ArxBridge
Anti-Ram Bollards
Anti-ram bollards: rated fixed bollards for forecourts and perimeters, with the vehicle rating, spacing, foundations and one schedule for the whole line.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
An anti-ram bollard stands in the ground and stops a vehicle that tries to drive through it. It does not move, it does not open for a delivery, and it needs no power to do its job. What it needs is a rating proved in a live test, foundations that hold the impact, and spacing that leaves no gap a vehicle can use.
The order starts with the approach, not with the bollard. A forecourt with one lane asks for a different line from a perimeter where vehicles can approach from any side, and a site on a pavement over a basement asks for different foundations from a site on open ground.
The rating, the spacing, the foundations and the records all sit inside one schedule, and an order that names each one plainly gets the right bollards on the right line. The ratings in full are in our ISO 22343 vehicle security barriers guide, and the security bollards page covers the bollards themselves.
- ISO 22343-1Vehicle security barrier ratings
- 1,500 kg to 30,000 kgTest vehicles, car to truck
- 48, 64 or 80 km/hTest speeds for the vehicle
- 1,200 mm / 500 mmProtectUK gap cap and height floor
Where an anti-ram bollard stands: forecourts, perimeters and the approach
The forecourt is where most anti-ram bollards stand, in a line across the front of a building where vehicles must stop and people must pass. The line guards the entrance, the glazing and the people behind it, and it sits far enough from the building to stop a vehicle before it reaches the doors.
The perimeter takes the same bollard in a longer line, along the boundary where a vehicle could mount the kerb and cross open ground to the building. A line that runs only across the front leaves the sides open, so the survey should walk the whole boundary and mark every place a vehicle can reach the building without meeting a gate.
Stand-off sets how far the line sits from what it guards. A bollard line close to the building leaves the vehicle little room to slow, while a line set further out gives the building more distance from the impact, so the position belongs on the order beside the rating. The hostile vehicle mitigation page covers the line in full, and the public spaces sector page covers the places the line guards.
Reading the rating: ISO 22343-1, mass, speed and penetration
The rating on an anti-ram bollard comes from a vehicle driven at it in a test, and the result is written into one string. Vehicles from a 1,500 kg car to a 30,000 kg truck are driven at 48, 64 or 80 km/h, and the string records the vehicle class, the speed, the angle and how far the vehicle gets past the line, so a rating such as V/7500[N3]/80/90:0/0 can be written straight onto the schedule.
PAS 68:2013 no longer takes new tests, so ISO 22343-1:2023 is the name the order should carry. A schedule that still names the old standard names a test no test house runs now, and the ratings in full are set out on the vehicle impact ratings page.
A heavier vehicle at a higher speed asks for a stronger bollard and deeper foundations, so the step up the scale adds steel, depth and concrete to the line. A rating above the threat adds weight and ground works without adding safety, so the rating on the order should match the vehicle the approach could bring. Our choosing HVM bollards guide works through the options, and the crash rated fences and HVM fencing guide covers the line beside the bollards.
The approach decides the vehicle, and the vehicle decides the rating
The rating on the order starts with the approach, not with the bollard. A short run-up from a junction lets a vehicle reach only a low speed, while a long straight approach lets the same vehicle arrive far faster, so the survey should walk the approach and mark how far a vehicle can build speed before it reaches the line. The vehicle class follows the road the approach runs from: a lane that only cars can use asks for a different rating from a road that carries lorries, and the rating on the order should match the heaviest vehicle the approach could bring.
Under ISO 22343-1 a barrier is tested against vehicles from a 1,500 kg car to a 30,000 kg truck, driven at 48, 64 or 80 km/h, and the rating the test gives names the vehicle, the speed, the angle and the penetration, so a rating such as V/7500[N3]/80/90:0/0 can be written straight onto the schedule. A rating above the threat adds weight and ground works without adding safety, so the vehicle the approach could bring belongs on the order beside the rating. The ratings the order should name are listed on the vehicle impact ratings page, and PAS 68, IWA 14-1 and ISO 22343-1 are put side by side in the HVM standards guide.
| Approach | Vehicle it could bring | What the order names |
|---|---|---|
| Short run-up, junction | Car, 1,500 kg | Speed the run-up allows, rating |
| Long straight approach | Van or lorry | Speed, mass, penetration |
| Road carrying lorries | Truck, up to 30,000 kg | Vehicle class, speed, angle |
| Perimeter, any side | Vehicle from any side | Whole boundary walked, every gap |
The bollard quote line by line: rating, foundations and reinstatement
Take a bollard quote line by line: each line must name the position, the rating, the diameter and the height, the foundations and the fixings, the spacing beside it, and the bollard, the foundation and the fixings as one line. The foundation carries the rating as much as the bollard does, so the depth, the concrete and the fixings belong on the schedule beside the bollard, and the test report must name the foundation the bollard was proved in. A bollard set in a shallow foundation pulls out under the load it was meant to stop.
