Certified physical security

ArxBridge
Steel door sample in a security test frame with an assessor in a UK test laboratory

ArxBridge

Library Security Doors

A library keeps rare collections, archives and public counters behind its doors, so each leaf takes the grade the room behind it demands, shelf by shelf.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

A library is a reading room, a store and an archive under one roof, and the doors between them decide what stays where it belongs. The reading rooms hold the public, the stores hold the books the shelves run on, and the archive holds what the library cannot replace, so a door between one part and the next must hold the line between them.

The grade on a library door is LPS 1175, and the category follows the room behind the leaf. Under Issue 8.2, dated September 2024, B3 holds three minutes, C5 holds five and D10 holds ten. The entrance takes the lowest grade of the three, the staff rooms take a higher one, and the room that holds the archive takes the highest.

The rules for the shared parts of a public building are set out in the fire door regulations commercial buildings guide, and the doors that guard a museum take the same care with their collections, as the museum security doors guide shows. The library order names every door in the building, with the grade and the lock beside each one, so the door that arrives is the door the room needs.

  • LPS 1175 B3 / C5 / D10Forced entry grades to Issue 8.2
  • Archives and storesWhere the grade rises
  • FD30 / FD60Fire periods to EN 1634-1
  • One listEvery library door named

Entrances, reading rooms and stores: one library, three grades

A library is three buildings in one: the rooms where readers sit, the stores where the books wait, and the archive where the rare items are kept. The rules follow those parts, because a door between one part and the next must hold the fire on the side where it started while the readers reach the way out.

The reading rooms take the doors the public passes through all day, and each leaf must open for readers who have never touched it before. The stores take the doors the staff pass through with trolleys, and each leaf takes the period the way out needs.

The library schedule is written before the order goes out, naming every opening and the grade beside each one. A leaf ordered without a line on the schedule may arrive for the wrong room, and the wrong leaf on an archive door guards nothing.

The entrance door: the leaf every reader passes

The entrance door takes two jobs at once. It must open for every reader who arrives and hold an intruder out after closing, so the leaf, the frame and the lock are proved together as one doorset, and the report names each one.

The entrance leaf takes a closer that pulls it shut after every reader who passes, because a leaf left standing open is a door that guards nothing. The closer is set to pull the leaf shut without a slam, and the fitting is proved by opening the leaf and seeing it come home on its own.

A glazed entrance leaf lets the staff see who stands outside before the leaf opens, and the pane takes the same proof as the leaf itself. The fire rated glass cost guide works through what the glass itself costs, and the bead and the fixings that hold the pane are the ones named in the test report.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Reading rooms: the doors a whole floor shares

The reading rooms take the doors the whole floor shares: the study tables, the shelves and the quiet rooms, and each leaf must open for readers who have never touched it before. Each reading room leaf takes a release that throws the latch with one push, so the leaf opens even when the power has gone.

Doors between the reading rooms and the stores stand open through the day and shut at night. A leaf that stands open through the day needs a hold-open device proved to BS EN 1155, which lets the leaf shut on its own when the alarm sounds. A leaf kept open by a wedge is a fire door that holds nothing when the fire comes.

The reading room doors take the same care as the doors of an office building, and the fire door regulations offices guide sets out the rules for buildings that fill with people. The doors that hold smoke back while readers move past them are covered in the smoke control doors guide.

The archive and the rare books store: the doors behind the library

The archive holds the rare books, the manuscripts and the records the library cannot replace, and the leaf that guards it takes the grade the value behind it demands.

The rare books store beside the archive takes a leaf of its own, because the items the library lends out sit behind it. A store leaf takes the same grade as the archive door beside it, and the lock on it takes the same key as the librarian’s office.

The archive leaf takes a lock the staff control, because the readers must never pass it alone. A leaf that guards the archive takes D10, because it must hold longest, while the staff office beside it takes C5 and the entrance takes B3. Before Issue 8 the three categories were called SR2, SR3 and SR4, and the order names the category the product was proved under. No published table turns an LPS 1175 rating into a rating in another standard, so the order carries LPS 1175 alone.

The escape route for a whole floor: keeping the way out clear

The readers in a library follow the route the building gives them, and the way out must be clear when the alarm sounds. Each door on the route opens with one push from anyone who reaches it, because the leaf must open whatever the power is doing.

