How to specify security doors: a checklist for architects
How to specify security doors: performance clauses, doorset scope, hardware, frames, installation and evidence, with a sample clause for architects in the UK.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
A security door specification succeeds when it names the performance, not just the product. State the standard, the issue, the rating and the certification scheme, then describe the complete doorset: leaf, frame, hardware, fixings and installation. This checklist walks architects through each clause so the door that arrives matches the door that was drawn.
- Performance firstName the standard, issue, rating and certification scheme.
- Whole doorsetLeaf, frame, hardware, glazing and fixings as one assembly.
- ScheduleRecord every opening on a door schedule with a unique mark.
- EvidenceAsk for test evidence and installation records at handover.
Name the performance in full
A performance clause has four parts: the standard, the issue, the rating and the certification scheme. “Tested to LPS 1175” is not a clause, it is a hint. “Steel doorset tested to LPS 1175 Issue 8.2, rating D10, under an LPCB certification scheme” tells the manufacturer exactly what to build and the client exactly what to expect. Our LPS 1175 guide sets out the full rating table so the clause names the right class.
Always cite the issue. Ratings move between issues of a standard: the old SR1 to SR8 scale maps to the current A1 to H20 classes, and a clause that names no issue invites the wrong evidence. Write “Issue 8.2” and the ambiguity disappears.
Name the scheme that stands behind the rating. Third-party certification means the product is audited, not just tested once. A clause without a scheme leaves you no route to check that the door on site matches the door in the test report.
Before naming the performance, it helps to know the full menu. Our guide to the types of security doors for commercial buildings covers every main type and where each fits.
Specify a complete doorset, not a leaf
The rating belongs to the assembly: leaf, frame, hardware, glazing, seals and fixings, installed as tested. A clause that prices “a D10 leaf” while leaving the frame to the builder has specified half a doorset. Write the doorset as one item, supplied and installed by one party, so responsibility cannot be split later.
List what “complete” includes on your project: the leaf, the frame, the tested hardware set, any glazing, thresholds, seals and the fixings into the wall. Security doors are supplied as rated assemblies, which is the model to follow in the clause.
Resist letting others supply their own hardware. Every lock, hinge and closer interacts with the tested build, and a substitution made for convenience can quietly void the evidence. Our cost factors guide explains what each part of the doorset does to the budget.
Hardware, cylinders and ironmongery
Hardware is specified as sets, not items. Give each doorset a hardware set reference, such as H-1 or H-2, and schedule every component: hinges, lock cases, cylinders, handles, closers, seals and any electric devices. The set travels with the door mark through procurement and installation, so nothing gets lost between the schedule and the site.
Cylinders need their own line. Specify the security standard for the cylinder, anti-drill and anti-snap features, and whether keying is keyed-to-differ, keyed-alike or master-keyed. The cylinder is the most attacked component on the door, so a vague “cylinder to suit” is an open invitation to downgrade.
Schedule the power and data routes with the door, not after it.
Frames, fixings and the surrounding wall
A rated frame fixed to a weak wall protects nothing. The clause should state the frame material and section, the fixing type and centres, and the minimum wall construction the fixings are tested into. If the wall is lightweight block or stud, say so, and ask how the frame achieves its rating there.
Fixing details belong in the specification, not in a site meeting. “Fixed to manufacturer’s tested details” only works if those details are submitted and approved before installation. Ask for the fixing schedule with the shop drawings and review it like any other structural interface.
Coordinate the structural opening early. Rated frames are deeper and heavier than standard ones, and the opening needs the tolerance to receive them. A late discovery that the frame does not fit the hole is how ratings get compromised on site.
Fire, acoustic and access control interfaces
Doors rarely carry one performance. A doorset can need LPS 1175 D10, EI60 fire resistance and an acoustic rating at once, and each performance must be evidenced on the same assembly. Our fire and security doors carry both, and the fire ratings guide explains how E, EW and EI classifications work.
Security hardware and fire performance can conflict. A lock case that suits a security test may not suit a fire test on the same leaf, so the clause must require evidence covering both. Never assume the performances combine just because each is available separately.
Access control is part of the doorset, not a separate package. Name the devices, the fail-safe or fail-secure behaviour, the power supply and who wires it. On education projects, where doors serve both safeguarding and fire escape, these interfaces decide whether the door works on day one.
