Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief
Enhanced tier premises must consider physical measures under Martyn's Law. The four measure areas, the assessment duty, and what to put in a specifier brief.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
Enhanced tier premises must consider physical measures under Martyn’s Law, not just write procedures. The four measure areas, the assessment duty behind them, and what a specifier needs to see.
- 800 or more peopleThe enhanced tier line
- Four measure areasMonitoring, movement, physical security, information
- Compliance documentProcedures and measures sent to the SIA
- Senior individualNamed to own compliance
Who the enhanced tier covers
The enhanced tier covers premises where 800 people or more may reasonably be expected to be present at the same time, at the busiest times. Qualifying events of 800 or more people are treated the same way. The count includes staff, and it turns on the busiest time.
There is one exception worth knowing before the count is done. Premises used for childcare, primary, secondary or further education, or as a place of worship, stay in the standard tier when 200 or more people may be present, even if the number goes to 800 or more. The Security Industry Authority page on Martyn’s Law and the SIA’s role as regulator sets out the tiers and the exception.
The four measure areas in the Act
Section 6 of the Act names four areas for public protection measures. They apply to enhanced tier premises and qualifying events only, and the responsible person must have appropriate measures in place in each area, so far as is reasonably practicable. The measures must be assessed and kept under review. The Home Office statutory guidance sets out the four areas and the examples for each.
Reasonably practicable means weighing the objectives against the cost, time and difficulty of putting a measure in place. A measure that is right for a city centre arena may not be right for a market hall, and the guidance warns against a one-size-fits-all approach.
| Measure area | What it covers | Examples |
|---|---|---|
| Monitoring | Watching the premises and its surroundings | CCTV, staff on the ground, radio contact |
| Movement | Controlling who goes in, out and around | Access control, screening, locks and shutters |
| Physical security | Strengthening the building and its perimeter | Barriers, stand-off zones, security glazing |
| Security of information | Keeping premises details out of hostile hands | Auditing public plans, limiting floor plans |
Measures work through people, processes and physical kit. Training is not a statutory requirement, yet if nobody at the premises knows how to carry out a measure, that measure is not properly in place. Our Martyn’s Law guide for premises gives the tier thresholds and the measures to consider.
Hostile vehicle mitigation and the perimeter
Vehicle as a weapon is one of the attack methods the guidance asks responsible persons to consider, alongside marauding attack, improvised explosive devices, fire as a weapon and hazardous substances. The physical security examples start outside the building: stand-off zones that increase the distance between vehicles and the premises, pedestrianised arrival routes, and barriers that stop a vehicle-borne attack.
A vehicle security barrier can take many forms: hostile vehicle mitigation, bollards, street furniture, fences, walls, gates, blockers, bunds, berms and planters. The choice follows the approach a vehicle could take and the space the site allows. One worked example describes a shop that judged bollards appropriate but not reasonably practicable at once, and set a plan to fit them in phases over the next few years.
A barrier line fails at its weakest gap. A rated bollard at the front door means little if a service yard round the back lets a vehicle reach the same wall.
Our hostile vehicle mitigation page covers the ratings and the barrier types, and the ISO 22343 guide explains how to read a rating. Planters and benches can carry a rating too, and our HVM planters guide shows how they are used in a public realm scheme.
Access control and the movement of people
Movement measures control, prohibit, restrict or reduce the movement of people into, out of and within the premises. Access controls are likely to be a fundamental part of most security regimes, and at many sites a perimeter is already obvious from the walls, fences or boundaries, with public access limited to certain doors, gates or vehicle entrances.
At the simple end, managing access can mean counting visitors in and out, or checking tickets, passes or identification. Larger premises may need more: passes for certain areas, screening of people and bags, and search policies at the entrance. The guidance gives a hospital example where staff entrances use automated access control with a pass and a PIN, fire exits are alarmed and monitored from a central control room, and ward access is by staff pass or doorbell entry.
Access control also serves the lockdown procedure. Locks, shutters, screens and barriers can secure the premises out of hours, secure back of house areas, or secure parts of the premises during a lockdown. Our turnstiles guide covers entrance control for a busy building.
Lockdown doors and the building envelope
Lockdown is one of the four public protection procedures, and it means securing the premises to prevent individuals entering or leaving, for example to restrict the movement of an attacker by locking doors, closing shutters or using available barriers. The doors that make a lockdown work are the ones that can be locked quickly and that hold when they are locked.
The guidance also names protective and security glazing: blast-resistant facades, glass and doors, safety glass and anti-shatter film. Glass can shatter and cause very significant injuries in an explosive device or vehicle attack, and anti-shatter film can be an appropriate mitigation where stand-off distance already limits the effect of a larger device. One cinema example weighed film against cost and effect, and chose a stand-off zone built from street furniture instead.
Physical measures must not clash with the procedures they support. Movement measures should be considered when planning an evacuation, invacuation or lockdown, and other legislation, including fire safety, must be taken into account. A door that locks an attacker out must still let people out when the fire alarm sounds.
The compliance document and the senior individual
Enhanced tier premises and qualifying events must do more than put measures in place. They must document the procedures and measures, assess how they reduce the risk of physical harm and the vulnerability of the premises, and send that document to the SIA. A revised compliance document must be sent to the SIA within 30 days of its revision.
Where the responsible person is an organisation rather than an individual, it must assign a member of staff involved in the management or control of the organisation to be responsible for ensuring compliance. That person is called the senior individual, and the same rule applies to qualifying events run by an organisation.
Both tiers must notify the SIA who the responsible person is, once the law comes into effect, through an online portal the SIA is building. The SIA will invite volunteers to test it from early 2027. Our Martyn’s Law standards page summarises the tiers, the implementation period and the regulator.
What to put in a specifier brief
A specifier brief for enhanced tier work starts with the figures the tier turns on: the greatest number of people who may be present at the same time, and how it was worked out. Add the layout: entrances, exits, the perimeter, the vehicle approaches, the queueing areas and the rooms where people gather.
Next comes the assessment itself. Name the attack methods considered, the measures already in place, and the gaps found. For each gap, say what is proposed and why, and record the measures considered and set aside, with the reason. That written rationale shows the reasonably practicable test was applied, and it is what the senior individual relies on for the compliance document.
Close the brief with the evidence and the review. Every rated product should arrive with its test evidence, and the brief should say who checks it and where it is filed. Set a review date, because the duty is to keep measures under review, and a change in use, layout or capacity can move a premises between tiers. The transport hub guide shows the same thinking for a crowded building type.
Does the Act name the products an enhanced tier premises must install?
No. The Act requires appropriate measures to be considered and put in place so far as is reasonably practicable. The guidance gives examples, not a shopping list, and the choice follows the risk assessment.
What are the four public protection measure areas?
Monitoring, movement of people, physical safety and security, and security of information. They are for enhanced tier premises and qualifying events, and each must be appropriate and reasonably practicable.
Who is the senior individual?
Where the responsible person is an organisation, a member of staff involved in its management or control must be assigned to own compliance. That person is the senior individual.
Must the compliance document go to the SIA?
Yes, for enhanced tier premises and qualifying events. The document states the procedures and measures in place and assesses how they reduce risk, and a revised copy must be sent within 30 days.
Can a measure wait if it is not reasonably practicable now?
The duty is to put in place what is appropriate so far as is reasonably practicable, weighing objectives against cost, time and difficulty. A measure judged not practicable now should be recorded with the reason, and reviewed when circumstances change.
Contact us for a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.