How to specify security doors: a checklist for architects

How to specify security doors: performance clauses, doorset scope, hardware, frames, installation and evidence, with a sample clause for architects in the UK.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

A security door specification succeeds when it names the performance, not just the product. State the standard, the issue, the rating and the certification scheme, then describe the complete doorset: leaf, frame, hardware, fixings and installation. This checklist walks architects through each clause so the door that arrives matches the door that was drawn.

  • Performance firstName the standard, issue, rating and certification scheme.
  • Whole doorsetLeaf, frame, hardware, glazing and fixings as one assembly.
  • ScheduleRecord every opening on a door schedule with a unique mark.
  • EvidenceAsk for test evidence and installation records at handover.

Name the performance in full

A performance clause has four parts: the standard, the issue, the rating and the certification scheme. “Tested to LPS 1175” is not a clause, it is a hint. “Steel doorset tested to LPS 1175 Issue 8.2, rating D10, under an LPCB certification scheme” tells the manufacturer exactly what to build and the client exactly what to expect. Our LPS 1175 guide sets out the full rating table so the clause names the right class.

Always cite the issue. Ratings move between issues of a standard: the old SR1 to SR8 scale maps to the current A1 to H20 classes, and a clause that names no issue invites the wrong evidence. Write “Issue 8.2” and the ambiguity disappears.

Name the scheme that stands behind the rating. Third-party certification means the product is audited, not just tested once. A clause without a scheme leaves you no route to check that the door on site matches the door in the test report.

Before naming the performance, it helps to know the full menu. Our guide to the types of security doors for commercial buildings covers every main type and where each fits.

Specify a complete doorset, not a leaf

The rating belongs to the assembly: leaf, frame, hardware, glazing, seals and fixings, installed as tested. A clause that prices “a D10 leaf” while leaving the frame to the builder has specified half a doorset. Write the doorset as one item, supplied and installed by one party, so responsibility cannot be split later.

List what “complete” includes on your project: the leaf, the frame, the tested hardware set, any glazing, thresholds, seals and the fixings into the wall. Security doors are supplied as rated assemblies, which is the model to follow in the clause.

Resist letting others supply their own hardware. Every lock, hinge and closer interacts with the tested build, and a substitution made for convenience can quietly void the evidence. Our cost factors guide explains what each part of the doorset does to the budget.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Hardware, cylinders and ironmongery

Hardware is specified as sets, not items. Give each doorset a hardware set reference, such as H-1 or H-2, and schedule every component: hinges, lock cases, cylinders, handles, closers, seals and any electric devices. The set travels with the door mark through procurement and installation, so nothing gets lost between the schedule and the site.

Cylinders need their own line. Specify the security standard for the cylinder, anti-drill and anti-snap features, and whether keying is keyed-to-differ, keyed-alike or master-keyed. The cylinder is the most attacked component on the door, so a vague “cylinder to suit” is an open invitation to downgrade.

Schedule the power and data routes with the door, not after it.

Frames, fixings and the surrounding wall

A rated frame fixed to a weak wall protects nothing. The clause should state the frame material and section, the fixing type and centres, and the minimum wall construction the fixings are tested into. If the wall is lightweight block or stud, say so, and ask how the frame achieves its rating there.

Fixing details belong in the specification, not in a site meeting. “Fixed to manufacturer’s tested details” only works if those details are submitted and approved before installation. Ask for the fixing schedule with the shop drawings and review it like any other structural interface.

Coordinate the structural opening early. Rated frames are deeper and heavier than standard ones, and the opening needs the tolerance to receive them. A late discovery that the frame does not fit the hole is how ratings get compromised on site.

Fire, acoustic and access control interfaces

Doors rarely carry one performance. A doorset can need LPS 1175 D10, EI60 fire resistance and an acoustic rating at once, and each performance must be evidenced on the same assembly. Our fire and security doors carry both, and the fire ratings guide explains how E, EW and EI classifications work.

Security hardware and fire performance can conflict. A lock case that suits a security test may not suit a fire test on the same leaf, so the clause must require evidence covering both. Never assume the performances combine just because each is available separately.

Access control is part of the doorset, not a separate package. Name the devices, the fail-safe or fail-secure behaviour, the power supply and who wires it. On education projects, where doors serve both safeguarding and fire escape, these interfaces decide whether the door works on day one.

