ArxBridge
Security Gates Cost Factors Explained
What sets a security gate quote: leaf and opening, rating, operator and duty cycle, access control, safety devices and ground works. Factors only, no prices.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
A security gate has no standard price. The quote turns on the opening, the leaf, the rating, the operator, the access control, the safety devices and the ground works needed to fit it. Two gates that look the same from the road can carry very different quotes, because the parts that set the price sit inside the leaf, the posts, the operator and the foundations. Compare quotes like for like: same opening, same leaf, same rating with test evidence, same operator and duty cycle, same access control and same fitting scope. A quote that leaves out the safety devices, the rated posts or the foundations is not cheaper. It is a different gate.
The factors below follow the order a quote is built in. Start with the opening and the leaf, then the rating, then the operator and how often the gate moves, then access control and safety, then the ground works. Our gate automation guide works through sliding and swing operators, safety to EN 12453 and duty cycle in full, and our road blockers guide covers the rising plate option for entrances with constant vehicle flow. Our anti-ram gates and barriers guide sets the gate beside bollards and blockers in one line of defence.
No figures appear on this page, because a figure without the opening, the leaf and the rating behind it would mislead. What follows is what each factor changes and what to ask for, so a quote can be read on its own terms and two quotes can be compared fairly.
- No standard priceThe quote follows the opening, leaf, rating and ground works
- EN 12453Safety in use of power operated doors
- ISO 22343-1:2023Current vehicle barrier test standard
- Duty cycleMatch the operator to how often the gate moves
The opening sets the baseline: width, leaf and ground
Every gate quote starts with the opening schedule: the width of each entrance, counted one by one. The leaf area grows with the span, and with it grow the posts, the operator and the foundations. A wide entrance needs a heavier leaf and stronger posts than a narrow one, and a tall leaf needs posts that hold it square for the whole life of the gate. The opening is the baseline every other factor adds to, so an entrance measured wrong produces a quote for a gate that does not fit.
The number of entrances matters as much as their size. A site with two vehicle entrances carries two leaves, two operators and two control points, while a site with one wide entrance carries one of each. The two jobs use different amounts of material and different amounts of fitting time, even when the total entrance width is similar. List every entrance separately, with its own width and ground conditions, rather than asking for a single figure for the site.
The ground decides the gate type before the leaf is chosen. A sliding leaf runs along the fence line and needs a run for the track or room for the overhang; a swing leaf opens in an arc and needs clear ground on one side. A tracked sliding gate needs a level, firm run with drainage, while a cantilever gate suits sloping or soft ground because the leaf hangs from rollers above the ground. Our sliding vehicle gates page sets out both types and the ground each one needs, and our security gates page covers the rated gate range.
Leaf size and material: steel, aluminium and the infill that fills it
The leaf is the moving part, and its size and material are the next step in the quote. Steel suits most sites and gives the highest resistance per section. Aluminium resists corrosion and suits coastal sites, at the cost of lower strength per section, so an aluminium leaf may need a deeper profile to match a steel one. The infill fills the leaf: solid infill gives privacy and a complete visual barrier, while mesh or bar infill lets light through and lets wind pass, which suits entrances where the leaf must be seen through or where wind load matters.
Leaf weight drives the rest of the gate. A heavy steel leaf asks more of the operator, the posts and the foundations than a light one, and a solid infill leaf acts as a sail in the wind, so a gate on an exposed site needs an operator sized for the leaf as built, with the infill the site chose. A gate on a sheltered yard and a gate on an exposed hilltop are not the same order, even when the entrance width is the same.
The finish is the next line in the quote. Powder coating gives the project colour and protects the steel in exposed positions. For coastal or chemical environments the specification steps up the coating system, and the site conditions decide the step. Whatever the material, the finish must sit on the tested construction without changing it: a coating or colour change that alters the leaf build needs fresh evidence.
The rating step: LPS 1175, PAS 68 and ISO 22343 on one gate
A rating is the largest single step in a gate quote after size. Gates on the rated security line are tested to LPS 1175, which runs from A1 to H20, with B3, C5 and D10 as the tool examples a specifier meets most often. Each step up needs a heavier leaf, stronger posts and stronger locking, and each needs its own test evidence. PAS 24 covers doorsets for dwellings, and Secured by Design is a scheme, not a rating, so a gate that names the scheme without naming the test has proved nothing.
