ArxBridge
Fire Door Rules for Opticians
An opticians holds consulting rooms, records and frames behind its leaves, so each door takes the fire period the room behind it demands, FD30 or FD60.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
An opticians is a waiting area, a set of consulting rooms and a records room behind one entrance, and the fire rules for the building follow the rooms behind each leaf. The consulting rooms hold the sight tests, the records room holds the patient files, and the frames store holds the stock the shop sells.
Fire doors in an opticians are proved to EN 1634-1, and the period names how long the leaf holds fire back. A leaf proved to FD30 holds fire back for thirty minutes, a leaf proved to FD60 holds for sixty, and the letter beside the minutes says what was held: E for flames alone, EW for flames with some heat held back, and EI for flames with the heat held back as well.
An opticians follows the same rules as any other high street practice. The fire door regulations dental practices guide covers the fire rules for a dental practice, which holds patients in consulting rooms the same way an opticians does, and the fire door regulations offices guide covers the rooms of an office, which an opticians keeps behind its shop front.
- FD30 / FD60Fire periods to EN 1634-1
- Consulting roomsWhere the period rises
- Sa / S200Smoke ratings to BS EN 1634-3
- One listEvery opticians door named
Consulting rooms, records and frames: six rooms, six leaves
Six parts make up an opticians, and the period follows what each part holds. The waiting area holds the patients who wait for their appointment, the consulting rooms hold the sight tests, the records room holds the patient files, the frames store holds the stock, the back office holds the paperwork, and the plant room keeps the building running.
The consulting rooms take FD60, the records room takes FD60, the frames store takes FD60, the back office takes FD60, and the plant room takes FD60, because the people and the paper and the stock behind those leaves need the longest hold the building asks for. The leaves on the public route take FD30, because the route behind them is short and the people on it move fast.
The order is written from a list that names every opening, the leaf it takes and the period beside it, because a leaf with no line on the list may turn up in the wrong consulting room, and a leaf in the wrong room holds fire for the wrong length of time. The fire door regulations commercial buildings guide covers the parts the buildings share.
What FD30 and FD60 hold back in an opticians
The period on a door is a count of minutes, and EN 1634-1 is the test that counts them. A leaf proved to FD30 holds fire back for thirty minutes, a leaf proved to FD60 holds for sixty, and the leaf, the frame, the fixings and the lock are proved together as one doorset, with the report naming the period it holds.
Where an opticians leaf must hold fire as well as forced entry, the two proofs are taken on the same doorset and sit in one report. The minutes and the letters come from EN 1634-1, and the grade in B3, C5 and D10 comes from LPS 1175 Issue 8.2 of September 2024. How the pair is proved on one doorset is shown in the fire and security doors dual certification guide.
Drawings made before Issue 8 use the old names SR2, SR3 and SR4 for the same three forced entry categories, so the order writes the old name next to the new one, and the fitter who reads the drawing sees both. What breaks a rating once a door is fitted is named in the keeping an LPS 1175 rating valid guide.
Consulting room leaves: sight tests behind a shut leaf
Behind every consulting room leaf sits a patient who cannot get up and leave in the middle of a sight test, so the leaf takes FD60, because the patient behind it needs the minutes it takes to finish the test and leave in order, and the leaf must hold until the last person is out.
A consulting room leaf shuts on its own after every person through it, because a leaf left standing open holds nothing back. The closer is set so the leaf comes home without a slam, and the pull is checked by opening the leaf and seeing it shut on its own.
A consulting room leaf can carry a glazed panel so the corridor sees whether the room is in use, and the pane is proved with the leaf round it rather than alone. The test report names the glass, the bead and the fixings together, because a pane that falls from its beads holds nothing back. The fire rated glass cost guide sets out what the pane adds to the figure.
The records room and the frames store: paper and stock behind FD60
The records room holds the patient files, and its leaf takes FD60, because the files behind it cannot be replaced once the fire reaches them. The records room sits away from the waiting area, and its leaf stays shut whenever the last member of staff leaves the room, so the files sit behind a shut leaf through the working day.
The frames store holds the frames the shop sells, and its leaf takes FD60, because the stock behind it is the stock the shop runs on, and a fire that reaches the store takes the frames the patients came to choose. The frames store leaf takes the same key as the back office, so one key opens both doors for the staff who work there.
The records room and the frames store sit behind the same corridor, so their leaves take the same period, and the order names the period beside each door so the fitter does not swap them.
Waiting area leaves: the public route takes FD30
The waiting area is the room that fills first and empties last, so its leaves take FD30, because the people on the route move fast and the route behind them is short. The alarm sends patients who have never used the building towards the way out, so the route is signed at every turn and kept clear of chairs, tables and displays.
