How to Write an Operational Requirement for Physical Security
An Operational Requirement turns a risk assessment into measures a site can buy. Learn the six steps, the five areas, and what each element must state.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
An Operational Requirement is the document that turns a risk assessment into a set of measures a site can buy. It states what the site must protect, what threatens it, and what the protection must achieve, before any product is named.
- OR in one lineSecurity needs, stated from the risks faced
- Six stepsTwo templates, from risk to measures
- Five areasBeyond the perimeter to the asset
- Two levelsOverall need, then detail per area
What an Operational Requirement is
NPSA describes an Operational Requirement, known as an OR, as a clear, considered and high level statement of an organisation’s security needs, based on the risks it faces. It is the document that sits between the risk assessment and the specification. The risk assessment says what could go wrong. The OR says what the site must do about it. The specification says which products will do it.
A well-defined OR increases the likelihood of success in any security project and reduces the risk of commissioning expensive nugatory work. That is NPSA’s own wording, and it explains why the OR comes first. NPSA has recommended the use of an OR process for many years, after observing projects where security requirements were poorly defined or developed in isolation. Where NPSA has been asked to assist in failing security projects, in almost all cases an OR process had not been followed, and in many cases a full risk assessment was also absent.
The involvement of key stakeholders in the OR process increases executive buy-in for the project, which simplifies any organisational change the measures require. An OR is therefore not a form to fill in at the end. It is the workshop where the site agrees what it needs, before anyone talks to a supplier.
Start with the risk assessment, not the product
The OR process follows on from a risk assessment process and leads to the application of effective and proportionate protective security measures. The OR uses a prioritised list of security risks to develop the measures. If the risk assessment is missing, the OR has nothing to work from, and the measures it produces will be guesses.
NPSA puts it bluntly in its fences and gates guidance: developing security measures outside of a structured process often leads to incomplete, inadequate or costly measures.
The threats an OR must consider include criminality, hostile state actors, terrorism and unlawful protest. The perimeter guidance lists what those threats are used for: to deter hostile reconnaissance and attack, to support the detection of intruders, to frustrate and delay entry, and to assist the response to a security incident. A threat that is not named in the OR will not be answered by the specification.
Split the site into five areas
The first step of the NPSA OR process is to split the site up, defining the geographical areas for consideration. NPSA recommends five generic areas, which fit most sites: Beyond the Perimeter, Perimeter, Within the Site, Building, and Asset. Each area is considered in turn, and the risks are mapped to the areas they touch.
This matters because a threat does not stop at the fence. A vehicle threat starts beyond the perimeter, where approach speed is set. It meets the perimeter, where a barrier must stop or delay it. It continues within the site, where stand-off distance decides how much blast reaches the building. It ends at the building and the asset, where doors, glazing and walls must hold. An OR that looks only at the front door will miss the approach.
NPSA provides principles for each area, and the specifier records the risks that apply to each. The data centre physical security guide works through the same idea zone by zone, and the NPSA forced entry and blast guidance shows how a threat assessment leads to a performance requirement for each element.
The six steps, in order
NPSA sets out six recommended steps in the OR process, completed over two templates. The steps run in order, and each one feeds the next.
| Step | What you do | What it produces |
|---|---|---|
| 1. Split the site | Define the geographical areas for consideration | Five areas, from beyond the perimeter to the asset |
| 2. Define the risks | Map the risks to the areas they touch | A prioritised risk list, tied to places |
| 3. Develop recommendations | Identify protective measures for each risk | A suite of measures to address the risks |
| 4. Assess the measures | Judge each measure by likelihood of success | Measures ranked by how well they work |
| 5. Map back to risks | Check whether the risks are mitigated | Residual risk, and whether it is acceptable |
| 6. Implement | Put the measures in place, and plan next steps | Measures installed, with a record of decisions |
Step five is the one most often skipped. Mapping the measures back to the risks asks whether the risks have been mitigated, and whether the residual risk is acceptable. A measure that looks strong on its own may leave a risk untouched, and only the mapping shows it. Record as much detail as possible during the process; NPSA provides blank templates for the two stages.
