Certified physical security

ArxBridge
Installer checking the seal of navy steel fire-rated doors in a UK office corridor

ArxBridge

Fire Door Rules for Oncology Units

Patients in an oncology unit move slowly and some are unwell, so each door takes the fire period its room demands, FD30 on the route out and FD60 behind it.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Patients in an oncology unit move slowly and some are very unwell, so each door takes the fire period its room demands. The entrance, the reception, the waiting area, the treatment rooms and the ward entrance take FD30, and the drug store, the staff office and the plant room take FD60, because the rooms behind the front hold the medicines, the records and the services, and those rooms ask for a longer hold than the route out.

EN 1634-1 gives the minutes after FD, and the standard runs from 30 to 120. The letter says what the leaf held back, E for flame on its own, EW for flame with some of the heat and EI for flame with the heat as well, so the number counts the minutes and the letter names what stayed back.

An oncology unit follows the same fire rules as any other building where people move slowly and some have never used the building, and the period on each leaf follows what sits behind it and how fast the people behind it can move. The fire door regulations hospitals guide covers the fire rules for the wider hospital round the unit, and the fire door regulations hospices guide covers the rooms of a building where bedrooms stand beside a drug store, while an oncology unit sets its leaves by the treatment rooms and the ward beside them.

  • FD30 / FD60Fire periods to EN 1634-1
  • Ward entranceWhere FD30 holds the ward clear
  • Sa / S200Smoke ratings to BS EN 1634-3
  • One listEvery unit door named

Eight rooms in an oncology unit: the period each leaf takes

Eight rooms make up an oncology unit, and the period follows what each room holds. Patients come in through the entrance, wait in the waiting area, sit for treatment in the treatment rooms, stay on the ward behind the ward entrance, and the drug store holds the medicines, the staff office holds the records and the plant room keeps the services running.

FD60 sits on the drug store, the staff office and the plant room, because the medicines, the records and the services behind those leaves need sixty minutes before flame reaches them. FD30 sits on the entrance, the reception, the waiting area, the treatment rooms and the ward entrance, because the people on that route reach the street in far less than thirty minutes.

Every opening carries its own line on the order, naming the leaf and the period, so no leaf is hung on guesswork. The table sets out the eight rooms with the period each one takes and the grade beside the period, so the fitter can match each leaf to its line as it is hung.

Room Period Grade What to check
Entrance FD30 B3 Leaf, glass, closer
Reception FD30 B3 Leaf, glass, closer
Waiting area FD30 B3 Leaf, glass, closer
Treatment rooms FD30 B3 Leaf, glass, closer
Ward entrance FD30 B3 Leaf, lock, closer
Drug store FD60 D10 Leaf, lock, seals
Staff office FD60 C5 Leaf, lock, seals
Plant room FD60 C5 Leaf, lock, seals

What FD30 and FD60 hold back in an oncology unit

The period counts the minutes the doorset earned in its test, and the doorset means the leaf, frame, fixings and lock proved as one. The order writes the period beside the leaf, and the fire door certification guide names what the report behind a period must hold.

One doorset in the unit can carry the fire proof and the forced entry proof in a single report. EN 1634-1 gives the fire minutes, and LPS 1175 Issue 8.2 of September 2024 gives the forced entry grade in B3, C5 and D10, while the fire and security doors dual certification guide shows the pair proved on the same leaf.

Patients who move slowly need the route to stay clear while staff reach them, so a leaf that has swollen with damp or a leaf that drags on its frame must be put right at once. A leaf that will not shut holds no period at all.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

FD60 on the drug store, staff office and plant room

Behind the drug store leaf sit the medicines for the whole unit, so the leaf takes FD60 and stays shut and locked whenever no one is working inside.

Behind the plant room leaf sit the boards and the equipment that keep the air moving and the water hot, so the leaf takes FD60 because the boards behind it feed the whole unit.

The staff office leaf takes FD60 as well, because the patient records behind it cannot be remade once flame reaches them. Each leaf is shut as the last person leaves, because an open leaf holds back no flame.

Who holds the key to the drug store leaf, and when it turns

The drug store leaf carries FD60 and a D10 grade, because the medicines behind it are guarded twice over, once against flame and once against forced entry, and both results can stand in a single report. The fire minutes come from EN 1634-1 and the forced entry grade from LPS 1175 Issue 8, with D10 meaning the set held for ten minutes against the tools named in the test. The dual certification guide shows how the two tests run together on the same leaf, so the period and the grade sit side by side in one report.

The key to the drug store leaf sits with the nurse in charge of the shift, and the leaf is opened only to fetch medicines and shut again behind the person who fetched them. Nobody else holds a copy, and the lock is turned at the end of every shift, so the room stands locked whenever no one is working inside. The locks guide runs through the locks that sit on a leaf like this one, and what the lock must do when the leaf is shut and the room stands empty.

