ArxBridge
Blast resistant windows: what drives the cost and how to specify them
Blast resistant windows: the eight cost drivers on UK projects, how to specify the ISO 16933 class and hazard rating, and why frame and anchorage matter.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
The cost of blast resistant windows is driven by eight factors: the ISO 16933 class, the hazard rating target, the size and number of openings, the glazing build-up, the frame, the anchorage, and site access. This guide explains each driver and how to specify the window so quotes can be compared fairly.
- StandardISO 16933 rates blast glazing; EN 13123/13124 rate full assemblies
- ClassesEXV45 to EXV10 for vehicle bombs; SB for satchel charges
- HazardA (no break) to F (high hazard) for the glazing
- RuleThe frame and anchorage matter as much as the glass
The eight things that drive the cost
Two quotes headed “blast resistant windows” can describe completely different products. The only way to compare them is to compare the specification behind the headline, driver by driver.
| Driver | What it changes |
|---|---|
| ISO 16933 class | Higher classes need stronger glazing, frames and fixings |
| Hazard rating target | Aiming for A (no break) demands more than a lower rating |
| Size of each opening | Larger panes collect more blast load |
| Number of openings | Each unit repeats manufacture and installation |
| Glazing build-up | More layers for higher classes and better hazard ratings |
| Frame | Deeper, stronger sections to hold the pane under load |
| Anchorage | Fixings that carry the load into the building structure |
| Site access | Restricted sites, height and occupied buildings add time |
The table also explains why early budgets go wrong. A budget set before the class is known is a guess, and a budget set before the opening schedule is measured is a second guess. Fix the class, the hazard rating, and the schedule first; the budget then has something to stand on.
Class and hazard rating: what you are actually buying
ISO 16933 EXV classes describe vehicle bombs: 100kg of TNT at a stand-off distance. EXV45 means 45 metres; EXV10 means 10 metres, and it is the most severe of the series. The shorter the distance, the harder the window must work.
SB classes cover a different threat: hand-carried satchel charges close to the glazing. A specification that names only an EXV class says nothing about this threat, so check whether your assessment includes it.
The hazard rating runs from A to F and describes what happens to the glazing: A means no break, F means high hazard from fragments. Moving the target from F toward A changes the design as surely as moving the EXV class, so state both in the specification. Our blast ratings guide sets out the full ISO 16933 tables.
Size, number of openings and glazing build-up
Blast load grows with the area of the pane. A large window collects far more force than a small one at the same class, so big openings need deeper frames and stronger fixings, or they need to be divided into smaller units.
The number of openings multiplies everything: each unit is manufactured, delivered, and installed separately. Ten windows at a modest class can outweigh two windows at a high class in the final account.
The glazing build-up is tuned to the class and the hazard target: laminated layers that absorb the pressure and hold the fragments. Higher classes and better hazard ratings add layers, weight, and thickness, which feed back into the frame design. Blast resistant glass is only one part of this equation.
Dividing large openings is a legitimate design move. Two smaller panes at the same class need less frame depth each than one large pane, and the mullion between them becomes part of the engineered system. It changes the architecture, so raise it early with the design team.
Frame and anchorage: the other half of the system
The pane can only perform if the frame holds it. Under blast load the frame takes the full force from the glass and passes it into the building, which makes the frame a structural component rather than a trim.
Anchorage is where retrofits succeed or fail. Chemical anchors, bolted connections, or cast-in fixings must carry the design load into sound structure; a strong window bolted to weak masonry is a weak installation. Allow for a structural check of the reveals before the design is fixed.
This is why the glass is rarely the whole story. On many projects the frame engineering and the anchorage design move the total as much as the glazing itself.
The frame is structural. Under blast load the frame carries the full force of the pane into the building. A pane can only ever be as good as the frame and anchorage behind it.
Site access and installation realities
Installation is the driver most often forgotten at specification stage. Restricted city centre sites, limited delivery windows, and working at height all add time, and time on site is never free.
Occupied buildings add another layer: out-of-hours working, dust control, and phased handovers around the client’s operations. Large, heavy units may need cranes or mechanical handling, which needs planning with the site team, not just the supplier.
Describe the site honestly in the enquiry: access routes, floor levels, working hours, and whether the building stays occupied. The installer can then price the real job instead of guessing it. Public spaces projects often face the tightest access constraints.
Programme matters too. Blast windows are made to order, and the frame engineering runs in parallel with the structural checks. Late changes to opening sizes restart both, so freeze the schedule before manufacture begins.
