PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained

PAS 68 vs IWA 14 vs ISO 22343 for UK specifiers: how HVM ratings are written, the test vehicles and speeds used, and what belongs in your specification.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

ISO 22343-1:2023 is the current test standard for hostile vehicle mitigation. It supersedes PAS 68 and IWA 14-1, whose test evidence remains valid for products already certified. Every rating states four things: the test vehicle and its mass, the impact speed, the impact angle and the penetration distance.

  • Current standardISO 22343-1:2023, superseding PAS 68 and IWA 14-1
  • A rating statesVehicle and mass, speed, angle and penetration
  • Test vehiclesFrom a 1,500kg car to a 30,000kg truck
  • Test speeds48, 64 and 80 km/h

Where the three standards came from

PAS 68 is a BSI Publicly Available Specification. It became the UK benchmark for testing vehicle security barriers, covering bollards, blockers, gates and fences against real vehicle impacts on a test track.

IWA 14-1:2013 is an International Workshop Agreement. It was developed to harmonise PAS 68 with the American approach to vehicle barrier testing, drawing test vehicles from both traditions so a single document could serve international projects. A companion part covers selection and installation.

ISO 22343-1:2023 is the international standard that now supersedes both documents. Part 1 sets the performance requirement and the vehicle impact test method. For new testing, and for specifications written today, this is the designation to cite. Our vehicle impact ratings guide sets out each designation in full.

A common language was the point of all three documents. Before them, one supplier’s heavy duty barrier meant something different from another’s, and a specifier had no way to compare the two. A shared rating lets the consultant, the insurer and the approving authority read the same four figures and know exactly what was proven on the test track.

How a vehicle impact rating is written

A rating is a compact record of one full-scale crash test. It always communicates the same four facts: the vehicle type and its mass, the speed at impact, the angle of impact and the penetration measured afterwards.

Read the string left to right. The first section identifies the vehicle by mass and class, for example 7500 for a 7,500kg truck. Then comes the impact speed in km/h, then the impact angle in degrees, then the penetration in metres after the colon.

Penetration is the distance the vehicle travels beyond the barrier line during the test. A smaller figure means the barrier stopped the vehicle sooner. Zero penetration means the vehicle did not get past the line at all, which is the result most high-security perimeters are designed around.

The angle deserves attention. A head-on impact at 90 degrees drives the full energy into the barrier, while an oblique impact can deflect the vehicle along the line. The rating states the tested angle so the design can be matched to the real approach geometry of the site.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

The test vehicles and speeds behind the ratings

The test vehicle is chosen to match the threat the site faces. A pavement protection scheme in a city centre may be tested against a car, while a power station or government site is tested against a heavy goods vehicle.

Test vehicle Typical mass Test speeds
Car 1,500kg 48, 64, 80 km/h
4×4 2,500kg 48, 64, 80 km/h
Van 3,500kg 48, 64, 80 km/h
Rigid truck 7,200 or 7,500kg 48, 64, 80 km/h
Heavy truck 30,000kg 48, 64, 80 km/h

The three speeds, 48, 64 and 80 km/h, cover realistic approach speeds for different settings. Impact energy rises steeply with speed, so the speed figure in a rating matters as much as the vehicle mass. A barrier rated against a truck at 48 km/h has not demonstrated anything about the same truck at 80 km/h.

PAS 68 and IWA 14-1: the two key differences

The two older standards look alike but measure differently. The first difference is the penetration datum. PAS 68 measures penetration from the rear face of the barrier. IWA 14-1 measures from the front face. The same physical test can therefore produce two different penetration figures, one under each standard.

The second difference is debris. PAS 68 records debris dispersion from the impact. IWA 14-1 does not record it. Test vehicle masses also differ slightly between the two, for instance 7,200kg against 7,500kg for the heavy rigid truck.

Do not swap ratings between standards. A PAS 68 figure and an IWA 14-1 figure are not interchangeable. Compare vehicle, speed, angle and penetration individually, and check which datum each test used.

Which standard is current

ISO 22343-1:2023 is the current standard. It supersedes PAS 68 and IWA 14-1, and new product testing should be carried out to it.

Standard Origin Status today
PAS 68 BSI Publicly Available Specification Superseded; existing test evidence remains valid
IWA 14-1:2013 International Workshop Agreement Superseded; existing test evidence remains valid
ISO 22343-1:2023 International standard Current; cite for new testing and specifications

Earlier test evidence does not expire with the new standard. A bollard or gate tested to PAS 68 or IWA 14-1 keeps its evidence for the configuration tested. If a tender still names PAS 68, ask whether ISO 22343-1 evidence is acceptable before excluding a product on paperwork alone.