The interface the door must meet: fire, sound and the reader beside it
A door rarely works alone, because the leaf must meet the fire alarm, the access reader and the acoustic seal beside it, and each meeting point is an interface the specification must name. The fire interface should say what the leaf does when the alarm sounds, with the hold-open release and the closer named together, so the leaf shuts on its own the moment the alarm sounds.
The acoustic interface should name the sound the leaf must hold back, with the seals and the threshold named beside the rating, because a leaf that holds fire but lets sound through fails the room beside it. The rating should be written with its standard beside it, so the leaf that arrives is the leaf the room needs.
The access interface should name the reader, the release and the wiring beside the leaf, with the answer for the night the power fails written beside each door. A leaf that must open for the way out and a leaf that must stay shut for the way in need different answers, and the answer should be tested at handover with the power off.
The interfaces should be checked together, because a closer fitted for the fire interface can fight the reader fitted for the access interface, and a seal fitted for sound can stop the latch from throwing. The specification should name one person to own the interfaces, so no meeting point is left to two trades who never speak.
The handover the specification must ask for: the pack that proves the doors
The handover should be written into the specification before the order goes out, because a handover asked for at the end is a handover the supplier never priced. The pack should hold the test report, the classification and the record of each door as fitted, so the doors that stand in the building can be checked against the doors the order asked for.
Each door should be tried before the pack is signed, with the leaf opened and watched as it comes home, the latch checked in its strike, and the gap beside the leaf measured. A leaf that drags, a seal that has slipped, or a closer that has lost its pull should be written against its door on the day it is found, with the repair booked before the pack is signed.
The record of the handover should name each door, the fault found and the day it was found, so the file shows the state of the building on the day it was handed over. A file that holds the repairs holds the proof the doors still stand, and a building with no file behind it has nothing to show when its doors are asked about.
The sample clause in the specification should be adapted to the building, not copied as it stands, because a clause written for a hospital names interfaces a school never needs, and a clause written for a school leaves out the interfaces a hospital must have. The clause should name the performance, the interfaces and the handover together, so the order that follows it asks for the whole doorset and nothing less.
| Part | What the specification names | What to check | When |
|---|---|---|---|
| Fire interface | Alarm release, closer | Leaf shuts on alarm | At handover |
| Acoustic interface | Sound rating, seals | Leaf holds sound | Before the order |
| Access interface | Reader, release, wiring | Power failure answer | Before the order |
| Handover pack | Report, classification, record | Pack checked line by line | At handover |
| Sample clause | Performance, interfaces, handover | Adapted to the building | Before the order |
The mistakes that weaken a specification are named in the security door specification mistakes guide, and what can break a rating once a door is fitted is named in the keeping an LPS 1175 rating valid guide. What each visit should look for is set out in the fire door inspection checklist, and the doors that must hold both fire and forced entry are covered in the security door maintenance checklist.
Installation, commissioning and handover
The best doorset fails if it is fitted badly. The clause should require installation by trained teams to the manufacturer’s tested details, with records of the fixings used and the gaps achieved. Installation on occupied sites needs phasing, dust control and agreed working hours, so write those into the preliminaries rather than leaving them to goodwill.
Commissioning covers everything electric: readers, strikes, maglocks, alarms and their interfaces with the building systems. Specify a witnessed test of each function and a written log of the results, signed off before handover.
Handover is not a handshake. Require the test evidence, the installation records, the hardware schedule as fitted and the maintenance instructions. Without them, the next person to touch the door works blind, and the building owner inherits the risk.
Evidence to request before acceptance
Ask for three things: the test report or certificate covering the exact doorset, the certification scheme listing, and the installation records. The test evidence must name the configuration you bought, including the leaf size range, hardware set, glazing and frame. A report for a different configuration is not evidence.
Check the dates and the issue cited. Evidence to a superseded issue of the standard may not satisfy the clause you wrote. If the report cites Issue 7 and your clause says Issue 8, ask for the gap to be closed before acceptance.
Keep the evidence with the building, not in an email archive. The operations team will need it when hardware is replaced further down the line, and a lost report means the next lock change is a guess. The specification mistakes guide shows how missing evidence becomes a problem long after handover.
A sample clause to adapt
The callout below is a starting point. Replace the bracketed items with your project’s values and attach your hardware schedule and door schedule alongside it.
Sample clause. “Doorset D-12: steel security doorset tested to LPS 1175 Issue 8.2 (September 2024), rating D10, supplied and installed as a complete assembly including frame, tested hardware set H-4, and fixings to manufacturer’s tested details. Provide third-party test evidence, certification scheme listing and installation records at handover.”