Who sets the threat, and how to write the specification
The threat is set by the client’s security adviser or by a formal threat assessment: charge size, stand-off distance, and whether satchel charges are credible. The window supplier should never be the one guessing these numbers.
The specifier translates the threat into an ISO 16933 class and a hazard rating, then lists every opening with its size. A security consultancy engagement produces the threat side of the document; the opening schedule produces the rest.
Send both with the enquiry. A supplier working from a stated class, a stated hazard rating, and a measured schedule can design the system and quote it fairly. Anything less invites guesswork, and guesswork is where the expensive surprises live. Compare notes with our ballistic rating guide and our glass ratings guide, and browse the guides hub for the wider library.
The frame and the anchorage: the half of the window that holds the rating
A blast resistant window is priced as a system, not as a pane. The class, the size, the number of openings, the glazing build-up and the frame set the starting point, and every part after them adds its own line to the quote.
ISO 16933 gives a blast window two marks: EXV for the charge weight it must resist at a set distance, and SB for the hazard the glazing leaves behind, graded from A to F. A second pair of standards, EN 13123 and EN 13124, gives ratings marked EPR and EXR, and the order names the standard with the class, so no one reads a class from one standard as a class from the other.
Each step up the class adds layers and thickness to the glazing, and a larger opening needs a pane that is thicker still. The build-up grows with the class and the size together, so the order names the class, the size and the number of openings on the same line.
The frame and the anchorage carry the rating as much as the pane does, because the blast pushes on the whole window, not on the glass alone. A pane proved to the class, set in a frame that was never tested with it, has no rating, and the fixings that tie the frame to the wall belong on the same line as the pane. The scales sit side by side on the blast ratings page.
The window arrives as a heavy unit, and the site access, the lifting and the installation all add lines to the quote. A window that must be lifted to an upper floor needs a crane and a route for it, and the installation is proved on the assembly as fitted, not on the pane alone. How glass and frame are proved together is set out in our blast doors glazed versus solid guide.
One window, one proof: the schedule that names the whole assembly
The threat is set by the person who owns the risk, not by the window maker, and the specification follows from the threat: the charge weight, the distance and the people behind the window. A class above the threat adds layers, weight and cost without adding safety, and a class below it leaves the room unproved.
A window that must resist a blast and a bullet needs a proof for each job, because the two tests prove different things. The ballistic class runs FB1 to FB7 under EN 1522 and EN 1523 for the finished assembly, with the glass alone at BR1 to BR7 under EN 1063, and the blast class runs beside it on the same line, with a test report behind each. Our bullet-resistant versus bulletproof glass guide clears up the names.
What the glass throws off matters as much as what it stops. S means splinters reach the safe side, and NS means none do, so a window that guards people standing behind it needs NS beside the class, while a window that guards stock alone may not. The mark belongs on the schedule beside the class, because a window ordered without it may stop the round and still fail the room.
Ask for the test report on the whole window before the order is placed, with the class, the size, the frame and the anchorage named on the same line, so the next reader can see what was proved and what holds it. How the assembly is proved is explained on the fire rated windows guide.
| What sets the cost | Why it adds | What the order names |
|---|---|---|
| Class and hazard | More layers, thicker pane | EXV/SB or EPR/EXR |
| Size and openings | More glass, more frame | Size, count |
| Frame and anchorage | Tested frame, fixings | Frame, fixings, wall |
| Added proofs | A test for each job | Each class on its own line |
Keep the threat assessment with the order, so whoever reads the file next can see the charge weight, the distance and the people the class was chosen for.
Frequently asked questions
Why do two quotes for blast windows differ so much?
They are probably quoting different classes, different hazard ratings, or different scopes. Ask each supplier to confirm the ISO 16933 class, the hazard rating, and the opening schedule their price covers, then compare those lines.
Is the glass the most expensive part?
Not always. The frame engineering, the anchorage design, and the installation often move the total as much as the glazing, especially on retrofits and restricted sites.
Can our existing frames be reused?
Only if the frame and its fixings form part of a tested system for the required class. In practice this is rare, and most blast specifications need new frames designed for the load.
What does hazard rating A mean?
No break: the glazing stays in the frame without shedding hazardous fragments. It is the highest performance on the A to F scale and demands the most from the system.
Who decides between EXV25 and EXV10?
The threat assessment does, based on charge size and stand-off distance. The supplier designs to the stated class; it should not be choosing it.
Can one window carry both a blast and a ballistic rating?
It can, where both threats are credible, but each rating needs its own test evidence for the complete assembly. State both classes in the specification and check the reports cover each.
Get a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.