A rehabilitation centre holds residents through long stays with medicines stored on site, so each door takes the fire period its room demands, FD30 or FD60.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

A rehabilitation centre holds residents through long stays, and the fire rules for the building follow the rooms behind each leaf. The bedroom wing holds the rooms where residents sleep, the treatment rooms hold the therapy and the equipment, and the medicines store, the staff office and the plant room sit behind leaves the residents never pass. Residents move slowly, and some need help to leave, so the leaves on the way out matter as much as the leaves that hold flame back.

EN 1634-1 gives the minutes on a centre leaf, testing the leaf against fire and counting how long it holds. FD30 means thirty minutes and FD60 means sixty, and the letter with the minutes says what stayed out: E for flames alone, EW for flames and part of the heat, and EI for flames and heat together.

A rehabilitation centre is not a hospice, because the residents here are working toward going home, and it is not a care home, because treatment rooms sit beside the bedrooms. The ward is not a locked ward, so residents move freely through the day and the fire rules follow the rooms. The fire door regulations care homes guide names the fire rules for a home where residents live for years, and the fire door regulations hospitals guide names the rooms a hospital keeps behind its public floor.

  • FD30 / FD60Fire periods to EN 1634-1
  • Bedroom wingWhere residents leave from
  • Sa / S200Smoke ratings to BS EN 1634-3
  • One listEvery centre door named

Seven rooms in a rehabilitation centre: the period each leaf takes

Seven rooms make up the centre order, and the period follows what each room holds. The residents come in through the entrance, and the bedroom wing holds the rooms where they sleep through their stay. The medicines store keeps the medicines given through the day, the treatment rooms keep the therapy and the equipment, the staff office keeps the keys and the records, and the plant room keeps the building running.

The medicines store, the treatment rooms, the staff office and the plant room take FD60, because the medicines, the equipment, the records and the boards behind those leaves ask for sixty minutes before flame reaches them. The entrance, reception and the bedroom wing route take FD30, because the residents on that route can reach the street in less than thirty minutes.

The order gives every opening its own line, naming the leaf and the period beside it, and the table below puts the seven rooms beside their periods and grades, so the fitter checks each leaf against its own line as it is hung.

Room Period Grade What to check
Entrance FD30 B3 Leaf, glass, closer
Reception FD30 B3 Leaf, glass, closer
Bedroom wing FD30 B3 Leaf, glass, closer
Medicines store FD60 D10 Leaf, lock, seals
Treatment rooms FD60 C5 Leaf, lock, seals
Staff office FD60 C5 Leaf, lock, seals
Plant room FD60 C5 Leaf, lock, seals

What FD30 and FD60 hold back among the treatment rooms

A leaf earns its minutes as part of a doorset, leaf, frame, fixings and lock proved as one, and the report states the period that doorset holds. The order writes that period beside the leaf, so the leaf that arrives is the one the room asked for, and the fire door certification guide names what the report behind a period must hold.

One doorset can carry both proofs, fire minutes from EN 1634-1 and a forced entry grade from LPS 1175 Issue 8.2 of September 2024, in B3, C5 and D10, so a single report names both for the same leaf. The fire and security doors dual certification guide shows how the pair is proved on one leaf.

The letter beside the minutes matters as much as the minutes. E means the leaf stopped flame, EW means it stopped flame and part of the heat, and EI means it stopped flame and heat together, so the order names the letter with the minutes.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

FD60 on the medicines store, treatment rooms, staff office and plant room

The medicines store leaf takes FD60 and stays shut whenever no one is working behind it, because the medicines behind it are what the residents are given through the day. Sixty minutes is the hold that room asks for, because flame reaching it takes medicines residents cannot do without.

Treatment room leaves take FD60 as well, because the therapy equipment and the notes behind them are what the centre runs on. A leaf left standing open through the day holds nothing back, so each leaf is shut when the last person leaves the room.

Keys, records and paperwork sit in the staff office, and boards and equipment that keep the lights and the heating running sit in the plant room, so both leaves take FD60 because what sits behind them feeds the whole centre. The plant room fire doors guide covers the plant room leaves in full, and the plant room door requirements guide names the doors that guard the plant.

The bedroom wing and the way out: FD30 on the escape route

FD30 sits on the bedroom wing leaf and on the entrance leaf, because the residents sleep in the wing and reach the street through the entrance. Thirty minutes is more than the residents need to leave, and the route to the street is short.

Where the route serves residents who move slowly, a push bar proved to BS EN 1125 sits on each leaf on the way out, and the bar spans at least 60 percent of the leaf width, so a resident who reaches the leaf in a crowd opens it with one push. The panic hardware guide sets out what the bar must do when residents push against the leaf, and the emergency exit doors guide covers the leaves on the way out.