Check Look for When
Leaf shut Meets the frame without a push Each time the room is left
Lock Turns cleanly and holds At the end of the shift
Seals Unpainted and unbroken On the monthly walk
Gap Even round the leaf at 4 mm On the monthly walk

A leaf that stands open overnight guards nothing, and the medicines behind it sit open to flame and to anyone who walks the corridor. The leaf is timber or steel, and the steel versus timber guide weighs the two materials against each other for a room like this one, so the leaf on the drug store suits the room and the traffic past it.

The staff office leaf takes FD60 too, since the records behind it are gone for good once flame has reached them. The plant room leaf takes FD60 for the same reason, since the boards and the equipment behind it warm the water and move the air for the whole unit.

The closer fails at the end of the day: what the drug store round finds

A closer weakens a little at a time, and the first sign is a leaf that closes most of the way and then hangs short of its frame. The gap the leaf leaves is the gap the fire uses, and a closer that cannot draw the leaf to its frame has already taken the hour off the room. The maintenance guide follows the work that keeps a closer drawing the leaf shut, and the inspection checklist sets out what to look for on each leaf when the round reaches it.

The drug store leaf is tried last at the end of the day, because it is the leaf that must be shut before the building empties. It is pushed open and watched as it closes on its own, the seal is checked for paint and for splits, and the lock is turned to see that it holds. A fault found at closing time goes on the list that same evening, so the leaf is mended before the next shift starts.

Pricing the unit runs from the list of leaves, and the healthcare doors quote page takes each room with the period, the grade and the lock its leaf must carry, so the drug store leaf stands on that list with its hour and its D10 beside it.

Treatment rooms and the ward entrance: FD30 beside the bed and the chair

Patients in the treatment rooms sit in chairs for hours while the treatment runs, and patients on the ward sleep in beds through long courses, so the leaves beside them take FD30 to hold the rooms clear while staff reach the patients. Thirty minutes is more than staff need to move patients who cannot move fast, and the leaf gives them that time with the rooms still clear of flame.

Staff see the treatment rooms through a glazed panel in the leaf, so the leaf stays shut while the patients are watched. The panel is proved with the leaf round it, so the report lists the glass, the bead and the fixings together. Which panels a fire leaf may carry is named in the fire door vision panels guide, and the two leaf materials are set beside each other in the steel vs timber fire doors guide.

The treatment room leaf carries FD30 beside the grade the room demands, and its hardware was proved with the leaf, so no fitting fitted later takes the period off it. The leaf on the ward entrance opens to a push from a patient leaning on a frame.

Entrance, reception and waiting area: FD30 on the route patients use

The entrance leaf, the reception leaf and the waiting area leaf all take FD30, because patients pass through them on the way out. Thirty minutes is more than the people on that route need to reach the street, even when some of them move slowly and lean on a frame.

A push bar proved to BS EN 1125 runs across the leaves on the way out where the route serves more than 60 people, and the bar covers no less than 60 percent of the leaf width. A patient reaching the leaf with people behind them opens it with one push, and the bar works whether the supply is on or off. The panic hardware guide names what the bar must do when people push against the leaf, and the emergency exit doors guide covers the leaves on the way out.

The alarm may sound while patients who have never used the building are still in the waiting area, so the route to the street is signed at every turn and nothing stands on it. A leaf on the way out must still open to a push from a patient with a line still in place, and BS 8300 with Approved Document M puts the push below 30 N through the first 30 degrees of swing and below 22.5 N beyond that.

Smoke in the waiting area: Sa and S200 beside the period

Patients leaving the waiting area meet smoke before flame, so the leaves on the way out carry a smoke rating beside their fire period. BS EN 1634-3 names the two smoke ratings, Sa for smoke at room temperature and S200 for smoke at 200 degrees. The smoke control doors guide works through how the route leaves keep the smoke back while the patients move past them.

A leaf that needs to stand open while the unit is busy is held by a device proved to BS EN 1155, and the device lets the leaf go on its own the moment the alarm sounds. How the leaves hold the line between one part of the unit and the next is set out in the fire compartmentation guide, and a wedge under a leaf gives it no period at all while it stands open, so the wedge is never the device that holds a fire leaf.

Closers, seals and gaps: what the oncology period rests on

The hour on an FD60 leaf rests on three things, the closer shutting it, the seals meeting the frame and the gaps staying narrow, because flame slips through a leaf left ajar in seconds and through a wide gap soon after. Its closer holds a proof to BS EN 1154, with EN 1 the smallest power size the standard names and EN 3 the lowest size a fire door takes.