The interface the door must meet: fire, sound and the reader beside it

A door rarely works alone, because the leaf must meet the fire alarm, the access reader and the acoustic seal beside it, and each meeting point is an interface the specification must name. The fire interface should say what the leaf does when the alarm sounds, with the hold-open release and the closer named together, so the leaf shuts on its own the moment the alarm sounds.

The acoustic interface should name the sound the leaf must hold back, with the seals and the threshold named beside the rating, because a leaf that holds fire but lets sound through fails the room beside it. The rating should be written with its standard beside it, so the leaf that arrives is the leaf the room needs.

The access interface should name the reader, the release and the wiring beside the leaf, with the answer for the night the power fails written beside each door. A leaf that must open for the way out and a leaf that must stay shut for the way in need different answers, and the answer should be tested at handover with the power off.

The interfaces should be checked together, because a closer fitted for the fire interface can fight the reader fitted for the access interface, and a seal fitted for sound can stop the latch from throwing. The specification should name one person to own the interfaces, so no meeting point is left to two trades who never speak.

The handover the specification must ask for: the pack that proves the doors

The handover should be written into the specification before the order goes out, because a handover asked for at the end is a handover the supplier never priced. The pack should hold the test report, the classification and the record of each door as fitted, so the doors that stand in the building can be checked against the doors the order asked for.

Each door should be tried before the pack is signed, with the leaf opened and watched as it comes home, the latch checked in its strike, and the gap beside the leaf measured. A leaf that drags, a seal that has slipped, or a closer that has lost its pull should be written against its door on the day it is found, with the repair booked before the pack is signed.

The record of the handover should name each door, the fault found and the day it was found, so the file shows the state of the building on the day it was handed over. A file that holds the repairs holds the proof the doors still stand, and a building with no file behind it has nothing to show when its doors are asked about.

The sample clause in the specification should be adapted to the building, not copied as it stands, because a clause written for a hospital names interfaces a school never needs, and a clause written for a school leaves out the interfaces a hospital must have. The clause should name the performance, the interfaces and the handover together, so the order that follows it asks for the whole doorset and nothing less.

Part What the specification names What to check When
Fire interface Alarm release, closer Leaf shuts on alarm At handover
Acoustic interface Sound rating, seals Leaf holds sound Before the order
Access interface Reader, release, wiring Power failure answer Before the order
Handover pack Report, classification, record Pack checked line by line At handover
Sample clause Performance, interfaces, handover Adapted to the building Before the order

The mistakes that weaken a specification are named in the security door specification mistakes guide, and what can break a rating once a door is fitted is named in the keeping an LPS 1175 rating valid guide. What each visit should look for is set out in the fire door inspection checklist, and the doors that must hold both fire and forced entry are covered in the security door maintenance checklist.

Installation, commissioning and handover

The best doorset fails if it is fitted badly. The clause should require installation by trained teams to the manufacturer’s tested details, with records of the fixings used and the gaps achieved. Installation on occupied sites needs phasing, dust control and agreed working hours, so write those into the preliminaries rather than leaving them to goodwill.

Commissioning covers everything electric: readers, strikes, maglocks, alarms and their interfaces with the building systems. Specify a witnessed test of each function and a written log of the results, signed off before handover.

Handover is not a handshake. Require the test evidence, the installation records, the hardware schedule as fitted and the maintenance instructions. Without them, the next person to touch the door works blind, and the building owner inherits the risk.

Evidence to request before acceptance

Ask for three things: the test report or certificate covering the exact doorset, the certification scheme listing, and the installation records. The test evidence must name the configuration you bought, including the leaf size range, hardware set, glazing and frame. A report for a different configuration is not evidence.

Check the dates and the issue cited. Evidence to a superseded issue of the standard may not satisfy the clause you wrote. If the report cites Issue 7 and your clause says Issue 8, ask for the gap to be closed before acceptance.

Keep the evidence with the building, not in an email archive. The operations team will need it when hardware is replaced further down the line, and a lost report means the next lock change is a guess. The specification mistakes guide shows how missing evidence becomes a problem long after handover.

A sample clause to adapt

The callout below is a starting point. Replace the bracketed items with your project’s values and attach your hardware schedule and door schedule alongside it.

Sample clause. “Doorset D-12: steel security doorset tested to LPS 1175 Issue 8.2 (September 2024), rating D10, supplied and installed as a complete assembly including frame, tested hardware set H-4, and fixings to manufacturer’s tested details. Provide third-party test evidence, certification scheme listing and installation records at handover.”

