LPS 1175 Issue 8 explained: the A1 to H20 codes, how they map to the old SR1 to SR8 labels, reading certificates and Red Book listings, and drawing pitfalls.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

LPS 1175 Issue 8 replaced the old SR1 to SR8 labels with two-part codes: a tool category letter from A to H plus the minimum delay in minutes. A1 is the old SR1, B3 is SR2, C5 is SR3, D10 is SR4, and the scale runs to H20, the old SR8.

  • Issue 8.2Current issue of LPS 1175
  • FormatLetter for tools, number for minutes
  • RangeA1 up to H20, eight ratings
  • Old labelsSR1 to SR8 still appear on drawings

What Issue 8 changed

Before Issue 8, LPS 1175 used single labels: SR1 to SR8. Each label bundled a tool set and a delay together, which worked until specifiers needed combinations the labels could not express. Issue 8 split the rating into two independent parts.

The first part is a letter, A to H, naming the tool category the product was tested against, from opportunist hand tools at A to extreme toolkits at H. The second part is a number stating the minimum delay in minutes. A rating now reads like B3 or D10 instead of SR2 or SR4.

The old labels did not disappear overnight. Certificates issued under earlier issues remain valid for the products they cover, and drawings produced some time ago still say SR2. The rest of this guide shows how the two systems line up. Our LPS 1175 guide carries the full standard in one place.

The eight ratings, old and new

The table below maps every current Issue 8 rating to the SR label it replaces, with the tool category and minimum delay for each. These are the pairings the industry uses day to day.

Issue 8 Old label Tool category Minimum delay
A1 SR1 A: basic hand tools 1 minute
B3 SR2 B: screwdrivers, pliers, hand saws 3 minutes
C5 SR3 C: crowbars, drills, chisels 5 minutes
D10 SR4 D: sledgehammers, disc cutters, jigsaws 10 minutes
E10 SR5 E: tool category E on the A to H scale 10 minutes
F10 SR6 F: tool category F on the A to H scale 10 minutes
G10 SR7 G: tool category G on the A to H scale 10 minutes
H20 SR8 H: extreme toolkits 20 minutes

Two things stand out. First, SR5 to SR7 all state ten minutes: the difference between them is the tool category, not the delay. Second, only SR8 reaches twenty minutes. If a specification demands more than ten minutes below H20, it is asking for something the standard pairings do not offer.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

How to read a two-part rating

Read the letter first. It tells you which toolkit the product faced, and therefore which attacker it is built to stop. A C rating means the test used crowbars, drills and chisels; a D rating means sledgehammers, disc cutters and jigsaws.

Then read the number. It is the minimum delay in minutes, measured while the test team attacks the locked product with that toolkit. B3 promises at least three minutes against category B tools; D10 promises at least ten against category D.

Do not read the number as a guarantee of safety for that many minutes in a real attack. It is a test result under controlled conditions, and its job is to let you compare products on equal terms. Our SR2 vs SR3 vs SR4 guide shows how to turn the numbers into a specification.

Letter first, number second. The letter names the attacker and the number names the delay. Both halves matter.

Reading a certificate

A certificate for an LPS 1175 product states the product, the rating in Issue 8 format and the issue of the standard it was tested to. Check all three: a certificate that says SR4 without naming the issue may predate Issue 8, and the product description must match what is actually being supplied, down to the configuration.

Look for the scope. Certificates cover a defined range, such as single and double doorsets up to stated sizes, and anything outside that range is not covered. If your doorset is larger than the certified maximum, the certificate does not apply to it.

Finally, check the date and the certification body. Third-party test evidence means evidence from an independent body, not the manufacturer’s own test report. Where anything is unclear, ask for the Red Book listing, which is the public record. Keep a copy of the certificate with the operations and maintenance manual for the building, so the rating can be checked during future refurbishments.

What a certificate does not prove

A certificate proves one thing: the named product passed the named test, to the named standard, on the day of the test. It proves nothing else. A certificate for a door tested at one size does not prove the same door at a larger size, and a certificate for a door with one set of hardware does not prove the same door with different hardware. The certificate names the product, the rating and the scope, and everything outside that scope is outside the proof.

It does not prove the door as fitted matches the door as tested. A leaf from the tested range fitted into a frame that was never tested, with glass that was never tested in that leaf, is a doorset the certificate never covered. The rating belongs to the complete tested assembly, not to the leaf alone, so a rated leaf in an untested frame is not a rated doorset. Check the frame, the glass, the seals and the hardware against the certificate before the order is placed, not after the doors arrive.

It does not prove the certificate is still the current one. Issue 8.2 is the current issue of LPS 1175, and Issue 8.2 is dated September 2024. A certificate written to an old SR label still names the same rating, because the mapping is fixed: SR2 is the old name for B3, SR3 is the old name for C5, and SR4 is the old name for D10. A new order should quote the Issue 8.2 equivalent so the paperwork matches current listings. Ask for the current certificate and its scope, and file both with the order.

How to check a Red Book listing before the order is placed

The LPCB Red Book lists products that hold current certification, and the listing is the check that sits beside the certificate. A product on the list has a live certification behind it, and a product that is not on the list has no live listing to point to. Ask for the listing entry by name, and read it against the order line by line.

Match four things: the product name, the rating in full, the size range and the options. The rating is a letter and a number together, and both halves must match the order. A SR2 rated steel door resists three minutes of attack with tools such as screwdrivers, pliers and hand saws. C5 covers five minutes with crowbars, drills and chisels, and D10 covers ten minutes with sledgehammers, disc cutters and jigsaws. A listing that names a different rating, a different size or a different hardware set does not cover the order.