The OR works in two levels. The Level 1 OR gives the overall statement of the security need. The Level 2 OR gives the detail for each area of concern, with its own vulnerabilities, functions and performance requirements. A Level 2 OR can be used to investigate existing and proposed measures, and to highlight vulnerabilities that need attention.
Threat, asset, standard, performance
Every element in an OR must state four things: the threat it answers, the asset it protects, the standard it must meet, and the performance it must achieve.
The threat is the attack the measure must defeat: a forced entry attempt with hand tools, a marauding attacker with a blade, a vehicle used as a weapon, or a bomb at a given stand-off. The asset is what is being protected: people, a trading system, a control room, or the building itself. The standard is the test the product must pass, such as LPS 1175 Issue 8.2 for forced entry, or ISO 22343-1 for a vehicle barrier. The performance is the level within that standard, such as a rating grade or a delay time.
The NPSA Catalogue of Security Equipment guide explains how a listing proves the standard and the rating together, and the comparison of LPS 1175 and EN 1627 shows why the two scales cannot be read as one. Our comparison of Secured by Design, NPSA and LPCB sets out which body fits a brief that names more than one.
Who signs off, and what they accept
An OR is signed off by the risk owner, with the stakeholders who will live with the measures. NPSA’s temporary barriers note states the rule plainly: it is the risk owner’s responsibility to sign off a scheme, and they should only do so after they have been made aware of the risk, been taken through potential mitigations, and made an informed decision that leaves them with a level of residual risk they are comfortable with.
That sign-off is the point of the whole process. The OR records what was decided, what was accepted, and what residual risk remains. If the threat changes, or the site changes, the OR is the document that shows what was agreed and why. The Martyn’s Law enhanced tier guide covers the same discipline for venues, where the duty holder must be able to show what was done and why.
A requirement that names a product before it names the threat is a shopping list. Name the threat first, and the product follows.
Sign-off should also cover who operates the measures. A barrier that no one knows how to move, a door that no one can open quickly, or a system that no one maintains will fail in use, whatever its rating. The HVM project cycle runs design, build, operate, and the operate stage decides whether a scheme succeeds or fails.
From the requirement to the specification
Once the OR is signed off, the specification is drawn up from it. It should include all the critical design elements required, but leave the responsibility for a final working design with the contractor. The OR states what must be achieved; the contractor states how.
The specification should name the standard and the rating for each element, and the evidence to be supplied. For a barrier, it means the impact rating and the delay rating, and the tested configuration they apply to. For a doorset, it means the standard, the rating, and the listing or certificate behind it. The ISO 22343 guide breaks a rating code into its parts, and our hostile vehicle mitigation page sets out the barrier types and the codes they carry.
Finally, the OR is a living document. When the threat changes, when the site is extended, or when a measure is replaced, the OR should be revisited. A specification written from an out-of-date OR will answer yesterday’s threat. The due diligence guide for vehicle security barriers shows the same discipline applied to buying, and the forced entry, ballistic and blast rating guide shows how the threat decides which rating a site needs.
What is an Operational Requirement?
It is a high level statement of what a site needs for its security, written from the risks the site faces. It comes after the risk assessment and before the specification.
Who should write the OR?
The security manager, working with the risk owner and the stakeholders who use the site. NPSA provides step by step guidance and worked examples so a security manager can run the workshop.
What is the difference between a Level 1 and a Level 2 OR?
Level 1 states the overall security need for the site. Level 2 gives the detail for one area of concern, with its vulnerabilities, the function of each measure, and the performance each measure must achieve.
Does every site need an OR?
Any site that is buying protective security measures benefits from one. NPSA recommends the OR process for any security project, and notes that failing projects almost always skipped it.
When should an OR be reviewed?
When the threat changes, when the site changes, or when a measure is swapped out. The OR is the record of what was decided and why, so it should stay current with the site.
Contact us for a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.