Martyn's Law (Terrorism (Protection of Premises) Act 2025) explained: the 200 to 799 and 800+ tiers, and which physical security measures to consider.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Martyn’s Law is the Terrorism (Protection of Premises) Act 2025. It will place duties on premises where 200 or more people may be present, with a standard tier of 200 to 799 and an enhanced tier of 800 or more. This guide explains the tiers and the physical measures worth considering. It is not legal advice.

  • The ActTerrorism (Protection of Premises) Act 2025
  • Royal AssentApril 2025
  • The tiersStandard 200 to 799, enhanced 800 or more
  • RegulatorSecurity Industry Authority

Not legal advice. This is a plain-English summary of the Act’s structure. It is not legal advice. Check the legislation and official guidance, or speak to a solicitor, before acting on it.

What Martyn’s Law is

Martyn’s Law is the common name for the Terrorism (Protection of Premises) Act 2025, which received Royal Assent in April 2025. It creates duties for those responsible for certain premises and events to prepare for the possibility of a terrorist attack, with the aim of reducing harm to the public. Our Martyn’s Law standards page summarises the key facts.

The idea is proportionate preparation: plan in advance how people would be protected, rather than improvising during an incident. The duties scale with capacity, which is why the Act uses two tiers.

Standard tier vs enhanced tier

The tier depends on how many people may reasonably be expected at the premises at the same time. Standard tier covers 200 to 799 people. Enhanced tier covers 800 or more, and also covers qualifying events of 800 or more.

Tier Capacity What it means
Standard 200 to 799 people Lighter duties focused on procedures and preparedness.
Enhanced 800 or more people Stronger duties; those responsible must consider physical measures.
Qualifying events 800 or more attendees Treated under the enhanced tier.

Capacity is about the number of people who could be present, not the number expected on a quiet day. If your peak attendance crosses a threshold, the higher tier applies.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

What the Act does and does not require

The Act requires those responsible to assess the risk and put proportionate protective procedures and measures in place. For the enhanced tier, the Act expects physical measures to be considered as part of that assessment.

What it does not do is mandate specific products. The Act does not say you must install a named barrier, a rated door or a particular class of glazing. The choice of measures follows from your own risk assessment, which is why understanding the options matters more than buying hardware on day one.

That risk assessment belongs to the person responsible for the premises. It should be written down, dated, and revisited when the building use or capacity changes. A clear assessment is also what justifies the budget: it connects each measure to a named threat instead of to a catalogue.

The implementation period and the regulator

The Act provides an implementation period of at least 24 months from Royal Assent, giving premises time to assess, plan and act before duties bite. Use that window for the survey and specification work, not just the paperwork.

The regulator is the Security Industry Authority. It will oversee compliance once the duties are in force, so keeping your risk assessment, your reasoning and your evidence in one file is simple good practice.

How physical measures support the risk assessment

Physical measures turn a plan into protection. Hostile vehicle mitigation holds vehicles at a distance, which is what creates the stand-off that blast ratings assume. Barriers are rated under ISO 22343-1, which superseded PAS 68 and IWA 14-1, and a rating states the vehicle mass, speed, impact angle and penetration.

At the building envelope, blast resistant windows protect against the pressure wave, security doors rated to LPS 1175 resist forced entry, and LPS 1270 glazing controls hand-hole, arm-hole and body-passage attacks. Lockdown rooms give occupants somewhere safe to shelter while procedures run. Each measure answers a different part of the assessment, which is why public spaces usually need a mix rather than a single product.

None of this replaces the procedures the Act expects: evacuation, invacuation and lockdown plans, staff training and communication. Physical measures and procedures work as a pair.

Planters and benches with impact ratings can form part of a proportionate response. Our guide to HVM planters and street furniture explains how they fit a public realm scheme.

Why start during the implementation period

The implementation period is planning time, not waiting time. Surveys, risk assessments and specifications take months on a large estate, and rated products are made to order with lead times that follow the specification rather than the postcode. Starting early means specifying once, correctly, instead of rushing a second order later.

Early work also costs less to change. Moving a barrier line on a drawing is cheap; moving it after the concrete is poured is not. The same applies inside: choosing the glazing class before the frames are ordered avoids the expensive discovery that the specified glass needs a deeper frame.

Use the period to build the evidence file as well: the risk assessment, the reasons for each measure, and the test evidence for every rated product. If the regulator asks questions later, a dated file answers them.

Practical steps for premises in scope

  1. Confirm your tier. Work out the greatest number of people who could reasonably be present at one time.
  2. Assess the risk. Walk the site, list the threats that fit your location and use, and record your reasoning.
  3. Write the plan. Set out procedures for evacuation, invacuation, lockdown and communication.
  4. Consider physical measures. Where the assessment points to them, specify rated products with test evidence.
  5. Train and rehearse. Staff should know the plan before it is needed.
  6. Review regularly. Update the assessment when the use, layout or capacity changes.

Start during the implementation period, while there is time to survey properly and specify once. If you want help matching measures to your building, read our ISO 16933 guide and window film guide, or browse all ArxBridge guides.

Talking to your insurer and your supply chain

Insurers were asking about protective security before the Act, and the new duties give those conversations a sharper focus. An insurer cannot tell you whether you are compliant, because that is a legal question, but most will want to see that protective measures have been considered where the risk assessment points to them. Having the paperwork in order helps on both fronts.

Start with the risk assessment itself. Keep the written version current, note the date it was reviewed, and record which physical measures were considered and why each was accepted or set aside. A short written rationale beats a verbal one if questions come later. Where measures are installed, keep the test evidence with it: the rating of each doorset, the class of each glazed screen, the crash rating of each barrier line. Evidence is what turns a claim of protection into something checkable.

Then look at the supply chain. Physical measures only perform as specified if the products are what the schedule says and the installation matches the tested assembly. Ask suppliers for the test evidence behind each rating and keep it on file. For installation, use teams who fit the product as the tested assembly, because ad-hoc changes on site can undo the rating. Maintenance matters too: a lockdown door with a failed closer is not the measure the assessment assumed.

Keep a file. Risk assessment, product test evidence, installation records and maintenance logs in one place. It supports the insurance conversation and shows the assessment was acted on.

Review the file when the building changes. New entrances, changed opening hours, events with larger crowds and refurbishments can all move a premises between tiers or change which measures the assessment supports. A yearly review date in the diary keeps it from drifting. None of this is legal advice; where the duties are unclear for your premises, speak to a solicitor as well as your security adviser.

Does the Act name specific products we must install?

No. The Act does not mandate specific products. Enhanced tier premises must consider physical measures, but the choice follows from their own risk assessment.

We hold 750 people at peak. Which tier are we?

Standard tier covers 200 to 799 people, so 750 falls in the standard tier. If peak attendance could reach 800, the enhanced tier applies.

Is the Act in force yet?

The Act received Royal Assent in April 2025 with an implementation period of at least 24 months. Check official guidance for the current position before planning around a date.

Who enforces the duties?

The Security Industry Authority is the regulator named for the Act.

Do we still need procedures if we install physical measures?

Yes. Measures and procedures work together. Barriers and rated glazing protect the building; evacuation, invacuation and lockdown plans protect the people.

What counts as a qualifying event?

A public event where 800 or more people may be present at the same time. Qualifying events are treated under the enhanced tier, so the stronger duties apply to them as well.

Preparing premises under Martyn’s Law?Send us your capacity, site layout and risk assessment, and we will advise which physical measures fit your tier.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →