Certified physical security

ArxBridge
Installer checking the seal of navy steel fire-rated doors in a UK office corridor

ArxBridge

Fire Door Rules for Pawnbrokers

A pawnbroker holds cash, jewellery and pledged goods behind its leaves, so each door takes the fire period the room behind it demands, FD30 or FD60.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

A pawnbroker shop is a counter, a cash office and back rooms behind one entrance, and the fire rules for the building follow the rooms behind each leaf. The entrance and the counter take FD30, and the cash office, the back office and the plant room take FD60, because the rooms behind the counter hold cash, pledges and records that need a longer hold than the public route.

The minutes on a pawnbroker leaf are counted by EN 1634-1, which runs from 30 to 120 and puts a letter beside the count to say what the leaf held back. E means the leaf held flame alone, EW means it held flame with part of the heat, and EI means it held flame and heat together, so FD30 and FD60 name the count while the letter names what was held.

A pawnbroker follows the same rules as any other high street shop that takes cash at a counter, and the leaf on each room takes its period from what sits behind it. The fire door regulations retail guide covers the fire rules for a shop that holds a queue in front of a counter, and the fire door regulations offices guide covers the rooms a pawnbroker keeps behind its shop front.

  • FD30 / FD60Fire periods to EN 1634-1
  • Cash officeWhere the period rises
  • Sa / S200Smoke ratings to BS EN 1634-3
  • One listEvery pawnbroker door named

Five rooms in a pawnbroker shop: the period each one takes

Five rooms make up a pawnbroker, and the period follows what each room holds. The queue comes in through the entrance, the counter takes the cash and the pledges, the cash office keeps the takings and the goods awaiting redemption, the back office keeps the keys and the redemption papers, and the plant room keeps the building running through the working day.

FD60 sits on the cash office, the back office and the plant room, because the takings, the papers and the boards behind those leaves need sixty minutes before flame reaches them. FD30 sits on the entrance and the counter, because the queue on that route can reach the street in far less time than thirty minutes.

Every opening gets its own line on the order, with the leaf and the period written beside it, so no leaf is hung on guesswork. The table below names the five rooms, the period each one takes and the grade beside the period, so the fitter can check each leaf against its line as it is hung.

Room Period Grade What to check
Entrance FD30 B3 Leaf, glass, closer
Counter FD30 B3 Leaf, glass, closer
Cash office FD60 D10 Leaf, lock, seals
Back office FD60 C5 Leaf, lock, seals
Plant room FD60 C5 Leaf, lock, seals

What FD30 and FD60 hold back behind a pawnbroker counter

The period on a leaf is a count of minutes earned in the test, and the doorset that earns it is the leaf, the frame, the fixings and the lock proved as one. The report behind the doorset names the period it holds, and the order writes that period beside the leaf, so the leaf that arrives matches the room that asked for it. What the report must hold is named in the fire door certification guide.

A leaf in the shop may need to hold fire as well as forced entry, and one doorset carries both proofs in a single report. The fire minutes come from EN 1634-1 and the forced entry grade comes from LPS 1175 Issue 8.2 of September 2024, in B3, C5 and D10, and the fire and security doors dual certification guide shows how the pair is proved on the same leaf.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

FD60 on the rooms that hold takings, records and plant

Behind the cash office leaf sit the takings and the pledges the shop runs on, so the leaf takes FD60 and stays shut whenever no one is counting cash. Sixty minutes is the hold the room asks for, because flame that reaches it takes the takings and the records the shop cannot replace.

The back office holds the keys, the redemption papers and the records, and its leaf takes FD60, because the keys and the papers behind it are what the shop opens with each morning. A leaf left standing open through the day holds nothing back, so the back office leaf is shut each time the last person leaves the room.

The plant room holds the boards and the equipment that keep the lights and the till running, and its leaf takes FD60 because the boards behind it feed the whole shop. The leaves of a plant room are covered in full in the plant room fire doors guide.

Closing time at the counter: the last leaf shut before the shutter

The takings and the pledges that keep the shop running sit behind the cash office leaf, and the leaf answers with FD60 and a D10 grade, the hour against flame and ten minutes against the tool set named in the test. EN 1634-1 gives the fire minutes and LPS 1175 Issue 8 gives the forced entry grade, and the dual certification guide shows the pair proved on the same leaf, so one report carries the period and the grade side by side.

Only the manager on duty holds the key to the cash office leaf, and the leaf is opened to count the takings and shut again as soon as the counting is done. The lock is turned before the shutter comes down at the end of the day, so the room stands locked whenever the shop stands empty. The locks guide names the locks that suit a leaf like this one, and the work the lock must do once the leaf is shut for the night.