A glazed panel in the reception leaf lets staff watch the residents without opening the leaf, and the pane is proved with the leaf round it, with the glass, the bead and the fixings named together in the report. The fire door vision panels guide names the panels a fire leaf may carry, and the steel vs timber fire doors guide sets the two leaf materials beside each other.

Smoke in the corridors: Sa and S200 beside the period

Residents leaving the bedroom wing meet smoke before they meet flame, so the leaves on the way out carry a smoke rating beside their fire period. BS EN 1634-3 gives the two ratings, Sa for smoke at room temperature and S200 for smoke at 200 degrees, and the smoke control doors guide works through how the route leaves keep the smoke back while residents move past them.

A leaf that must stay open through the day is held by a hold-open device proved to BS EN 1155, and the device lets the leaf go on its own the moment the alarm sounds. The fire compartmentation guide names how the leaves hold the line between one part of the centre and the next, and a chair wedged under a leaf gives it no period at all while it stands open.

Smoke spreads along a corridor faster than residents walk, so the leaves between the bedroom wing and the entrance matter most. A leaf that shuts on its own after each person through keeps the smoke on one side.

Closers, seals and gaps on rehabilitation centre doors: what the period rests on

The hour on an FD60 leaf rests on the closer shutting it, the seals meeting the frame and the gaps staying narrow, because flame passes through a leaf left ajar in seconds and through a wide gap soon after. BS EN 1154 sizes closer power from EN 1, for a leaf 750 mm wide and 20 kg, up to EN 7, for a leaf 1,600 mm wide and 160 kg, and a fire door closer takes at least EN 3.

When heat of 200 to 250 degrees reaches the frame, the seal swells in its groove until it closes the gap, so flame and hot gas cannot pass, and paint over the seal stops it swelling. The 4 mm gap round a hung leaf is checked with a gauge, and the monthly round shows whether any gap has grown past that figure. The intumescent seals guide covers fitting the seal, the fire door closers guide covers what the closer must do, and the fire door gaps guide covers measuring the gaps.

Grade 13 hinges proved to BS EN 1935 carry 120 kg through 200,000 cycles, and grade 14 hinges carry 160 kg through the same count, so the heavier leaf takes the heavier hinge. BS 8300 and Approved Document M put the opening force below 30 N through the first 30 degrees and below 22.5 N after them, so a resident can push the leaf open without help. The fire door signage guide names what each sign must say.

The hold-open device holds the wing door open while the ward works around it

A wing door in a rehabilitation centre stands open through the day, held by a device proved to BS EN 1155, so beds, trolleys and therapy equipment pass without a hand on the door. The device holds the door against its closer all day and lets go the moment the alarm sounds, and the closer then draws the door back to its frame without a hand on it. That release is proved by testing it, not by trusting it.

The test is weekly, one door at a time, so the ward keeps working round it. Staff trip the release, watch the door swing shut, and notes whether it met the frame or stopped short, because a device that sticks holds the door open after the alarm and opens the corridor to smoke. The wing door that fails the test is taken off hold-open until it is mended, and it is shut by hand in the meantime. The closer guide sets out the sizes a wing door takes and the pull each size gives when the release lets go.

Smoke reaches the corridor while residents are still finding the way out, so the wing doors carry a smoke rating with their fire period. BS EN 1634-3 gives two ratings: Sa, which holds smoke at room temperature, and S200, which holds it at 200 degrees, and either one works only where the seal touches the frame without a break. A seal that has dried and shrunk opens a break at the top corner, and the weekly test is the moment to see it. The smoke control guide shows how a wing door keeps smoke on one side while residents pass.

Test step What to watch If it fails
Release Device lets go at once Door off hold-open until mended
Swing Door meets the frame alone Closer size checked and reset
Seal Strip touches the frame throughout Strip reseated before the next test
Record Date beside the room name Fault chased the same week

Test the release every week and write the result beside the door

BS EN 1154 gives closer sizes from EN 1 to EN 7, and a fire door takes nothing below EN 3, so the size is fixed door by door and written on the order beside each room. A closer below its size cannot pull a heavy wing door shut once the device lets go. The test shows which fault is present, because a door that swings shut slowly points at the closer and a door that stops short points at the frame. The maintenance guide sets out the work that keeps a wing door shutting through the year.

Missed tests are the risk, because a device that has never been tripped can stick without anyone knowing. The rota names the day and the person, and the result is written beside the door. The inspection checklist sets out what the weekly walk should look for on each door, and the exit guide follows the wing doors from the bedrooms to the street.

The wing list goes to the enquiry checklist with each hold-open device, its test date and its closer size beside the room, so the door that stands open all day still shuts when the alarm sounds.

