ArxBridge
Fire Door Regulations for Operating Theatres
An operating theatre suite runs on seven leaves, from its entrance to the plant room, and each leaf takes the fire period that its room needs.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
FD30 to EN 1634-1 guards the entrance leaf of an operating theatre suite, with the same period guarding the anaesthetic rooms, the scrub areas and the recovery bays, and FD60 guarding the operating theatres, the sterile store and the plant room.
Under EN 1634-1 a leaf is tested for periods that run from FD30 up to FD120, and the letters after the minutes say what the leaf stops, E where it stops flame, EW where it stops flame and some heat, and EI where it stops flame and heat together.
A theatre suite holds operating theatres where surgery runs through the list, anaesthetic rooms where patients are put to sleep, scrub areas where the team washes, recovery bays where patients wake, a sterile store where wrapped packs wait, and a plant room where the air handling kit runs, and the fire order follows the list pattern rather than a stream of walk in arrivals.
- FD30 / FD60Periods to EN 1634-1
- Sa / S200Smoke ratings to BS EN 1634-3
- 4 mm gapsGaps round every fire leaf
- Theatre corridorThe route from the theatres to the street
Seven leaves round a theatre suite: the period on each leaf
Seven leaves sit on a theatre suite fire order, and each leaf takes the period that fits the room behind it, with the entrance, the anaesthetic rooms, the scrub areas and the recovery bays sitting at FD30, and the operating theatres, the sterile store and the plant room sitting at FD60.
FD30 gives thirty minutes to the four leaves where staff and patients move through the list, and FD60 gives sixty minutes to the three leaves where surgery, sterile packs or air plant sit behind a shut leaf.
| Room | Period | Grade |
|---|---|---|
| Entrance | FD30 | B3 |
| Anaesthetic rooms | FD30 | B3 |
| Scrub areas | FD30 | B3 |
| Recovery bays | FD30 | B3 |
| Operating theatres | FD60 | C5 |
| Sterile store | FD60 | C5 |
| Plant room | FD60 | C5 |
A single report can hold both results for one leaf, with the fire minutes beside the forced entry grade, and the dual doorset guide shows how the two tests run together on that leaf.
What FD30 and FD60 hold back inside a theatre suite
The minutes belong to the whole doorset, not to the leaf alone, because the frame, the seals and the closer each carry part of them, and a leaf hung in another frame loses the minutes named in its report.
FD30 gives thirty minutes to the route out while staff move patients out of the anaesthetic rooms and the recovery bays together, and the operating theatres, the sterile store and the plant room take a full hour of FD60, because the rooms behind those three leaves hold surgery, sterile packs or air plant that must stay shut away from the rest of the suite.
State the letters with the minutes on the order, because E stops flame, EW stops flame and some heat, and EI stops flame and heat together, and a leaf ordered on minutes alone may stop the wrong thing.
Operating theatres, sterile store and plant room: three leaves that hold a full hour
Surgery runs behind the operating theatre leaf, which is why the leaf carries FD60, and it stays shut through each case, holding heat back from the sterile core while the list runs.
FD60 sits on the sterile store leaf as well, since the wrapped packs and drugs for the list sit behind it in counted stock. The plant room leaf takes FD60 for the same reason, because the fans and boards that move the air and light the theatres sit behind that leaf.
No one opens the sterile store leaf without its key, and at every other time the leaf stays shut, because the packs inside must stay sterile until the team fetches them. If that leaf were left open, heat and smoke would reach the packs before anyone in the theatres knew a fire had started.
The air handling plant in the plant room runs through the night as well as through the list, so the plant room leaf stays shut while no one is in the suite, and the hour it holds gives the night staff time to reach the suite and shut the corridor leaves behind them.
Checking the sterile store leaf without breaking sterility
The sterile store leaf carries FD60, because the wrapped packs behind it must stay clean until the team fetches them, and the leaf is the line between the sterile store and the theatre corridor. The key to the leaf sits with the theatre coordinator, and the leaf opens only when the team fetches packs for the list. Between fetches it stands shut, because the packs behind it must stay clean, and a leaf standing open gives heat and smoke a straight run at them.
The check on the leaf is done from the corridor side, so nobody walks into the store to look at it. The leaf is tried with its key and watched as it meets the frame, the seal is looked at where it sits in its groove, and the gap is read with a gauge held against the leaf, all without a foot crossing the threshold. The gap guide shows the gauge in use, and the reading it should give on a leaf like this one.
| Part | Right | Wrong |
|---|---|---|
| Closer | Leaf meets the frame on its own | Leaf stays open after a pass |
| Seal | Seated in the groove, unpainted | Split or painted over |
| Gap | Even at 4 mm round the leaf | Wider at the top than the bottom |
Behind the leaf sit the wrapped packs and the drugs for the list, counted stock that the team fetches as each case calls for them. The leaf guards that stock twice over, against flame on one side and against hands that have no key on the other, and a leaf that will not lock guards neither.