During the transition, keep clear records. Note the date and the standard on every test report you file, so a future audit can see what was current when the product was specified. That record is what defends the specification if questions arise later.

Part 2 of the standard: selection, installation and use

ISO 22343-1 proves the barrier, and Part 2 of the same standard sets out how to choose it, fit it and look after it. The test in Part 1 says what the barrier stopped; Part 2 says which barrier the site needs, how the foundation must be built, and what the checks after installation must cover. A specification that names Part 1 and leaves out Part 2 has ordered a tested barrier with no instruction for fitting it.

Selection starts with the approach, not the catalogue. The vehicle the site faces, the speed it can reach on the run-up, the angle it can strike at, and the distance the barrier may move on impact all shape the rating to specify. A barrier chosen for a straight approach proves nothing about a site where the approach bends, and a rating read without the approach behind it is a rating read halfway.

Installation follows the test. The foundation the test used is the foundation the site must build, the fixings the test used are the fixings the fitter must use, and the ground the test assumed is the ground the site must have. A barrier fitted to a different foundation, with different fixings, on different ground, is a barrier the test never proved.

The site survey the rating cannot replace

No rating replaces the survey of the site itself. The survey walks the line the barrier must guard, notes where the ground falls away, where the services run, where the pedestrians cross, and where the vehicles can build speed. A line drawn on a plan without the survey behind it may place a barrier where the ground cannot hold it, or leave a gap where the ground dips.

The survey also reads the threat the site faces. A site beside a fast road faces vehicles at speed, a site in a town centre faces vehicles at walking pace, and the rating follows the speed the road allows, not the speed the catalogue assumes. The run-up matters as much as the road: a long straight run-up lets a vehicle reach speed, while a bend or a junction keeps it slow.

Keep the survey with the specification and the test report, so the next specifier can see what the rating rests on. A barrier ordered from the catalogue without the survey is a barrier ordered for a site no one has walked.

Step What it names What to check When
Approach Run-up, bends, junctions Speed a vehicle can reach Before the order
Vehicle Mass and speed the site faces Rating matches the threat Before the order
Foundation Depth, size, ground in the test Site ground matches the test Before the order
Installation Fixings and ground as tested Fitted as the test proved it On the build
Survey Ground, services, crossings Line walked, gaps found Before the order

The rating in full is read field by field in the ISO 22343 vehicle security barriers explained guide, and the old rating and what it asks of the whole line is covered in the PAS 68 bollards guide. The line as one system is covered in the choosing HVM bollards guide, and the foundations a line takes are set out in the PAS 68 bollard foundations guide.

What to put in your specification

Name the standard and the full rating, never the standard alone. “Tested to ISO 22343-1” says nothing about the threat. The rating string carries the vehicle, the speed, the angle and the penetration, and that is what the design stands on.

Add the installation conditions from the test: the foundation type and depth, and the ground interface the barrier was tested in. A rating earned in a deep reinforced foundation does not automatically transfer to a shallow retrofit or a different soil.

Ask for the test report and check the rating covers the product exactly as supplied, including sleeves, finishes and fixings. Start with the hostile vehicle mitigation overview, then look at security bollards, security gates and HVM street furniture for the hardware. Schemes in busy public areas should also read the public spaces sector notes. For product selection, see how to choose HVM bollards, and for a related combined-rating topic, fire and security doors dual certification. You can browse every guide from the guides hub.

One more check before you sign off. If the barrier design changes after the test, through a new sleeve, a different fixing or a revised foundation, ask whether the change sits inside the tested scope. A rating belongs to the tested configuration, and anything outside it needs fresh evidence or a formal assessment from the test house.

Frequently asked questions

Is a PAS 68 certificate still valid?

Yes. ISO 22343-1:2023 supersedes PAS 68 for new testing, but test evidence already earned to PAS 68 remains valid for the configuration that was tested. There is no need to retest a product that already carries sound evidence.

Can I compare a PAS 68 rating with an IWA 14-1 rating?

Not directly. The two standards use different penetration datums, and only PAS 68 records debris dispersion, so the figures are not interchangeable.

What does the penetration figure tell me?

It is the distance the test vehicle travelled past the barrier line. A lower figure means the barrier stopped the vehicle sooner.

What angle is the test run at?

The rating states the angle used. Ninety degrees is the direct head-on impact, which is the most severe case for most barriers.

What should a specification ask the supplier for?

The standard, the full rating string, the foundation and ground conditions from the test, and a copy of the test report covering the product as supplied. With those four items, anyone checking the design can verify the barrier matches the proven test.

Specifying HVM for a live project?Send the threat vehicle and the site constraints, and we will return a rated proposal within one working day.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.