Fire Door Rules for Ice Rinks

An ice rink moves crowds in skates past hire desks, lockers and a cafe, so each door takes the fire period its room demands, FD30 out front and FD60 behind.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

An ice rink holds a rink hall, a cafe, locker rooms and a skate hire desk beside the ice, and the fire rules follow the rooms behind each leaf. Skaters eat in the cafe, change in the locker rooms and hire skates at the desk, while the staff office and the plant room sit behind leaves the skaters never pass. People leave in skates and move slowly, so the leaves on the way out matter as much as the leaves that hold flame back.

EN 1634-1 gives the minutes on a rink leaf, testing it against fire and counting how long it holds. A leaf marked FD30 holds for thirty minutes and a leaf marked FD60 for sixty, and the letter after the minutes names what the leaf stopped, E for flame on its own, EW for flame with part of the heat, and EI for flame with the heat as well.

An ice rink is not a leisure centre, because one rink hall takes the place of sports halls and pools, and it is not a bowling alley, because the rink hall and the skate hire desk take the place of lanes and shoe hire. The fire door rules for leisure centres name the rules for a building full of sports halls, and the fire door rules for bowling alleys name the rooms a hall of lanes keeps behind its public floor.

  • FD30 / FD60Periods to EN 1634-1
  • Cafe and rink hallWhere skaters eat and skate
  • Sa / S200Smoke ratings from BS EN 1634-3
  • One listEvery rink door named

Eight openings in an ice rink: a period beside each room

Eight openings make up the rink order, and the period follows what each room holds. Skaters come in through the entrance, hire at the desk, eat in the cafe and change in the locker rooms, while the first aid room holds the kit for a fall, the staff office holds the takings and the records, and the plant room keeps the ice cold.

The staff office and the plant room take FD60, because the records and the ice plant behind them ask for sixty minutes. The entrance, the skate hire desk, the locker rooms, the cafe, the rink hall and the first aid room take FD30, because the skaters on that route can reach the car park in less than thirty minutes.

Every opening gets a line of its own with leaf and period written beside the room, and the table below puts the eight rooms beside their periods and grades.

Room Period Grade What to check
Entrance FD30 B3 Leaf, glass, closer
Skate hire desk FD30 B3 Leaf, glass, closer
Locker rooms FD30 B3 Leaf, lock, seals
Cafe FD30 B3 Leaf, glass, closer
Rink hall FD30 B3 Leaf, lock, closer
First aid room FD30 B3 Leaf, lock, seals
Staff office FD60 C5 Leaf, lock, seals
Plant room FD60 C5 Leaf, lock, seals

Fire minutes from EN 1634-1 can sit beside a forced entry grade from LPS 1175 Issue 8.2 of September 2024 on the same doorset, so one report names both proofs. How the pair is proved on a single leaf is shown in the dual certification guide for fire and security doors.

Sixty minutes behind shut leaves: FD60 in the staff office and plant room

The period belongs to the whole doorset and not to the leaf alone, so the leaf, the frame, the fixings and the lock are proved together and the report states the period they hold. The fire door certification guide names what the report behind a period must hold.

FD60 sits on the staff office leaf, which stays shut whenever no one is working behind it, because the takings and the records in that room are what the rink runs on. The room asks for sixty minutes, because flame reaching it takes the papers the rink cannot do without.

The plant room fire doors guide sets out what the plant room leaves must do, and the plant room door requirements guide names the doors that guard the plant.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Thirty minutes on the way out: FD30 from rink hall to car park

FD30 sits on the rink hall leaf, the locker room leaves, the cafe leaf and the entrance leaf, because skaters skate in the hall, change in the locker rooms, eat in the cafe and reach the car park through the entrance. Thirty minutes is more than the skaters need, and the route to the car park is short.

Where the route serves skaters who move slowly in boots, a push bar proved to BS EN 1125 sits on each leaf on the way out, because more than 60 people may crowd the route at once, and the bar spans no less than 60 percent of the leaf, so a skater who reaches it opens it with one push. The panic hardware guide sets out what the bar must do when skaters push against the leaf, and the emergency exit doors guide covers the leaves on the way out.

A glazed panel in the cafe leaf lets staff watch the skaters without opening the leaf, and the pane is proved with the leaf round it, glass, bead and fixings named in the report. The fire door vision panels guide names the panels a fire leaf may carry.

Smoke before flame: Sa and S200 along the rink corridor

Skaters leaving the rink hall meet smoke before they meet flame, so the leaves on the way out carry a smoke rating beside the period. BS EN 1634-3 gives the two smoke ratings, Sa for smoke at room temperature and S200 for smoke at 200 degrees, and the smoke control doors guide works through how the route leaves keep smoke back while skaters move past them.