Leaf Check Done when
Cash office Shut and locked Takings counted and put away
Back office Shut, papers filed Keys hung and the room left
Plant room Shut, boards checked Room locked for the night

The back office leaf takes FD60 as well, because the keys and the redemption papers behind it open the shop each morning, and flame that reaches them takes the records the shop cannot remake. The leaf is shut whenever the last person leaves the room, because a leaf left open through the day holds nothing back.

The counter leaf and the entrance leaf carry FD30, because the queue on that route reaches the street in far less than thirty minutes, and the two leaves are the way the queue walks out. The retail guide follows the fire rules for a shop where a queue stands at a counter, and the offices guide follows the rooms a shop keeps behind its front, so the leaves at the front and the leaves at the back are ordered from the same list.

The takings room leaf guards the takings long after the queue has gone

Once the queue has gone and the shutter is down, the cash office leaf is the only thing between the takings and the street, and the hour it holds is the hour the shop has to answer an alarm. A leaf left open overnight guards nothing, and the takings behind it lie open to flame and to any stranger who walks the shop after dark. The shutter comes down after the leaves are shut, never before, because the leaves are the last line the shop has once the street is shut out. The maintenance guide covers the work that keeps a leaf shutting as it should, and the closer that draws it to its frame after every pass.

Each month the door list is worked through leaf by leaf, every leaf pushed open and watched as it meets its frame, every seal looked at for paint, every lock tried with its key. A fault is written against its own door as soon as it is found, and the leaf is mended before the month runs out.

Before the order goes out, the security door enquiry checklist runs through the rooms one by one, and the cash office leaf sits at the top of that list with its period, its grade and its lock beside it.

The counter and the entrance: FD30 on the way the queue walks

Both the counter leaf and the entrance leaf take FD30, because the queue stands at the counter and walks to the street through the entrance. Half an hour is more than the queue needs to leave, and the route behind the leaves is short, with the street at the end of it.

Where the route serves a crowd, a bar proved to BS EN 1125 sits on the leaves on the way out, running across at least 60 percent of the leaf width, so a person who reaches the leaf in a crowd opens it with one push. What the bar must do for a crowd pushing against the leaf is set out in the panic hardware guide, and the leaves on the way out are covered in the emergency exit doors guide.

Staff see the queue through a glazed panel in the counter leaf, so the leaf stays shut while the queue is watched, and the pane is proved with the leaf round it, with the glass, the bead and the fixings named together in the report. The panels a fire leaf can carry are covered in the fire door vision panels guide, and the two leaf materials are set beside each other in the steel vs timber fire doors guide.

Smoke at the counter: Sa and S200 beside the period

People leaving the shop meet smoke before flame, so the leaves on the way out carry a smoke rating beside their fire period. The two ratings come from BS EN 1634-3, Sa for smoke at room temperature and S200 for smoke at 200 degrees, and how the route leaves keep the smoke back while the queue moves past them is worked through in the smoke control doors guide.

Where a leaf must stay open through a delivery, a hold-open device proved to BS EN 1155 holds it, and the device lets the leaf go on its own the moment the alarm sounds. The fire compartmentation guide names how the leaves hold the line between one part of the shop and the next, and a chair wedged under a leaf gives it no period at all while it stands open, so the wedge is never the device that holds a fire leaf.

Closers, seals and gaps on pawnbroker doors: what the period rests on

An hour from a FD60 leaf rests on its closer shutting it, its seals meeting the frame and its gaps staying narrow, because flame passes through a leaf left ajar in seconds and through a wide gap soon after. Each closer is proved to BS EN 1154, with the power size running from EN 1 for a leaf 750 mm wide and 20 kg in weight to EN 7 for a leaf 1,600 mm wide and 160 kg in weight, and EN 3 is the minimum on a fire door.

Heat round the frame makes the seal swell once it reaches 200 to 250 degrees, and the swollen seal closes the gap so flame and hot gas cannot pass. Once the leaf is hung the gaps round it measure 4 mm, and a gauge on the monthly round shows whether a gap has grown past that figure. How the seal is fitted is named in the intumescent seals guide, what the closer must do is named in the fire door closers guide, and how the gaps are measured is named in the fire door gaps guide.

Hinges to BS EN 1935 carry a fire leaf, with grade 13 proved for 200,000 cycles at 120 kg and grade 14 proved for 200,000 cycles at 160 kg, so the heavier leaf takes the heavier hinge. The force to open a leaf on the public route stays below 30 N for the first 30 degrees and below 22.5 N beyond them, to BS 8300 and Approved Document M, so a caller can push the leaf open without help. Each fire door carries a sign that says what the leaf is, and what each sign must say is named in the fire door signage guide.