For doors that also need fire performance, add the classification and the evidence route in the same sentence. One clause, one assembly, one set of evidence. For early-stage advice, design support can review your door schedule before tender, and you can browse all guides for related topics.
The door schedule, column by column
If your schedule captures the columns below, the drawings, the order and the installation all work from the same truth. Anything missing here becomes a question on site.
| Column | What to record |
|---|---|
| Door mark | A unique reference for every opening, used on drawings and schedules |
| Location and use | Where the door sits and what it protects |
| Rating | Standard, issue, class and certification scheme |
| Leaf and frame | Construction, size, handing and frame section |
| Hardware set | The H-reference covering every component |
| Other performances | Fire, acoustic, access control and finish |
What the specification does not cover
A specification describes the doorset, not the building around it. It does not prove the wall can carry the frame, the floor can take the leaf weight, or the opening is square. Those are survey findings, and a schedule written from drawings alone carries assumptions that only appear on site. Send the survey with the enquiry, and name who measured each opening.
The specification also does not cover what happens after handover. It says nothing about who inspects the door, how often, or what record is kept. A doorset that is never checked drifts out of its tested state: hinges loosen, seals wear, a closer is adjusted by hand. Name the inspection routine in the handover pack, or the rating fades without anyone noticing.
It does not cover the programme either. A doorset ordered late, or changed after manufacture starts, is a doorset built in a rush or built twice. The specification fixes the design; the programme fixes when it is built. Agree both before the order is placed, and record any change in writing with its effect on the test evidence.
It does not cover the people who use the door. A doorset specified for security alone can fail the people who pass through it every day: a leaf too heavy for the staff who open it, a lock that needs two hands, a threshold that trips. Test the daily use against the people who will use it, not against the test standard alone. A doorset that cannot be opened by the people who use it will be propped open, and a propped door is a door that protects nothing.
And it does not cover the rest of the line. A rated door in an unrated wall, beside an unrated window, protects nothing. The specification must name the wall, the frame fixings and the glazing beside the door, because the rating covers the assembly and the opening around it, not the leaf on its own.
Mistakes that weaken a specification
Most failed specifications are decided at the writing stage, not on site. The six checks below catch the errors that appear most often.
- Naming a rating without the standard and the issue, so the supplier cannot tell LPS 1175 Issue 8.2 (September 2024) from an older issue.
- Specifying the leaf and leaving the frame, fixings and hardware to be settled later.
- Adding access control after manufacture, when cable routes and lock cases are already fixed.
- Changing the finish after the test, where a different coating changes the tested build.
- Asking for no evidence at order stage, then chasing certificates at handover.
- Writing one rating for every opening, instead of matching each doorset to its own threat.
A specification that names the standard, the issue, the class, the doorset and the evidence leaves nothing to interpret. For the errors that quietly erase ratings, see the specification mistakes guide, and for the ratings in full, see the LPS 1175 page. Where fire and security meet on one doorset, see the dual certification guide, and for keeping the rating valid after handover, see keeping an LPS 1175 rating valid.
Frequently asked questions
Should I name a manufacturer in the specification?
You do not have to. A performance specification that names the standard, issue, rating and scheme lets any capable supplier bid, which keeps pricing honest. If you do name one, add “or equivalent approved” and define exactly what equivalent must evidence.
Why does the issue of the standard matter?
Because ratings and test methods change between issues. LPS 1175 Issue 8 uses the A1 to H20 classes that replaced the old SR1 to SR8 scale. A clause without an issue can be answered with evidence to a superseded version, which may not meet the client’s requirement.
Who coordinates access control with the door?
Name one party in the specification. Electric hardware affects the leaf construction, the power supply and the fire strategy, so it cannot be left to coordinate on site. Give the door supplier the device schedule before manufacture and make one contractor own the interface.
How do I specify fire and security on one door?
Require evidence for both performances on the same assembly, and say so in one clause. A leaf tested for security and a different leaf tested for fire do not make a combined doorset. Ask for the test evidence covering the exact configuration before the order is placed.
What should the door schedule include?
Every opening gets a row: door mark, location, rating with standard and issue, leaf and frame details, hardware set reference, fire and acoustic needs, access control and finish. The schedule is the single source of truth that the drawings, the order and the installation all follow.
Before you ask for a quote, run through the security door enquiry checklist so each opening arrives with its size, use and rating.
Get a free quote
Related
More in guides for specifiers