Where the route serves a crowd, the leaves on the way out take a bar proved to BS EN 1125, and the bar runs across at least 60 percent of the leaf width, so a person who reaches the leaf in a crowd can open it with one push. The panic hardware guide names what the bar must do, and the emergency exit doors guide covers the leaves on the way out in full.
Smoke gets to the people on the route before the flame does, so the route doors carry a smoke rating beside their period. The two ratings are named in BS EN 1634-3: Sa for smoke at room temperature and S200 for smoke at 200 degrees. The smoke control doors guide works through how the doors on a route keep the smoke back while the patients move past them.
The back office and the plant room: staff rooms behind FD60
The back office holds the paperwork and the keys, and its leaf takes FD60, because the paper behind it cannot be replaced once the fire reaches it. The back office leaf stands shut through the working day, and it must hold against the fire the records behind it invite.
Behind the plant room leaf sit the boards and the plant that keep the building running, so the leaf takes FD60 and is checked with the rest of the building on the round. The plant room fire doors guide covers the leaves of a plant room in full.
Where the back office leaf stands open through the working day, the device that holds it open must be proved to BS EN 1155, so it releases the leaf on its own when the alarm sounds. A leaf propped open with a chair or a wedge has no period at all while it stands open.
| Position | Leaf | Period | What to check |
|---|---|---|---|
| Consulting rooms | Steel leaf | FD60 | Leaf, lock, seals |
| Records room | Steel leaf | FD60 | Leaf, lock, seals |
| Frames store | Steel leaf | FD60 | Leaf, lock, seals |
| Back office | Steel leaf | FD60 | Leaf, lock, seals |
| Plant room | Steel leaf | FD60 | Leaf, lock, seals |
| Waiting area | Glazed leaf | FD30 | Leaf, glass, closer |
Hinges, closers and seals: the parts that keep the period
Once the leaf is hung a 4 mm gap runs round it, and the gauge on the monthly walk measures the gap against the last visit, because a gap that has grown points to a hinge or a frame that has shifted. The seal in the groove swells when the heat reaches 200 to 250 degrees and closes the gap, unless paint over the seal stops it swelling, so the seal is checked as well as the gap.
A fire door closer takes at least EN 3, the smallest power size the rules allow on a fire door, and the leaf must shut on its own from any angle it is opened to. BS EN 1935 grades the hinges that carry the leaf through every open and shut: grade 13 for 200,000 cycles at 120 kg, and grade 14 for 200,000 cycles at 160 kg. The fire door hardware guide sets out what the hardware must do, and the fire door closers guide covers the closers in full.
A leaf on the public route must open with a force below 30 N for the first 30 degrees and below 22.5 N beyond them, to BS 8300 and Approved Document M. Each fire door carries signs that say what the leaf is and which way it opens, and the fire door signage guide sets out what each sign must say. The gaps round the leaf are covered in the fire door gaps guide.
The opticians order: every leaf, its period and its proof
One list carries the whole opticians order, with a line for every opening that names the leaf, the period, the lock and the closer beside it. A list that names one leaf for the whole building leaves the fitter to guess which room takes which period.
The figures for the order are agreed leaf by leaf before anything is signed, because a closer ordered after the doorset arrives costs more than one ordered with it, and a leaf with no figure beside it still appears on the invoice. The how to specify security doors guide lists what the schedule must hold for every door.
The practice manager walks the building once a month with the door list in hand, and tries a few leaves on each walk, so every leaf is tried before the month is out. The entrance leaf is tried at opening, the consulting room leaves before the first patient, and the records room leaf at closing. The notes from each walk stay with the practice file, and the fire door inspection checklist names what the walk should cover.
An opticians fire door holds only as long as the consulting rooms behind it and the waiting area beside it, so the period, the smoke rating and the closer must all sit on the same list.
What period should an opticians fire door carry?
FD60 for the consulting rooms, the records room, the frames store, the back office and the plant room, and FD30 for the leaves on the public route, each proved to EN 1634-1.
Can one leaf hold fire and forced entry?
Yes, when a single doorset passed the fire test and the forced entry test together, so both proofs sit in the same report.
Do opticians fire doors need a smoke rating?
Yes, beside the period the route leaves carry Sa or S200 to BS EN 1634-3, because the smoke gets to the people on the route ahead of the flame.
Who checks the opticians fire doors?
The practice manager tries a few leaves on each monthly walk with the door list, so every leaf is tried in turn.
What happens when a fire door will not shut?
The fault is noted against its door on the day it is found, and the repair is booked while it is still small.
Get a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.