Smoke seals on the route doors are proved to BS EN 1634-3, Sa for smoke at room temperature and S200 for smoke at 200 degrees. Each seal must meet the frame all round, because smoke moves faster than flame and reaches the readers on the route before the fire does. One route takes one period on every leaf, because a leaf proved shorter than the leaves beside it is the leaf that fails first.

The stair cores take the doors that keep the way out clear, and each leaf takes the period the stair beside it takes. A fire that starts on one floor must stay on that floor, so the leaf between the floors holds the line while the readers move down. The hotel fire doors guide covers the doors that guard sleeping guests, and a library takes the same care with its stairs.

Access control in a library: fobs, codes and the librarian

Access control in a library is a list, and the list decides which fob opens which door. The staff fob opens the stores and the archive, and the public never holds a fob at all. A list that gives every fob every door gives the archive to anyone with a room.

The counter at the front takes the readers who borrow and the staff who serve them, and the leaf beside it takes the staff who cannot pass through the counter. Gates that count people in and out are covered in the security turnstiles guide.

The librarian’s office takes the highest grade on the order after the archive, because the room behind it holds the keys, the records and the takings. The lock the key turns is covered in the security door locks guide, and readers, releases and wiring beside a leaf are covered in the door entry systems guide.

One leaf, two proofs: fire and forced entry in a library

One leaf in a library can hold fire back and hold an intruder out, because the archive door needs both proofs on the same doorset. The fire result comes from EN 1634-1 in E, EW and EI from 30 to 120 minutes, and the forced entry result comes from LPS 1175 in B3, C5 and D10. Both results are run on the same leaf, frame and seals, so one doorset carries the report for both jobs.

Two ratings stand side by side in the LPS 1175 vs PAS 24 guide, and the keeping an LPS 1175 rating valid guide names what breaks a rating once a door is fitted.

Leave a 4 mm gap round the leaf, so it swings free and the seal closes the opening when the leaf shuts. Heat near 200 to 250 degrees makes the intumescent seal swell, unless paint laid over it holds it down. The fire and security doors dual certification guide sets out how one doorset carries both proofs.

The library order: one list for every room

The library order is written as one list, with a line for every door and the leaf, the period, the lock and the closer beside each one, so the door that arrives is the door the reading room, the store and the archive need. A list that leaves the period off a line leaves the fitter guessing, and a leaf ordered on a guess carries no proof.

Every leaf, lock, closer and seal in the library is priced from the list before the order goes out, line by line, so an entrance, a reading room door and an archive door each carry their own figure. The security door cost factors guide works through what each step up the scale adds to the price, and the how to specify security doors guide sets out the columns the list needs.

The librarian walks the library floor by floor, from the top down, and tries every door on the round: the entrance, the reading rooms, the stores and the archive. A fault is noted at the door where it was found, with the leaf, the part and the date beside it, so the repair is booked before the next term starts. The fire door inspection checklist sets out what a visit should look for, and the security door maintenance checklist covers the doors that must hold both fire and forced entry.

Position Door Grade What to check
Entrance Glazed leaf LPS 1175 B3 Leaf, glass, closer
Reading room Fire leaf FD30 Leaf, closer, seals
Staff office Steel leaf LPS 1175 C5 Leaf, lock, seals
Archive Steel leaf LPS 1175 D10 Leaf, lock, reader
Stair core Fire leaf FD60 Leaf, bar, closer

A library door holds only as long as the books behind it and the route beside it, so the grade, the period and the lock must all sit on the same list.

What grade should a library door carry?

The grade follows the room behind the leaf: B3, C5 or D10 to LPS 1175, with the archive taking a higher category than the entrance beside it.

Can one leaf hold fire and forced entry?

Yes, where one leaf, frame and lock were proved for fire and for forced entry together, so a single report holds both proofs.

Do library doors need access control?

The stores and the archive take a reader so only staff walk in, and the list behind the reader decides which fob opens the archive and the office.

What period should a library door carry?

FD30 or FD60 to EN 1634-1, with the letters beside the number naming what the doorset held back, and the room behind the leaf decides which period the door takes.

Who checks the library doors?

The librarian walks the round that covers every door, and the record of each visit stays with the building file.

Specifying doors for a library?Send the door list and the grade and period each door must hold for a tested door quotation.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.