Fire Door Rules for Colleges

A college fills with students between lessons, so each fire door takes its period from the room behind the leaf, from classroom to plant room.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

A college is a building where students move in crowds between lessons, carrying books and tools through corridors they know only by the timetable, and the fire doors stand between the teaching rooms and the corridors they use. Each leaf holds a fire where it starts while the students find the way out, and the period on the leaf follows the room behind it, because a classroom, a workshop and a plant room ask different things of the doors that guard them.

The fire rules for school buildings are set out in the fire door regulations schools guide, and the doors of a university are covered in the university security doors guide. A college sits between the two, with the crowds of a school and the workshops of a university, and its order names every door in the building, with the period and the hardware beside each one.

Before a single leaf is ordered the college sets down its fire plan, naming the period each opening must hold and the route each student must follow, and the order follows that plan door by door.

  • FD30 / FD60Fire periods to EN 1634-1
  • Sa / S200Smoke proof to BS EN 1634-3
  • EN 3Smallest closer power to BS EN 1154
  • One listEvery college door named

Classrooms, workshops and offices: one college, three periods

Three kinds of room share one college roof: classrooms full of students and desks, workshops full of tools and materials, and offices full of records and fees. The rules follow the rooms, because a leaf between a classroom and a workshop must hold fire back while the students on the other side find the way out.

The classrooms take the doors the students pass through between lessons, and each leaf must open for a student with books in hand who has never read the fire plan. The workshops take the doors the tutors open and the students never open alone, and each leaf must hold fire back where the tools and the materials sit.

The plan names each opening with its door, so a leaf ordered for the workshops never ends up guarding a classroom corridor.

FD30 and FD60 across a college: the periods each part takes

Each part of a college asks a different period of its doors, because the load behind each leaf is different. The classroom corridor holds students and desks, the workshops hold tools and fuel, and the plant room holds the machinery that serves the whole building, so the period is set by the room, never by the leaf alone.

A fire door takes its period from a test to EN 1634-1, where the leaf faces flames and heat and the minutes are counted. The proof is written as minutes beside letters, and the letters say whether the leaf stopped flames alone, flames with some heat, or flames with the heat as well.

The heavier leaf costs more to make and more to hang, because the frame must be deeper and the hinges stronger, so the figure climbs as the period climbs. Where the opening asks for 60 minutes, a 30-minute leaf is the wrong leaf, because the shortest proof in the wall is the one that gives way first.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

The classroom corridor: students, lessons and the doors between them

The classroom corridor runs past every teaching room in the college, and the doors on it must hold their proof while letting students pass with books and bags all day. A glazed leaf lets a tutor see the corridor beyond it without opening the leaf, and the pane takes the same proof as the leaf, because the leaf and the glass are proved as one doorset.

The desks and the fittings in a classroom carry a fire load of their own, and the doors between the corridor and the workshops must hold the fire where it starts. The workshop side of that wall takes the period the workshops demand, because the fire that starts among the tools must stay among the tools while the students move out.

The windows that share the same wall are covered in the fire rated windows guide, and what the glass itself costs is worked through in the fire rated glass cost guide.

Workshops and stores: the doors behind the teaching rooms

The workshops take the heaviest fire load in the college, because the tools, the materials and the fuel sit there all day. A workshop leaf takes FD60, and the period follows the fire load, not the size of the room.

The stores beside the workshops take the same care, because the spares and the materials sit behind their doors. A stores leaf takes FD60 where the stores sit beside the workshops, because the fire that starts among the materials must not reach the teaching rooms.

A leaf on a workshop or a stores room often carries two proofs at once, because the rooms behind it need fire held back and an intruder held out. The forced entry side follows LPS 1175 Issue 8.2 of September 2024, with B3 holding three minutes, C5 five and D10 ten. The LPS 1175 vs PAS 24 guide puts the two ratings side by side, the keeping an LPS 1175 rating valid guide lists the faults that undo a rating after the door is fitted, and the fire and security doors dual certification guide explains how a single doorset holds both proofs at once.

The office and the plant room: what the back of the college must hold

The office holds the records and the fees, and the leaf that guards it takes the period the room beside it takes. An office leaf takes FD60 where the office sits beside the workshops, because the fire that starts among the tools must not reach the records.

The plant room takes the same care, because the machinery and the boards sit behind its doors all day, so its leaf takes FD60.