Reinstatement belongs on the quote with the foundations, because a patch that sinks leaves a dip in the pavement and a trip at the kerb. The material and the finish are named beside the foundation, so the pavement comes back to the same standard as the road it sits in, and the survey that finds the services under the line belongs on the order before the ground is broken. The options are weighed in the choosing HVM bollards guide, the bollards and the foundations they sit in are named in the PAS 68 bollards guide, the whole line is named on the hostile vehicle mitigation page, and the rules the line must meet are listed in the bollard regulations guide.
Fixed, shallow mount or removable: the bollard that fits the ground
A fixed bollard suits a line that never needs to open. It is set in concrete and stays there, so it guards a forecourt, a pavement or a perimeter where no vehicle ever needs through, and it asks for no power, no keys and no daily check beyond the inspection round.
A shallow mount bollard suits ground that cannot take a deep foundation, such as a pavement over a basement or a slab over services. It spreads the load across a wider base instead of going deep, so the foundation depth and the fixings belong on the schedule beside the bollard, because a shallow mount proved on one slab has no proof on another.
A removable bollard suits a line that must open now and then, for a delivery, a fire appliance or a crane. It lifts out of a socket in the ground and locks back in when the vehicle has passed, so the socket, the lock and the key all belong on the order with the bollard. The PAS 68 bollards guide covers the bollards and the foundations they sit in.
Spacing and the gaps: what ProtectUK says about the line
The gap beside a bollard and the height of the bollard both belong on the schedule, because ProtectUK guidance puts a 1,200 mm cap on the clear gap and a 500 mm floor under the height. Leave a wider gap and a vehicle slips past the line, and fit a lower bollard and a vehicle climbs it.
Spacing is measured between bollards, not between bollards and the wall. The gap at the end of the line, where the last bollard meets the wall, the fence or the gate post, is the gap most often missed, so the survey should measure every gap on the line, including the ones at the ends.
Pedestrians need a way through that does not open the line to a vehicle. A gap of 1,200 mm lets a person pass and stops a car, so the line can leave a pedestrian gap where people walk and keep the vehicle gaps closed where they do not. The bollard regulations guide sets out the rules the line must meet.
Foundations and fixings: the work under the pavement
The foundation carries the rating as much as the bollard does. A bollard set in a shallow foundation pulls out under the load it was meant to stop, so the depth, the concrete and the fixings belong on the schedule beside the bollard, and the test report must name the foundation the bollard was proved in.
The ground under the line often holds services, and the foundation must not cut through them. Water, gas, power and data each run under the pavement, and the survey that finds them belongs on the order before the ground is broken, because a foundation that strikes a service stops the job and the quote with it.
Reinstatement belongs on the order with the foundations, because a patch that sinks leaves a dip in the pavement and a trip at the kerb. The material and the finish are named beside the foundation, so the pavement comes back to the same standard as the road it sits in. The PAS 68 bollard foundations guide covers the foundations in full.
Bollards beside gates and barriers: closing the line
A gate line is only as strong as the gaps beside it, and fixed bollards fill the space between the gate post and the wall, between the gate and the fence, and along the pavement where a vehicle could mount the kerb. The bollards beside a gate must carry the same vehicle rating as the gate, because a rated gate beside an unrated gap leaves the line open.
Road blockers and rising bollards guard the lane itself, while fixed bollards guard the ground beside the lane, so the two work as one line. A vehicle that cannot pass the blocker will try the gap beside it, and the fixed bollards are what stop that move. Our road blockers guide covers the blockers that rise from the road, and the anti-ram gates and barriers guide works through the options for the gate line.
Planters and street furniture can fill a gap where a bollard would block the view, and they carry a vehicle rating of their own. A planter that is not rated is decoration, not protection, so the rating belongs on the order beside the planter. Our HVM planters and street furniture guide covers the rated options, and the gate automation guide covers how a powered gate on the line is driven.
The inspection round: what to check on a fixed bollard line
A fixed bollard asks for little, but it still asks for a check. The inspection round looks for a bollard that has been struck, a fixing that has worked loose, a foundation that has cracked, and paint or a sleeve that has come away and left the steel to the weather, and each fault goes on the record the day it is found.
The spacing should be measured again on the round, because a bollard that has been struck and pushed out of line leaves a wider gap than the one on the schedule. A gap that has grown past 1,200 mm lets a vehicle through beside the line, so the measurement belongs on the record beside the fault.
What each check looks for is set out in the fire door inspection checklist, and the same discipline runs through the bollard line: the record names the bollard, the fault, the repair and the date it was fixed, so the next team can see what was checked and what was done.