The impact rating is a separate question with its own evidence. A gate that must stop a vehicle is tested under PAS 68, IWA 14-1 or ISO 22343-1:2023, which supersedes PAS 68:2013 and cancels and replaces IWA 14-1:2013. Test vehicles run from a 1,500 kg car to a 30,000 kg truck, and test speeds are 48, 64 and 80 km per hour. The rating states the vehicle type and mass, the impact speed, the impact angle and the penetration distance. Our ISO 22343 vehicle security barriers guide explains how to read the rating, and our vehicle impact ratings page sets out how the three standards sit together.
The rating belongs to the complete tested gate, not to the leaf alone. The posts and foundations are part of the tested gate, so a rated leaf in unrated posts is not a rated gate. Ask for the certificate naming the exact gate, its size and its configuration. A certificate for a different model does not cover the order, and a gate described as heavy duty without a certificate has no proven rating at all. A gate that must carry both a forced entry rating and an impact rating needs both sets of evidence on the same construction, and our anti-ram gates and barriers guide works through how the two sit together.
The operator and the duty cycle: how often the gate moves
The operator is the motor, the gearbox and the controls that drive the leaf, and it is sized to the leaf it moves, not to the entrance it guards. A heavy steel leaf, a wide leaf and a leaf that catches the wind all ask more of the operator than a light narrow one, and an operator sized below the leaf will strain, slow and wear out early. Ask the supplier to size the operator to the leaf as built, with the infill, the cladding and the wind load the site sees, and to put that sizing in writing with the order.
Duty cycle is the share of the day the operator is expected to work, and it is the figure that decides whether an operator lasts years or months. A gate on a quiet driveway moves a few times a day and rests between movements. A gate on a business park moves through the morning and evening peaks and rests in between. A gate on a logistics yard or a distribution depot moves all day, with vehicles arriving and leaving from the first shift to the last. An operator worked harder than its rating will run hot, slow and wear out early, and the gate will start to stop halfway through its travel.
Count how often the gate will move on the busiest day the site sees, not on an average day, and give that figure to the supplier before the operator is chosen. A gate that copes with the busiest day will cope with every other day too. Traffic that grows will outgrow an operator that was sized for the site as it was, not as it will be. A business park that adds tenants, a depot that adds a shift, or a school that adds a bus route will all ask the gate to move more often than it did on the day it was ordered. If the site expects growth, say so when the operator is specified. Our gate automation guide works through duty cycle and the operator types in full.
Every automated gate has a manual release so the leaf can be worked by hand when power fails. Agree the procedure with the security team in advance, so the entrance stays controlled during manual operation and the gate is put back into automatic use properly when power returns. A gate left in manual mode after a power cut is a gate that is not controlled at all.
Access control: readers, intercoms and the records they keep
Access control is the list of people and vehicles the gate must let through, and the way the gate checks each one. The common methods are fobs and cards for staff, keypads for visitors with a code, intercoms for deliveries, and readers that open the gate for a vehicle that is already known to the site. Each method suits a different entrance: a staff car park needs fobs that work in the rain, a delivery yard needs an intercom that reaches a person, and a site with regular contractors needs codes that can be changed when the work ends.
The gate should open for the right people and stay closed for everyone else, and the control system should keep a record of who opened it and when. A log that names the fob, the time and the direction of travel is the record the site needs when a vehicle is found where it should not be. Codes should be changed when staff leave, fobs should be cancelled when they are lost, and the list of people who can open the gate should be checked as often as the gate itself.
Access control and the safety system must work together, not against each other. A gate that closes on a timer can close on a vehicle that is still in the entrance, so the safety devices must hold the leaf open until the path is clear. People on foot should not have to cross the path of a moving vehicle leaf to reach the entrance, and a separate pedestrian gate or a marked route beside the vehicle gate is the usual answer. Our pedestrian speed gates page covers the fast lane for people on foot, and our turnstile, speed gate and portal guide compares the pedestrian side of entrance control.