Leaves that must stand open through the teaching day take a hold-open device proved to BS EN 1155, which lets the leaf go the moment the alarm sounds. A chair wedged under a leaf is not a hold-open device, because the leaf it holds open cannot shut when the fire reaches it.

When the alarm sounds: the routes a full college uses

Once the alarm sounds, everyone in the college takes the route the building gives them, so the way out must be clear of anything in the way. Every door on that route opens at one push, with the power on or off, so no student waits for a key.

The doors on the route need a smoke rating as well as a fire period, and BS EN 1634-3 gives it: Sa where the smoke is at room temperature, S200 where it is at 200 degrees. Smoke moves faster than flame, so it reaches the students on the route ahead of the fire, and a seal holds only where it meets the frame all round. The smoke control doors guide works through how the doors hold smoke back while people move past them.

A route is only as strong as the leaf on it with the shortest proof, so each leaf on the route takes the period the route needs. One leaf proved for less than its neighbours gives way first, and the route goes with it. The fire door regulations leisure centres guide takes the same care with the visitors in a leisure centre.

Position Door Period What to check
Classroom corridor Glazed leaf FD30 Leaf, glass, bar
Workshops Steel leaf FD60 Leaf, lock, seals
Stores Steel leaf FD60 Leaf, lock, seals
Office Steel leaf FD60 Leaf, lock, seals
Plant room Fire leaf FD60 Leaf, seals, gap
Public route Fire leaf FD30 Leaf, bar, closer

Closers, seals and gaps on college doors: what the period rests on

The closer on a college leaf works harder than the closer on most other doors, because students pass through it all day between lessons. Under BS EN 1154 the smallest closer power on a fire door is EN 3, and the check takes a moment: open the leaf and let it go, then watch it come home on its own. A closer that has lost its pull leaves the leaf standing open after the students have passed.

A 4 mm gap is left round the leaf, so it swings without catching and the seal meets the frame when the leaf shuts. The intumescent seal swells as the heat passes 200 degrees and closes that gap, unless paint over the seal holds it back. A seal that has slipped from its groove is written into the record against its own door on the day it is found, with the part and the date beside it.

The hinges carry the leaf through every opening of the day, and one that works loose lets the leaf drop until it drags and smoke slips through the gap above it. What the lock the key turns must do is set out in the fire door hardware guide, and the fire door closers guide covers sizes and fitting for closers.

Ordering for a college: one list, every door on it

The whole college order sits on one list, a line for every door with the leaf, the period, the lock and the closer beside it, so the door that arrives is the door each room asked for. A list that names a single leaf for the whole college leaves the fitter to guess which room takes which period, and a leaf fitted to the wrong room guards the wrong thing.

The college reads the quotation beside the schedule before anything is signed, line against line, because a door with no figure beside it still arrives with a charge, and a lock ordered on its own after the doorset was sent costs more than the same lock ordered with it. The how to specify security doors guide names the columns the list must hold, and the security door cost factors guide works through what each step up the scale adds to the price.

Each term the caretaker walks the college with the door list in hand, trying the leaves in turn from the entrance to the plant room. A leaf that drags, a seal out of its groove, or a closer that has lost its pull is written against its own door on the day it is found, and the repair is booked while the fault is still small. The record stays with the college file, and what the visit should cover is set out in the fire door inspection checklist.

On a college the period, the release and the closer decide together whether the classrooms, the workshops and the office hold, so all three sit on the same list before the order goes out.

What period should a college door carry?

FD30 or FD60, proved to EN 1634-1. The classroom corridor takes FD30 and the workshops take FD60, so the period follows the room the leaf guards, and the letters beside the minutes name what the doorset held back.

Can one leaf hold fire and forced entry?

Yes, where the fire test and the forced entry test were run on the same leaf, frame and seals, so a single report covers the pair.

Do college doors need panic hardware?

Yes, the leaf on the way out takes a panic bar proved to BS EN 1125, across at least 60 percent of the leaf, so one push throws the latch and the students behind it can get out.

What period should a workshop door carry?

A workshop leaf takes FD60, because the tools and the materials behind it carry the heaviest fire load in the college, and the stores beside the workshops take FD60 for the same reason.

Who checks the college doors?

The caretaker walks the round that covers every door, and each visit is written into the record the college keeps.

Specifying doors for a college?Send the door list and the period each door must hold for a tested door quotation.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.