open it. The turnstile versus speed gate versus portal guide covers the lobby line beside the doors, and the pedestrian speed gates page covers the speed gates that guard a lobby, not the boundary.
One schedule for the whole boundary: every gate on one line
Put the gate order together as one list, with a line for every gate on the boundary and the leaf, the lock, the grade and the reader beside each one, so the gate that arrives matches the gate that was proved. A schedule that names one gate for the whole boundary leaves the fitter to guess which gate takes which lock, and a guess is not a proof.
Check every line of each quotation against the schedule before the order goes out, so no gate, lock or reader is left off the price. Anything left off the quotation still has to be bought, and fitting it after the gate is hung costs more than ordering it with the gate. How the price moves with each step up the scale is covered in the security door cost factors guide.
The round that looks after pedestrian gates walks the boundary in turn and looks at the leaf, the hinges, the lock and the posts. Each fault is written against the gate it belongs to on the same day, with the part and the date beside it, so the repair follows the fault and the boundary never stands open. The security door maintenance checklist names the checks that keep a doorset honest through its life.
| Position | Gate | Grade | What to check |
|---|---|---|---|
| Main entrance | Pedestrian gate, hinged | LPS 1175 B3 | Leaf, hinges, lock |
| Staff entrance | Pedestrian gate, hinged | LPS 1175 B3 | Reader, closer, lock |
| Yard | Pedestrian gate, sliding | LPS 1175 C5 | Track, lock, posts |
| Escape route | Pedestrian gate, hinged | Release inside | Release, hinges, gap |
| Store | Pedestrian gate, hinged | LPS 1175 B3 | Leaf, lock, finish |
A gate holds only as long as the posts, the lock and the proof behind it, so the grade, the lock and the reader must all sit on the same schedule.
What rating should a pedestrian gate carry?
LPS 1175 B3, C5 or D10 to the risk behind the gate, or EN 1627 RC1 to RC6 where the order names the class.
How does a powered pedestrian gate stay safe?
Photocells, safety edges and loops to EN 12453, with a manual release that works when the power fails.
Can a pedestrian gate sit on an escape route?
Yes, where the gate releases from inside without a key, a code or a card, so the way out opens with one action.
Who keeps the gate record?
The person who runs the site, with the building file. The record should name every gate, the lock on it and the people who may open it.
What is the difference between a pedestrian gate and a speed gate?
A pedestrian gate guards the boundary line. A speed gate guards a lobby line inside the building.
If this is one of several openings on the site, the enquiry checklist shows the rating, hardware and evidence to name for each.
Get a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.