After the strike: what the inspection finds on a hit bollard
A bollard that has been struck can still stand upright and still be unfit for the line, because the damage sits in the foundation as often as in the steel. The inspection after a strike looks at the lean of the bollard, the cracks in the concrete round its base, the fixings that hold it and the paint and sleeve that keep the weather off the steel. A bollard that leans by only a little has still moved, and the gap beside it has grown with the lean, so the gaps are measured again on the same visit, including the gap where the last bollard meets the wall. Paint that has flaked off the steel shows where the blow landed, and rust that has started under the paint shows how long the damage has stood.
The record of the strike names the bollard, the damage found and the date, and it names the gaps measured beside it, because once the clear gap passes 1,200 mm a vehicle can slip past beside the bollard. A foundation that has cracked under the blow will not hold the next one, so the concrete is checked before the bollard is judged, and a bollard judged on its steel alone can be put back on a foundation that has already failed. The vehicle impact ratings page lists the ratings the line must carry, and the PAS 68 bollards guide sets out the bollards with the ground works under them.
| Damage | What it shows | What follows |
|---|---|---|
| Lean | The bollard has moved in its foundation | Gaps measured again on both sides |
| Cracked concrete | The foundation took the blow | Concrete checked before the bollard is judged |
| Loose fixings | The hold has weakened under impact | Fixings replaced where the hold has gone |
| Torn sleeve | Steel left open to the weather | Sleeve replaced and steel checked for rust |
Replace, do not repair: the parts a struck bollard gives up
A bollard that has bent under impact cannot be bent back and keep its rating, because the test report names the bollard as it was proved, not as it was straightened. The foundation it stood in was part of that proof too, so a new bollard set into a cracked foundation stands on ground the test never saw. A bollard that has been hit twice has given up more than a bollard hit once, because the second blow lands on a foundation the first blow already cracked. The replacement order names the depth, the concrete and the fixings beside the bollard, and the survey that maps the services under the line is done before the ground is broken. The foundations are covered in full in the PAS 68 bollard foundations guide.
Write the replacement as one line on the schedule, with the position and the rating beside the size, and the foundation and the fixings beside the bollard, so the bollard that arrives matches the bollard that was proved. The choosing HVM bollards guide weighs the options for the line, what each step up the scale adds is worked through in the bollard cost factors guide, and the road blockers guide names the blockers that rise from the road.
Ordering the whole line: one schedule, every bollard on it
Set the enquiry out as a specification, one line for every bollard on the site. Each line names the position, the rating, the diameter and the height, the foundations and the fixings, the spacing beside it, and the bollard, the foundation and the fixings as one line.
File the test report, the rating and the foundation specification with the bollards when they arrive, and write the inspection routine into the handover pack, so the record covers the whole life of the line. The keeping an LPS 1175 rating valid guide sets out what breaks a rating, and our security gates cost factors guide works through what each step up the line adds to the build. The how to specify security doors guide runs through the same discipline column by column, and our bollard cost factors guide works through what each step up the scale adds to the quote.
| Position | Bollard | Rating | What to check |
|---|---|---|---|
| Forecourt line | Fixed bollards | ISO 22343-1 | Spacing 1,200 mm, height 500 mm |
| Perimeter gaps | Fixed bollards | ISO 22343-1 | Foundations, fixings, ends of the line |
| Gate posts | Fixed bollards | ISO 22343-1 | Same rating as the gate |
| Shallow ground | Shallow mount bollards | ISO 22343-1 | Base, fixings, slab below |
| Occasional access | Removable bollards | ISO 22343-1 | Socket, lock, key |
An anti-ram bollard stops a vehicle by standing in its way, so the rating, the spacing and the foundations must all sit on the same schedule.
What vehicle rating do anti-ram bollards need?
The vehicle the approach could bring sets it. Under ISO 22343-1 a barrier is tested against a 1,500 kg car up to a 30,000 kg truck, driven at 48, 64 or 80 km/h, and the rating the test gives names the vehicle, the speed and the penetration.
How wide can the gap beside an anti-ram bollard be?
The cap is 1,200 mm on the clear gap, with a 500 mm floor under the height, under ProtectUK guidance. A gap wider than the cap lets a vehicle past the line, so the inspection round measures every gap, including the ones at the ends.
Do anti-ram bollards need foundations?
Yes. A bollard set in a shallow foundation pulls out under the load it was meant to stop, and the depth follows the rating, so the foundation belongs on the order beside the bollard.
Can a fixed bollard line leave a gap for pedestrians?
Yes, where the gap is kept to 1,200 mm. That width lets a person pass and stops a car, so the pedestrian gap is measured on the inspection round like every other gap on the line.
Who checks anti-ram bollards?
The team that runs the site, on the routine the security plan sets. Each record names the bollard, the fault, the repair and the date.
If this is one of several openings on the site, the enquiry checklist shows the rating, hardware and evidence to name for each.
Get a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.