The seal round the leaf sits quiet until the heat reaches it, then it grows across the gap, starting near 200 degrees and finishing before 250, so the leaf that was checked from the corridor still holds when the fire reaches it. The intumescent seals guide follows the growth from first warmth to full close. A seal that cannot grow leaves the gap open when it must shut.
The seal, the gap and the key stand between the store and the theatre
The leaf, the frame and the hardware were proved as one set, and the report behind the period lists every piece that was tested beside the leaf. The proof behind the period sits in one report, and the certification guide lists the papers that report must hold before the leaf is hung.
The store leaf is one leaf in a line of leaves that divide the suite into parts, and each part holds fire and smoke apart from the next. The compartmentation guide shows the line those leaves draw through the building, part by part, and the hardware guide names the fittings proved beside the leaf, hinge and lock and closer together.
Before the first case of the day the list is walked leaf by leaf, and the sterile store leaf is tried with its key from the corridor side, so the store stays shut while its leaf is proved. A fault found on that walk goes on the list before the list of cases begins, and the leaf is mended in time for the next case to call for the packs behind it.
The suite is priced leaf by leaf, and the healthcare doors quote page wants each room with the period its leaf must hold, so the sterile store leaf is on that list with its hour beside it.
Entrance, anaesthetic rooms, scrub areas and recovery bays: FD30 on the way in and the way out
The entrance leaf, the anaesthetic room leaves, the scrub area leaves and the recovery bay leaves all sit at FD30, because those four leaves sit on the way out, and thirty minutes gives the route the time it needs while patients leave the bays and the anaesthetic rooms together.
At a list change the patients and their visitors head out together, so the leaf on the way out has to open under a crowd with no key and no code. BS EN 1125 puts the panic bar across no less than 60 percent of the leaf width where the leaf serves more than 60 people. The panic hardware guide shows those bars, and the emergency exit guide shows the leaves that carry them.
The recovery bays fill after each case and empty as patients move on to the ward, so the leaf beside them opens and shuts more often than any other leaf in the suite. A leaf that will not shut after a crowd has passed it gives its thirty minutes away, and the closer guide shows the closers that pull a leaf shut after every passage.
Smoke before flame on the theatre corridor: Sa and S200 beside the period
Smoke moves down the theatre corridor ahead of flame, so the leaves on the route from the theatres to the street carry a smoke rating to BS EN 1634-3, Sa for smoke at room temperature and S200 for smoke at 200 degrees.
A few leaves stand held open through a case by devices that let go when the alarm sounds, so each leaf closes by itself and the smoke stays on one side. The closer guide shows the closers that pull a leaf shut, while the smoke control guide shows leaves that keep smoke back.
While staff move a patient out of the theatre the smoke moves down the corridor, so the leaves on the route shut before it reaches the recovery bays, and the compartmentation guide shows how those leaves split the building into parts that hold fire and smoke apart.
Hinges, closers and seals that hold the theatre fire period in place
The hour on an FD60 leaf rests on three parts, the closer that pulls it shut, the seals that meet the frame and the gaps round the leaf that stay at 4 mm. A leaf left ajar gives its minutes away before the fire reaches it, and the gap guide shows how that 4 mm gap is measured.
A seal set in a groove round the leaf swells as the fire heats it, closing the gap while the flames grow. Heat near 200 degrees starts the swell, and by 250 degrees the seal has closed the gap round the leaf, and the seal guide shows how those seals behave once the heat rises.
Hinges on a theatre suite fire leaf are proved for 200,000 swings, with grade 13 rated at 120 kg and grade 14 rated at 160 kg, so the leaf still meets its frame after years of lists. The closer is proved to BS EN 1154, where EN 1 is the smallest power size the standard lists and no fire leaf takes less than EN 3, and the hardware guide sets out what each piece on the leaf must carry.
A fire leaf must shut on its own and still open under a light hand, so under BS 8300 and Approved Document M the push stays below 30 N through the first 30 degrees and below 22.5 N beyond them.
What the theatre doorset keeps out while the bed passes through
A bed leaves the theatre for the ward, and the door opens for it, then shuts behind it. The door is the line between the theatre and the corridor, and the air of the corridor stays on its own side while the door stands shut. A door that stands open after the bed has passed lets corridor air drift into the theatre, so the closer must draw it shut as soon as the bed is through. The bed passes, the door shuts, and the theatre is shut off from the corridor again. Each pass is the same, and the door must do the same job every time, opening wide for the bed and shutting tight behind it.