A leaf that must stay open through the day hangs on a hold-open device proved to BS EN 1155, which lets it go on its own the moment the alarm sounds. The fire compartmentation guide names how the leaves hold the line between one part of the rink and the next, and a chair wedged under a leaf leaves it with no period while it stands open.

Smoke spreads along a corridor faster than skaters walk in boots, so the leaves between the rink hall and the entrance matter most. A leaf that closes on its own after each person through holds the smoke on one side of it.

Closers, seals and gaps on ice rink doors: what the period rests on

An FD60 leaf holds its hour only when the closer shuts it, the seals meet the frame and the gaps stay narrow, because flame passes through a leaf left ajar in seconds and through a wide gap soon after. BS EN 1154 runs closer power from EN 1, for a leaf 750 mm wide and 20 kg, to EN 7, for a leaf 1,600 mm wide and 160 kg, and a fire door closer is never below EN 3.

Once the heat reaches 200 to 250 degrees the seal grows in its groove and closes the gap, so flame and hot gas find no way through, while paint on the seal keeps it from growing. The 4 mm gap round a hung leaf is checked with a gauge on the monthly round. The intumescent seals guide covers how the seal is fitted, the fire door closers guide covers what the closer must do, and the fire door gaps guide covers how the gaps are measured.

Hinges proved to BS EN 1935 run through 200,000 cycles, grade 13 rated for 120 kg and grade 14 for 160 kg, so the heavier leaf is hung on the heavier hinge. BS 8300 with Approved Document M caps the push at 30 N through the first 30 degrees and at 22.5 N once the leaf has passed them, so a skater can open the leaf without help. The fire door signage guide names the signs each leaf must carry.

Moving skaters out in boots: the route the rink rehearses

The route to the car park is signed at every turn, because the alarm may sound while a visitor who has never used the building sits in the cafe. The route stays clear day and night, and the entrance leaf opens to one push from whoever reaches it first, with the power on or off.

Martyns Law sorts a venue by the number of people it holds, with one tier covering 200 to 799 people and a higher tier starting at 800, after Royal Assent in April 2025 and a go-live expected in spring 2027. What each tier asks for is set out in the Martyns Law guide for premises, and a rink holding 200 or more people falls in a tier it covers.

Bollards beside the car park keep vehicles clear of the way to the entrance, and ProtectUK caps the clear gap between them at 1,200 mm and sets their height at no less than 500 mm. How the bollards are chosen is covered in the choosing HVM bollards guide.

The cafe leaf and the first aid leaf: FD30 where skaters rest and recover

The cafe leaf takes FD30, because skaters eat and drink in the cafe between sessions and the route out runs through it. Thirty minutes is the hold that room asks for, because the cafe clears fast once the alarm sounds.

The first aid room leaf takes FD30 as well, because the kit for a fall on the ice sits behind it and the room must stay shut between uses. A skater hurt on the ice is carried to the first aid room through the rink hall leaf, so the leaves on that short route matter as much as the leaves on the way out.

A cafe in a restaurant asks for the same period on its leaves, as the fire door rules for restaurants show.

Placing the ice rink fire door order: period, grade and proof on one line

Every opening gets a line of its own on the order, with leaf, period, lock and closer written beside it. A leaf named once for the whole rink leaves the fitter to guess.

Each leaf on the order is checked before it is signed, because a closer ordered after the doorset arrives holds the job up, and a leaf with no line beside it cannot be checked on arrival. The how to specify security doors guide names what the order must hold.

Once the rink opens, the manager goes round with the door list and tries each leaf in turn, because a leaf that sticks after the overnight freeze will not shut when the hall fills. A leaf that drags, a closer that holds a leaf ajar, and a seal that has lifted from its groove are marked beside their own rooms before the first session starts. The fire door inspection checklist sets out the faults to watch for on the round, and the fire door maintenance guide covers the routine that keeps each leaf shutting flat against its frame.

Write the period, the grade and the closer on one line for each leaf, and check the line against the room before any leaf is hung.

What period should an ice rink plant room door carry?

FD60 to EN 1634-1, because the plant room holds the ice plant, and an hour is the hold that room demands.

What period should an ice rink entrance door carry?

FD30 to EN 1634-1, because the entrance is the way out and the route to the car park takes less than half an hour.

Can an ice rink leaf hold a fire period and a security grade?

Yes, when one doorset passes both the fire test and the forced entry test, a single report gives the period and the grade for that leaf.

Do ice rink fire doors need a smoke rating?

Yes, the leaves on the route carry Sa or S200 to BS EN 1634-3 beside their period, because skaters meet smoke before flame.

What happens when a fire door will not shut?

A leaf that will not shut is written up against its own door the day the fault is found, and the rink does not wait for the next look round.

Specifying fire doors for an ice rink?Send the door list and the period each room must hold for a tested door quotation.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.