Safety devices under EN 12453: part of the quote, not extras
EN 12453 covers safety in use of power operated doors, and EN 12445 covers the test methods for them. The two standards work together: one sets out what safe use looks like, and the other sets out how the door is tested to prove it. The safety design follows a risk assessment of the entrance: who walks past the leaf, where children and vehicles cross, and what happens when power fails.
The devices most often fitted are photocells that watch the path of the leaf and safety edges that stop the leaf when they touch an obstruction. Automated gates carry safety devices that stop or reverse the leaf if a person is in its path, and the devices must cover the whole travel of the leaf, not just the middle of it. A heavy leaf needs a safety brake that arrests the leaf if the drive fails, so it cannot free-fall. An emergency stop within reach and a manual override for power failure complete the set.
A quote that leaves out the safety devices is not a saving. The devices must be fitted, tested and recorded before the gate is used, so a gate ordered without them will need them added later, at greater cost and with the entrance out of use while the work is done. Test the devices after fitting and at every inspection, because a safety device that has failed silently is worse than no device at all.
Foundations, power and ground works: the work before the gate
The posts carry the leaf and the operator load together, so they need foundations that hold them square for the life of the gate. A post that leans will drag the leaf, strain the operator and wear the hinges, and the fault grows a little each year. The foundations need a survey of the ground and the services under it. Utilities, drains and cables run under most entrances, and a foundation dug without a survey will find them the hard way.
Where the gate must also stop a vehicle, the foundations are part of the rating, not an afterthought. The rating covers the installed system, leaf, posts and foundations together, and a gate that passed its test in one foundation detail does not carry the rating in a different one. Our PAS 68 bollard foundations guide sets out the deep and shallow choice for rated lines, and our guide to choosing HVM bollards works through the bollard side of the same line.
An automated gate needs a dedicated electrical supply, planned before the civil work begins. The exact requirement depends on the motor and the site access control, so the supply should be agreed with the gate design early, with ducting laid before the ground is finished. Plan the power, the ducting and the drainage at the same time as the gate, not after it. Our hostile vehicle mitigation page covers the wider entrance line the gate stands in.
Reading two gate quotes side by side: what to check before you order
Ordering a security gate is a specification exercise, not a shopping exercise. The order should name the leaf type and width, the operator type and its duty rating, the safety devices and the risk assessment they follow, the access control method, the manual release and the test evidence. Our how to specify security doors guide covers the same discipline for rated doors, and our HVM standards guide explains PAS 68, IWA 14-1 and ISO 22343-1:2023 for entrances that must also stop a vehicle.
Read two quotes side by side against the same list: same opening, same leaf and material, same rating with test evidence, same operator and duty cycle, same access control, same safety devices, same fitting scope with foundations, power and drainage, same evidence pack and same service routine. A quote that leaves out the safety devices, the rated posts, the foundations or the evidence is not cheaper. It is a different gate, and the missing parts will be bought later, when the entrance is already in use.
Finally, order the evidence with the gate. The test report, the risk assessment, the duty rating and the safety device schedule should arrive with the gate, and the handover pack should name the inspection routine the site will follow. A site that files the evidence on the day the gate arrives has a record it can use for the whole life of the entrance. For the impact side of the entrance, our road blockers guide covers the rising plate option where the flow never stops.
| Factor | What changes it | What to ask |
|---|---|---|
| Opening and leaf | Width, leaf size and material, infill, wind load | Opening schedule, leaf build, finish |
| Rating | LPS 1175 step, impact rating, dual rating | Certificate naming the exact gate |
| Operator and duty cycle | Leaf weight, movements on the busiest day, growth | Operator sizing in writing, manual release |
| Access control and safety | Readers, intercoms, safety devices, risk assessment | Device schedule, test records |
| Foundations and ground works | Ground, services, power, drainage | Survey, foundation detail, supply plan |
A cheaper quote that leaves out the safety devices, the rated posts or the foundations is not cheaper. It is a different gate.
Why is there no standard price for a security gate?