The seal grows across the gap once the temperature at the frame passes 200 degrees and before it reaches 250, and the swollen seal blocks flame and hot gas from slipping past the leaf. The gap round a hung leaf is 4 mm, and a gauge held against it on the monthly walk shows at once when the gap has opened wider. Fitting the seal is covered in the intumescent seals guide, what the closer must do in the fire door closers guide, and measuring the gaps in the fire door gaps guide.

The hinges on a fire leaf hold a proof to BS EN 1935, grade 13 through 200,000 cycles under a leaf of 120 kg and grade 14 through 200,000 cycles under a leaf of 160 kg, so the hinge suits the weight of the leaf it carries. What each sign on a fire door must say is named in the fire door signage guide, and the fire door hardware guide names the fittings that were proved with the leaf.

The wider oncology doorset is judged by its closer

A bed passes through the oncology doors, so the opening is wider than a door that takes only people on foot. A wider door weighs more, and the closer must pull that extra weight shut after every pass, so the width of the opening is judged by the closer that serves it, not by the space it gives the bed. A door wide enough for the bed but too heavy for its closer stands open after the bed has gone, and an open door holds no period.

On the BS EN 1154 scale a fire door closer starts at EN 3, and nothing below that grade may sit on a fire door. The closer pages give the grades a wide fire door closer must meet, and the power is checked against the width of the door it must shut, not against a door half its size.

Part Wide door test Pass mark
Closer Draws the door shut alone Door meets its frame
Hinges Carry the weight without drop Gap stays even round the door
Hold open device Releases when the alarm sounds Door shuts by itself

A gauge against the frame reads the gap in millimetres, and anything past 4 mm on the latch side shows the weight has pulled the door down on its hinges. The gap pages explain the gauge and the reading a wide door should give, and a reading each month shows whether the gap has crept wider since the last check.

The hold open lets go as the bed reaches the corridor

Some doors are held open through the day so beds can pass without a hand on the door, and each one must shut by itself once the device lets go. A device that holds a door open is tested to BS EN 1155, and it lets go by itself when the alarm sounds, so the corridor is shut before the bed reaches it. The upkeep pages list the jobs that keep a closer drawing a wide door shut, and a door left standing open after the alarm holds no minutes at all.

Smoke reaches the waiting area while patients are still being moved, and Sa or S200 stands beside the period on the route doors. One rating stops smoke at room temperature and the other stops it at 200 degrees, and a wide door that will not shut lets smoke walk straight down the corridor behind the last bed out. The smoke pages name the ratings a route door carries beside its period.

The strip in its groove is looked at for paint or splits, because the swell starts near 200 degrees and is done before 250 degrees, and a strip that will not grow leaves the opening unguarded when the heat arrives. The checklist pages give the look its order, door by door, so no door is missed because the day ran short.

When the unit sends out its order, the enquiry checklist for the unit takes each room with the period and the width its door must carry, so the oncology doors that take the beds arrive with closers strong enough to shut them.

The oncology unit fire door order: every leaf, its period and its proof

One list holds the whole fire door order, with a line for every opening that names the leaf, the period, the lock and the closer beside it. One leaf named for the whole unit leaves the fitter to guess.

Every leaf on the order is read before the order is signed, because a closer that arrives after the doorset holds the job up and a leaf with no line beside it cannot be checked on arrival. What the order must hold for every door is set out in the how to specify security doors guide.

The ward manager takes the door list round the unit each month and works each leaf in turn. A dragging leaf, a closer that leaves the leaf standing open or a seal that has been painted over goes beside its own door on the list the day it is found, so the fault is put right before the leaf must hold. The fire door inspection checklist names what to look for on each leaf, and the fire door maintenance guide covers the work that keeps the leaves holding.

The period on an oncology unit leaf follows the room behind it, so the FD60 and FD30 leaves sit on the same list as the grade and the lock for each leaf.

What period should an oncology unit drug store door carry?

FD60 to EN 1634-1, because the medicines sit behind the drug store leaf, and sixty minutes is the hold that room asks for.

What period should a treatment room door carry?

FD30 to EN 1634-1, because the treatment room leaf holds the room clear while staff reach the patients, and half an hour is the hold that room demands.

Can one leaf hold fire and forced entry?

Yes, where one leaf earned its period and its grade in the two tests, so one report carries both together.

Do oncology unit fire doors need a smoke rating?

Yes, Sa or S200 to BS EN 1634-3 sits beside the period on the leaves of the way out, because smoke reaches people leaving the unit before flame does.

What happens when a fire door will not shut?

A leaf that will not shut goes beside its own door on the list the day the fault is found, and the unit does not wait for the next look round before the leaf is put right.

Specifying fire doors for an oncology unit?Send the door list with the period and the lock each room must hold for a tested door quotation.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.