Ask for the certificate and the listing together, and keep both with the order. A supplier who can show both without delay is a supplier whose paperwork is in order, and a supplier who can show only one has a gap to close before the order is placed. Our guide to LPS 1175 and PAS 24 compares the two standards side by side, and our guide to keeping an LPS 1175 rating valid sets out the changes that void a rating after handover.

What to ask for What it proves What to check
Certificate The named product passed the named test Rating, scope, size range, date
Red Book listing The certification is current Product name, rating, listing entry
Test report The assembly as tested Leaf, frame, glass, hardware as tested
Hardware schedule The fitted hardware matches the test Every part named, no substitution

Keep the evidence with the doors. The certificate, the listing, the test report and the hardware schedule should travel with the doorset, and the order should name the rating in full, letter and number together.

Checking a Red Book listing

The LPCB Red Book is the public register of certified products. Each listing names the product, the company holding the certification, the issue and the scope should agree line for line. If the listing shows a different rating from the one quoted, work to the listing.

Listings also reveal the configuration limits: maximum sizes, permitted hardware and any options included in the approval. These details decide whether the certified product matches your specification, whether doors, security shutters or grilles, so read them before ordering.

Labelling confusion on older drawings

The most common confusion is also the simplest: drawings that say SR2, SR3 or SR4. These are earlier-issue labels, and they map directly to B3, C5 and D10. When you order, quote the Issue 8.2 code, since it is the language current certificates and listings use: a drawing that says SR2 orders as a B3 rated doorset, while SR3 and SR4 order as C5 and D10 doorsets.

A subtler trap is mixing the two systems in one schedule, for example SR2 (B3) on one door and C5 on the next. Pick one system for the whole project, preferably Issue 8, and convert every old label before the tender goes out.

Watch too for ratings quoted without an issue number at all, such as a bare SR4 on an old drawing. The product may have been recertified since, possibly with a changed scope. Confirm the current listing before reordering to the old label. Our LPS 1175 vs PAS 24 guide sorts out the other common mix-up, and all our guides are listed in one place.

The two-part rating on the order: category, tool and time

Issue 8.2, dated September 2024, gives LPS 1175 eight categories, from A1 to H20, and each category names two things at once: the tools the attacker may use and the time the leaf must hold. A1 takes hand tools and one minute, B3 takes a wider tool set and three minutes, C5 takes five minutes, D10 takes ten, and the higher categories take longer and heavier tools. The order names the category, so the leaf that arrives is the leaf that was proved.

The two parts of the rating travel together on the order, because the category on its own names only half the proof. A leaf proved to B3 against one tool set is not the leaf proved to C5 against another, and a leaf proved for three minutes is not the leaf proved for ten. The category, the tools and the time sit on the same line, so the fitter knows which leaf goes where.

The old names still appear on drawings drawn before Issue 8, and they name the same categories under different letters. SR2 was the old name for B3, SR3 was the old name for C5, and SR4 was the old name for D10. A drawing that names SR2 asks for B3, and the order carries the new name beside the old one, so the leaf that arrives matches the drawing that was drawn.

A rating proved under one issue of the standard is proved under that issue alone, and the order carries the issue beside the category. The Red Book listing names the issue the product was proved under, and the certificate names it too, so the two are checked against each other before the order goes out.

Old names on new drawings: reading SR2, SR3 and SR4 beside B3, C5 and D10

A drawing drawn before Issue 8 names SR2, SR3 or SR4, and the leaf ordered from that drawing must carry the category those names stand for. SR2 stands for B3, SR3 stands for C5, and SR4 stands for D10, so the schedule beside the drawing names the new category for each opening, and the order follows the schedule, not the letters on the drawing alone.

The schedule is checked line by line against the drawings before the order goes out, because a leaf ordered as SR2 on one line and B3 on the next may be the same leaf twice, or two different leaves. The check names the category, the old name and the opening beside each other, so no leaf is ordered twice and no opening is left without a leaf.

Category Old name Time What to check
A1 None 1 minute Category on the order
B3 SR2 3 minutes Old name on the drawing
C5 SR3 5 minutes Old name on the drawing
D10 SR4 10 minutes Old name on the drawing
H20 None 20 minutes Category on the order

The eight categories are set out in the LPS 1175 standard guide, and the two ratings side by side are covered in the LPS 1175 versus PAS 24 guide. What breaks a rating once a door is fitted is named in the keeping an LPS 1175 rating valid guide, and the columns the order needs are set out in the how to specify security doors guide.

Frequently asked questions

Is an SR2 certificate still valid under Issue 8?

The certificate remains valid for the product and scope it covers; Issue 8 did not cancel earlier certifications. For new orders, quote the Issue 8.2 equivalent, B3, so the paperwork matches current listings.

What does B3 mean on a new certificate?

Category B tools with a minimum three-minute delay: the Issue 8 name for the old SR2. The letter states the toolkit and the number the delay in minutes.

Why do some products show ratings like C3 or D5?

Issue 8 defines the rating as a letter plus a number, so pairings beyond the eight in the table can exist for specialist products. Treat any unusual pairing as a bespoke certification and check its scope carefully.

My drawings say SR4. What do I order?

Order D10, the Issue 8 equivalent of SR4: ten minutes against category D tools. Confirm the current certificate and its scope before placing the order, especially if the drawings are old.

Does Issue 8 change the test itself?

The attack testing continues in the same form: a test team attacks the locked product with the defined toolkit and the delay is measured. What changed is how the result is classified and labelled, not the principle of the test.

Confused by the rating on your drawings?Send them through the quote form and we will translate every label into current Issue 8 codes.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.