BS EN 1154 grades closers, and the grade on a theatre fire door is EN 3 at the lowest, because a weaker closer leaves the door standing open after the team has gone through. The closer pages give the grade a theatre fire door closer must carry, and the pull is set so the door meets its frame and stops, with no slam at the end of the swing.
| Pass | Door does | What follows |
|---|---|---|
| Bed leaves the theatre | Door opens wide for the bed | Corridor air waits outside |
| Bed clears the frame | Closer draws the door shut | Door meets its frame |
| Door stands shut | Strip sits in its groove | Theatre air stays inside |
| Closer pulls | Door meets its frame | No slam at the end |
The round reads the gap with a gauge at the latch side, and a reading past 4 mm means the door has sunk on its hinges since the last check. The gap pages cover the gauge, the reading and the latch side where the door drops.
After the pass, the seal keeps corridor air on its own side
As the heat climbs past 200 degrees the strip grows across the gap, and the growth is complete before 250 degrees, while a painted strip cannot grow and leaves the opening unguarded. The seal pages show the strip growing as the heat climbs, and a door with a strip that will not grow holds nothing back at all.
Every piece of the doorset was tested together, door and frame and ironmongery as one, and the report names each piece that stood in the test. The ironmongery pages run through the fittings proved with the door, hinge and lock and closer together.
The list is walked door by door ahead of the first case, and each door is opened and watched as it swings shut on its own, the strip looked at for paint and splits, and the lock turned with its key. The upkeep pages set out the jobs that keep a theatre door shutting as it should, and any fault found on that walk is listed before the first case starts.
When the suite orders its doors, the checklist that starts the enquiry wants each room with the period its door must hold, so the theatre doors that open for the bed arrive with closers and strips matched to the pass.
Alarm sounding mid operation: moving a patient who cannot walk out
The route to the street is marked by signs at every turn, because the alarm may sound while a patient is under anaesthetic and the team must find the way out without asking, and the signage guide shows the signs that sit on the leaf and along the route.
A patient under anaesthetic cannot walk out on their own, so the team moves the patient on the trolley to the recovery bays and then to the street, and the leaves on that route must open wide enough for a trolley with the team walking beside it.
Royal Assent for Martyn’s Law came in April 2025, and go-live is expected in spring 2027, with one tier for premises that hold 200 to 799 people and another for premises that hold 800 or more, so a suite that fills its recovery bays at a list change needs to know which tier it sits in. The Martyn’s Law guide shows the tiers and what each one asks of a venue.
Outside, the street front needs the same care as the route, because patients gather there once the alarm sounds and the suite stands empty, and bollards guard the front of the building with a clear gap of 1,200 mm at most between them and a height of 500 mm at least under ProtectUK. Vehicle impact ratings now run under ISO 22343-1:2023, which has taken the place of PAS 68:2013, while the bollard guide shows the posts that stand there.
One line per leaf on the order, checked against its room before signing
Each leaf gets one line on the order, naming its room, its period, its grade and its closer, and every line is read back against its room before the order is signed, so no leaf takes minutes that belong to another room. The proof guide shows the proof behind each leaf, and the specifying guide shows the leaf, the frame and the hardware as one set.
Before the first case the theatre coordinator walks the door list round the suite and tries each leaf in turn. A leaf that will not shut goes on the note that same morning, and the note stays open until a closer or a seal is put right and the leaf shuts on its own again.
The leaves are checked again at set points through the year, because a closer weakens and a seal wears with use, and the inspection checklist shows the checks that keep each leaf shutting as it should, while the maintenance guide shows the routine work that keeps the leaves in order.
Write the period, the grade and the closer for every leaf on one list, then check each line against its room before the order goes out.
What period should an operating theatre plant room door carry?
The plant room leaf takes FD60 to EN 1634-1, because the fans and boards behind it move the air and light the theatres.
What period should an operating theatre entrance door carry?
FD30 to EN 1634-1 sits on the entrance leaf, because it guards the way out from the recovery bays to the street.
Can an operating theatre leaf hold a fire period and a security grade?
Yes, one operating theatre leaf can be proved for fire and for forced entry together, and the two results stand side by side in one report.
Do operating theatre fire doors need a smoke rating?
Yes, the leaves along the route from the theatres to the street carry Sa or S200 to BS EN 1634-3, so the smoke stays on one side of the leaf while patients leave.
What happens when a fire door will not shut?
The theatre coordinator writes the leaf down that same morning, and the note stays open until a closer or a seal is put right and the leaf shuts on its own again.
Pricing doors for a hospital site? The healthcare doors quote page lists what one enquiry needs, department by department and room by room.
Get a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.