Getting slow-moving residents out: the way from the bedroom wing to the street

The alarm may sound while a resident who has never used the building sits in a treatment room, so the route to the street is signed at every turn. The route stays clear day and night, and the entrance leaf opens to one push from whoever reaches it first, with the supply on or off.

Martyns Law sorts a venue into a tier by how many people it holds, one tier for 200 to 799 people and a higher tier at 800 and above, with Royal Assent in April 2025 and the go-live expected in spring 2027. The Martyns Law guide for premises sets out what each tier asks for, and a centre that holds 200 or more people falls in a tier it covers.

Staff walk the route with new residents on arrival, so the way out is known before the alarm ever sounds. A resident who knows the route leaves faster, and one who has walked it once does not stop to look for the way when the alarm sounds.

Let the leaf wait until the last wheelchair has cleared the frame

A resident who walks with a frame, or rides in a wheelchair, crosses a doorway slowly, and the leaf has to wait for that crossing. If the leaf swings back too soon it meets the frame in the opening and shuts the route on the resident behind, so the closer is set slow, giving the last wheel time to clear the frame before the leaf moves. A wing leaf that has to stay open all day is held by a BS EN 1155 device, which releases the leaf without a hand on it when the alarm sounds.

One hand is all a resident with a frame can spare for the leaf, so the push it asks for stays low. BS 8300 and Approved Document M cap that push at 30 N for the opening 30 degrees, and at 22.5 N once the leaf has swung past them, so a resident moves the leaf without letting go of the frame. The panic hardware guide names the bar that opens the leaf for a resident at the front of a group.

On a route that serves more than 60 people, BS EN 1125 asks the bar to run across at least six tenths of the leaf, so a single push from the resident at the front opens it for everyone behind. New residents are shown the way out on arrival, walking it once with staff, so the route is familiar before the alarm ever sounds. The emergency exit guide follows the leaves from the bedroom wing to the street.

Person What the leaf must do Check
Resident with a frame Stay open for a slow pass Closer set for a slow swing
Resident in a wheelchair Open with one hand Push below 30 N at first
Staff helping a resident Shut behind the pair Leaf meets the frame alone
Resident on the night round Open to one push Bar spans six tenths of leaf

The leaf shuts on its own, but the resident still opens it with one hand

The closer has two jobs that pull against each other: it must draw the leaf shut after a slow pass, and it must leave the leaf light enough for one hand to open. BS EN 1154 sizes closers from EN 1 to EN 7, and EN 3 is the smallest size a fire leaf is given, so the size is fixed leaf by leaf and written on the order beside each door. The closer guide works through the sizes a wing leaf takes and the pull each size gives.

The way out is marked at every turn, because the alarm can sound while a resident sits in a treatment room having never walked the route. The signage guide names the signs that mark the way from the wing to the street, and the route is kept free of chairs and trolleys, so nothing stands where slow feet must go.

Wing leaves are shut behind the last resident out, and the closer is worked each time the wing empties, because a leaf that will not shut by itself holds no minutes. The maintenance guide lists the work that keeps a wing leaf shutting through the year, and the security door enquiry checklist asks for the wing leaf by leaf, with a closer size written beside every door.

The rehabilitation centre fire door order: every leaf, its period and its proof

The order gives every opening in the centre a line of its own, with the leaf, the period, the lock and the closer written beside it. A leaf named once for the whole centre leaves the fitter to guess, and a leaf in the wrong room holds flame for the wrong time.

The order is checked leaf by leaf before it is signed, because a closer ordered after the doorset arrives holds the job up, and a leaf with no line beside it cannot be checked when it arrives. What the order must hold is named in the how to specify security doors guide.

Once a month the centre manager walks the building with the door list and works each leaf in turn. A leaf that drags, a closer that leaves a leaf standing open and a seal painted over in a refit are written against their own doors the day they are found. The fire door inspection checklist names what to look for on each leaf, and the fire door maintenance guide names the work that keeps the leaves holding.

Put the period, the grade and the lock on one line for each leaf, and check the line against the room before the leaf is hung.

What period should a rehabilitation centre medicines store door carry?

FD60 to EN 1634-1, because the medicines store holds medicines, and an hour is the hold that room demands.

What period should a rehabilitation centre entrance door carry?

FD30 to EN 1634-1, because the entrance is the way out and the public route needs half an hour.

Can one leaf hold fire and forced entry?

Yes, where one doorset passed the fire test and the forced entry test, so one report names the period and the grade for that leaf.

Do rehabilitation centre fire doors need a smoke rating?

Yes, the leaves on the route carry Sa or S200 to BS EN 1634-3 beside their period, because residents on the way out meet smoke before flame.

What happens when a fire door will not shut?

A leaf that will not shut is written up against its own door the day the fault is found, and the centre does not wait for the next look round.

Specifying fire doors for a rehabilitation centre?Send the door list and the period each room must hold for a tested door quotation.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.