A pawnbroker counter door latch wears thin by Friday

The counter door opens and shuts a hundred times through the trading day, and the latch takes a little wear on every pass. Staff push through with goods in their hands, the door swings back, and the latch clicks home, and by Friday the click has gone soft, because the latch no longer meets the strike the way it did on Monday. A door whose latch will not catch stands ajar between customers, and a door that stands ajar holds no period.

The latch is proved beside the door, so a later fitting carries no proof of its own. The lock pages name the locks that suit a door like this one, and the job the lock does after the door is shut for the night, and a latch that misses its strike is written down beside its own door the day it turns up.

Day What shows What it means
Monday Latch clicks home Door shuts as it should
Midweek Click turns soft Latch wears against its strike
Friday Door stands ajar Latch no longer catches

On the BS EN 1154 scale a shop fire door takes EN 3 as its lowest grade, which matters more where the door swings a hundred times a day, because the closer must still draw the door to its frame after the last pass. The closer pages give the grades a shop fire door closer must meet, and a closer that cannot draw the door shut has already taken the period off the counter.

The counter door shuts a hundred times a day and the queue keeps moving

The queue at the counter moves all day, and the door behind the counter swings with it, opening for staff and shutting behind them. The closer draws the door shut after every pass, and the door meets its frame before the next customer steps forward, so the shop floor and the rooms behind the counter stay apart through the whole day. The upkeep pages cover the jobs that keep a counter door shutting through the trading day.

Smoke at the counter reaches the entrance while the queue is still standing, which is why Sa and S200 sit beside the period on the route doors, with one for smoke at room temperature and one for smoke at 200 degrees, and a counter door that stands ajar lets smoke walk straight through the shop behind the last customer out. The smoke pages cover the ratings that keep the way out clear while a shop empties.

A gauge shows the gap even at 4 mm round the counter door, and the strip in its groove sits unpainted and unbroken. Near 200 degrees the strip starts its swell, and before 250 degrees the swell has closed the gap. The retail pages set out the fire rules for a shop with a queue at its counter, and a door whose strip will not grow holds no period at all.

Before the order goes out, the checklist that closes the enquiry takes the rooms in turn, and the counter door sits on that list with its period and its latch beside it, so the shop doors that swing a hundred times a day arrive built for the trade.

Getting the queue out: the way from the till to the street

The alarm may sound while callers who have never used the building stand at the counter, so the route to the street is signed at every turn. Displays and stock are kept off the route, and the entrance leaf opens to one push from whoever reaches it first, whether the supply to the building is on or off.

Martyns Law puts premises in tiers by the number of people they hold, with one tier for 200 to 799 people and a higher tier at 800 and above, and it received Royal Assent in April 2025, with the go-live expected in spring 2027. What each tier asks for is set out in the Martyns Law guide for premises, and a pawnbroker holding 200 or more people falls in a tier that guide covers.

The pawnbroker fire door order: every leaf, its period and its proof

The order gives every opening its own line, with the leaf, the period, the lock and the closer written beside it. One leaf named for the whole shop leaves the fitter to guess, and a leaf in the wrong room holds flame for the wrong length of time.

Before the order is signed it is read leaf by leaf, because a closer that arrives after the doorset holds the job up, and a leaf with no line beside it cannot be checked when it arrives. What the order must hold for every door is listed in the how to specify security doors guide.

The shop manager takes the door list round the building once a month and tries the leaves in turn, so every leaf is tried before the month is out. A leaf that drags on the floor, a closer that leaves the leaf standing open or a seal that has been painted over is written against its own door on the day it is found, so the fault is put right before the leaf is asked to hold. What to look for on each leaf is named in the fire door inspection checklist, and the work that keeps the leaves holding is covered in the fire door maintenance guide.

The period on a pawnbroker leaf follows the room behind it, so FD60 and FD30 must sit on the same list as the grade and the lock for each leaf.

What period should a pawnbroker cash office door carry?

FD60 to EN 1634-1, because the cash office holds the takings and the pledges, and an hour is the hold that room demands.

What period should a pawnbroker entrance door carry?

FD30 to EN 1634-1, because the entrance is the way out for the queue and the public route needs half an hour.

Can one leaf hold fire and forced entry?

Yes, where a single doorset went through the fire test and the forced entry test, so one report names both the period and the grade.

Do pawnbroker fire doors need a smoke rating?

Yes, Sa or S200 to BS EN 1634-3 sits beside the period on the route leaves, because smoke reaches the people leaving before flame does.

What happens when a fire door will not shut?

The fault is written up against its own door on the day it is found, and the leaf is put right without waiting for the next look round.

Specifying fire doors for a pawnbroker?Send the door list with the period each room must hold for a tested door quotation.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.