No two openings are alike. The opening, the leaf, the rating, the operator, the access control and the ground works all differ from site to site, so a figure without those behind it would mislead. A quote is built from the opening schedule and the rating, and the only fair comparison is between two quotes for the same opening, leaf and rating.
What is the biggest single factor in a gate quote?
The opening and the rating step, taken together. A wide entrance needs a heavier leaf, stronger posts and a bigger operator, and each step up in rating needs heavier construction and its own test evidence. After those two, the operator and duty cycle and the ground works are the next steps.
Does a crash rated gate cost more than an access control gate?
In general terms, yes, because they are different products. A crash rated gate carries a tested leaf, tested posts and tested foundations, with evidence for the impact rating. An access control gate only controls who may pass, with no impact evidence. The two should never be compared as if they were the same gate.
What does the duty cycle do to the quote?
It sizes the operator. A gate that moves a few times a day needs a lighter operator than one that moves through morning and evening peaks, and a gate on a logistics yard that moves all day needs the heaviest duty of all. State the movements on the busiest day and any growth the site expects, so the operator is chosen for the real duty.
What should a gate quote include?
The leaf, the posts, the operator, the safety devices, the access control, the foundations, the power and drainage, the test evidence and the service routine. Ask for each item by name before the order is placed, and compare two quotes against the same list.
Hidden costs a gate quote can carry
A gate quote that looks low often leaves out the work before the gate. The leaf is the part of the gate people see, and the posts, the foundations, the power, the drainage and the safety devices are the parts they do not. A quote that names only the leaf is not a quote for a gate. It is a quote for a moving panel, and the missing parts will be bought later, when the gate is already in use.
Ground works decide whether the gate stays where it was put. A sliding gate needs a level track on a foundation that does not settle, because a track that settles lets the gate drop and the lock miss its keep. A swing gate needs posts set deep enough that the weight of the leaf does not pull them out of line. The foundation design should name the depth, the width, the concrete and the ground it was designed for, and the ground should be surveyed before the order is placed.
The operator decides whether the gate keeps moving. The operator must be sized to the leaf as built, with the infill, the cladding and the wind load the site sees, because an operator sized below the leaf will strain, slow and wear out early. Our anti-ram gates and barriers guide works through sliding and swing gates in full, and our gate automation guide works through operators, duty cycle and safety devices.
Mistakes that leave a gate line open
The first mistake is ordering the leaf without the posts. The rating covers the installed system, not the leaf alone, so order leaf, posts, fixings and foundations as one system. A rated leaf on untested posts is not a rated gate, because the test never covered those posts in that ground.
The second mistake is leaving a gap beside the gate wider than 1,200 mm. ProtectUK guidance sets 1,200 mm as the maximum clear gap between barriers in a line and 500 mm as the minimum height, so close every gap to 1,200 mm or below. A gate that stops a vehicle and leaves a 2,000 mm gap beside it has left a route through for the next vehicle, and a crash rated gate beside an unrated fence is a line with a fence-shaped hole in it.
The third mistake is leaving the gate in manual mode after a power cut. A gate in manual mode is a gate that is not controlled at all, so put the gate back into automatic use when power returns. Safety in use of power operated gates is covered by EN 12453, and the safety devices need scheduled checks like any other part of the system. A gate must not close on a vehicle or a person, and the fail state should be tested at handover with the power off.
| Quote item | What to ask | Why it matters |
|---|---|---|
| Foundations | Foundation design, depth and width | A track that settles lets the gate drop |
| Operator and duty cycle | Operator rating, movements on the busiest day | An undersized operator wears out early |
| Safety devices | Devices under EN 12453, test record | A gate must not close on a vehicle or a person |
| Access control | Reader type, codes, record kept | A gate that admits everyone is not controlled |
| Test evidence | Test report for the leaf, posts and foundations | A rating string alone is not evidence |
Read two quotes side by side against the same list: same opening, same leaf and rating with test evidence, same posts and foundations, same operator and duty cycle, same safety devices and access control, same power and ground works, same evidence pack and same service routine. A quote that leaves out the foundations, the safety devices or the evidence is not cheaper. It is a different gate.
Get a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.