Public-Sector Tender Response Checklist for Security Door and HVM Supply

A supplier checklist for public-sector tenders: find the notice on Find a Tender, build the evidence pack, answer with named ratings, and keep the file.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

A public-sector tender is won on evidence, not on promises. This checklist shows what a supplier should prepare before responding to a tender for security doors and hostile vehicle mitigation, from finding the notice to keeping the file after submission.

  • Find a TenderThe central platform for new notices
  • 2026 thresholdsPPN 023, from 1 January 2026
  • Below-threshold floors£12,000 central, £30,000 other bodies
  • Evidence packCertificates, listings and test proof

Find the opportunity in the right place

Find a Tender is the platform where public procurement notices are published, and notices under the Procurement Act 2023 must appear there for procurements that start on or after 24 February 2025. That is where a supplier should look first. A buyer may also repost a notice on its own portal, but Find a Tender is the one place every new notice should appear.

Contracts Finder still exists, but its role has changed. Part 6 of the Procurement Act 2023 replaced the old requirement to publish below-threshold opportunities on Contracts Finder, and those opportunities are now published on the central digital platform instead. Contracts Finder covers only procurements that started under the Public Contracts Regulations 2015. A supplier who looks only on Contracts Finder will miss the new notices.

Set up free alerts on Find a Tender for the sector and the region, and check them on a fixed day each week. The housing tender guide shows the buyer side of the same process, so a supplier can see what the buyer is trying to achieve before responding.

Read the whole notice before you write anything

Read the notice in full before drafting a single paragraph. The notice states the subject matter, the estimated value, the submission process and the criteria that will be used to determine the winning bid. Those four items shape the whole response, and a bid that answers a different question will not score, however well written it is.

Note the deadline, the format the buyer wants, and what the buyer asks to be attached. A notice that asks for a certificate wants the certificate, not a brochure that mentions it. A notice that asks for a named rating wants the rating as written on the certificate, not a near match.

Check whether the notice names a framework or a dynamic purchasing system. If it does, the route in is through that framework, and the response must follow the framework rules. The fire door remediation guide shows how a housing provider frames a programme, which helps a supplier read the notice the way the buyer wrote it.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Work out which rules the contract sits under

The value of the contract decides which rules apply. The thresholds below come from PPN 023, issued in November 2025, and they apply to procurements that commence on or after 1 January 2026. Thresholds are revised every two years to take account of currency fluctuations, so always check the current note rather than relying on last year’s figures.

Below the thresholds, a lighter regime applies. Contracts worth £12,000 or more from a central government body, or £30,000 or more from another public body, must still be published on the central digital platform. A procurement is commenced where a tender notice, a transparency notice or a below-threshold tender notice has been published, or where the authority has invited tenders.

Contract type Threshold From What it means
Central government goods and services £135,018 1 January 2026 Full regime above this value
Sub-central goods and services £207,720 1 January 2026 The full regime starts here
Works contracts £5,193,000 1 January 2026 The full regime starts at this figure
Light touch contracts £663,540 1 January 2026 Light touch contracts sit under the full regime
Below-threshold floors £12,000 / £30,000 24 February 2025 Notice on the platform still required

The PPN 023 threshold note sets out the figures in full, and the Operational Requirement guide shows how a buyer states what a site needs, which is the document the specification grows from.

Build the evidence pack

A buyer asks for evidence, and the bid should attach it rather than describe it. The pack for a security door or a barrier should hold the certificate for each product, the live listing behind it, and the test evidence the rating rests on. A claim without the document behind it scores nothing.

For an LPS 1175 door, attach the certificate and the Red Book Live listing, and check both before you attach them. The LPS 1175 certificate guide shows the five checks to run on the certificate, and the rating maintenance guide sets out what can break the rating after the certificate is issued.

For a Secured by Design product, attach the company page and the product entry from the SBD website. The Secured by Design listing guide shows how to find both. For a barrier, the NPSA Catalogue of Security Equipment lists products the NPSA has assessed against its own security standards, with the performance rating each one achieved, including doors, portals, turnstiles and locking hardware, and hostile vehicle mitigation rated for impact and for delay.

Answer the specification with named ratings

Answer the specification in its own terms. If it asks for LPS 1175 SR3, name C5 and attach the certificate that carries it. If it asks for an ISO 22343 rating, name the full rating code and the test report behind it. A bid that answers with a different standard, or with a rating that is close but not the one asked for, invites the buyer to mark it down.

Do not claim more than the evidence supports. A rating proves one product in one configuration on one test, and the due diligence guide for barriers shows the questions a buyer should ask about what a rating does and does not prove. The ISO 22343 guide takes a rating code apart field by field, so a supplier can read the code the buyer asks for and answer it exactly.

Where the specification asks for a product the supplier does not hold, say so and offer the product that does meet it, or say nothing. A bid that names a product it cannot supply will fail at delivery, and the failure will sit on the record. The forced entry, ballistic and blast guide spells out how the three rating families differ, so the answer names the right family.

Price the bid so the numbers can be checked

Price every item the notice asks for, in the format it asks for, and show the basis for each figure. A buyer compares bids line by line, and a lump sum with no breakdown cannot be compared. If the notice asks for a price per door, give a price per door. If it asks for a price per barrier, give a price per barrier.

State what is included and what is not. Delivery, fitting, commissioning and any options should be shown separately where the notice asks for them, so the buyer can see what the price covers. A price that hides an extra charge will be found at evaluation, and the bid will lose trust it cannot win back.

Check the arithmetic before you submit. A bid with a wrong total, or with figures that do not add up, tells the buyer the supplier does not check its own work. The NPSA forced entry and blast guidance sets out the standards a government site works to, which helps a supplier price the work the site actually needs.

A bid that attaches the evidence scores. A bid that describes the evidence asks the buyer to take it on trust.

Submit, then keep the file

Submit through the route the notice names, and leave time for the portal to accept the file. A bid sent to the wrong address, or after the deadline, is not read. Keep the submission receipt and the exact files as submitted, with the date and time.

After submission, keep the file for the life of the contract and beyond it. The file should hold the notice, the response, the evidence pack, the prices as submitted, and any messages exchanged with the buyer. If the buyer asks a question after submission, answer it from the file, not from memory.

Suppliers should also register on the central digital platform and hold a unique identifier, since authorities must obtain confirmation of registration and submission of core supplier information from suppliers who wish to take part. For notifiable below-threshold contracts, the supplier must be registered, must have submitted the specified information, and must have given the authority its unique identifier. The gov.uk guidance on publication under the Procurement Act sets out how the platform and the notices work together.

Where do I find public-sector tenders for security doors?

On Find a Tender, the platform for public procurement notices. Set up free alerts for the sector and the region, and look at them on a fixed day each week.

What is the difference between Find a Tender and Contracts Finder?

Find a Tender carries notices for procurements that started on or after 24 February 2025. Contracts Finder holds only procurements that started under the 2015 regulations.

What evidence does a buyer usually ask for?

Each product needs its certificate, its live listing, and the test evidence behind the rating. Attach the documents rather than describing them.

Do I need to register anywhere before I bid?

Register on the central digital platform and keep your unique identifier. Authorities must obtain confirmation of registration and core supplier information before you take part.

What happens after I submit?

Keep the file: the notice, the response, the evidence pack and the prices as submitted, with any messages exchanged. Answer later questions from the file.

Responding to a tender for security doors or barriers?Send the notice and the ratings named in it.
Contact us for a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.