For doors that also need fire performance, add the classification and the evidence route in the same sentence. One clause, one assembly, one set of evidence. For early-stage advice, design support can review your door schedule before tender, and you can browse all guides for related topics.

The door schedule, column by column

If your schedule captures the columns below, the drawings, the order and the installation all work from the same truth. Anything missing here becomes a question on site.

Column What to record
Door mark A unique reference for every opening, used on drawings and schedules
Location and use Where the door sits and what it protects
Rating Standard, issue, class and certification scheme
Leaf and frame Construction, size, handing and frame section
Hardware set The H-reference covering every component
Other performances Fire, acoustic, access control and finish

What the specification does not cover

A specification describes the doorset, not the building around it. It does not prove the wall can carry the frame, the floor can take the leaf weight, or the opening is square. Those are survey findings, and a schedule written from drawings alone carries assumptions that only appear on site. Send the survey with the enquiry, and name who measured each opening.

The specification also does not cover what happens after handover. It says nothing about who inspects the door, how often, or what record is kept. A doorset that is never checked drifts out of its tested state: hinges loosen, seals wear, a closer is adjusted by hand. Name the inspection routine in the handover pack, or the rating fades without anyone noticing.

It does not cover the programme either. A doorset ordered late, or changed after manufacture starts, is a doorset built in a rush or built twice. The specification fixes the design; the programme fixes when it is built. Agree both before the order is placed, and record any change in writing with its effect on the test evidence.

It does not cover the people who use the door. A doorset specified for security alone can fail the people who pass through it every day: a leaf too heavy for the staff who open it, a lock that needs two hands, a threshold that trips. Test the daily use against the people who will use it, not against the test standard alone. A doorset that cannot be opened by the people who use it will be propped open, and a propped door is a door that protects nothing.

And it does not cover the rest of the line. A rated door in an unrated wall, beside an unrated window, protects nothing. The specification must name the wall, the frame fixings and the glazing beside the door, because the rating covers the assembly and the opening around it, not the leaf on its own.

Mistakes that weaken a specification

Most failed specifications are decided at the writing stage, not on site. The six checks below catch the errors that appear most often.

  • Naming a rating without the standard and the issue, so the supplier cannot tell LPS 1175 Issue 8.2 (September 2024) from an older issue.
  • Specifying the leaf and leaving the frame, fixings and hardware to be settled later.
  • Adding access control after manufacture, when cable routes and lock cases are already fixed.
  • Changing the finish after the test, where a different coating changes the tested build.
  • Asking for no evidence at order stage, then chasing certificates at handover.
  • Writing one rating for every opening, instead of matching each doorset to its own threat.

A specification that names the standard, the issue, the class, the doorset and the evidence leaves nothing to interpret. For the errors that quietly erase ratings, see the specification mistakes guide, and for the ratings in full, see the LPS 1175 page. Where fire and security meet on one doorset, see the dual certification guide, and for keeping the rating valid after handover, see keeping an LPS 1175 rating valid.

Frequently asked questions

Should I name a manufacturer in the specification?

You do not have to. A performance specification that names the standard, issue, rating and scheme lets any capable supplier bid, which keeps pricing honest. If you do name one, add “or equivalent approved” and define exactly what equivalent must evidence.

Why does the issue of the standard matter?

Because ratings and test methods change between issues. LPS 1175 Issue 8 uses the A1 to H20 classes that replaced the old SR1 to SR8 scale. A clause without an issue can be answered with evidence to a superseded version, which may not meet the client’s requirement.

Who coordinates access control with the door?

Name one party in the specification. Electric hardware affects the leaf construction, the power supply and the fire strategy, so it cannot be left to coordinate on site. Give the door supplier the device schedule before manufacture and make one contractor own the interface.

How do I specify fire and security on one door?

Require evidence for both performances on the same assembly, and say so in one clause. A leaf tested for security and a different leaf tested for fire do not make a combined doorset. Ask for the test evidence covering the exact configuration before the order is placed.

What should the door schedule include?

Every opening gets a row: door mark, location, rating with standard and issue, leaf and frame details, hardware set reference, fire and acoustic needs, access control and finish. The schedule is the single source of truth that the drawings, the order and the installation all follow.

Before you ask for a quote, run through the security door enquiry checklist so each opening arrives with its size, use and rating.

Writing a door schedule?Send it through the quote form and we will check the ratings, hardware sets and interfaces before you go to tender.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.