Certified physical security

ArxBridge
Installer checking the seal of navy steel fire-rated doors in a UK office corridor

ArxBridge

Fire Door Regulations for Offices Explained

Office fire doors under the Fire Safety Order 2005: leased floors, landlord and tenant duties, open-plan escape routes, stair cores and fit-outs.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

An office is a building where the same people come back every day. A fire door in an office has to hold a fire back long enough for a whole floor of people to leave at once, and it has to do it on a day when the doors have already opened and closed hundreds of times. That is why the rules for office fire doors are not the same as the rules for a school, a hospital or a shop, even though the door itself looks much the same.

The law is the Regulatory Reform (Fire Safety) Order 2005, which names a responsible person for the premises and puts the duty to assess the fire risk and keep the doors working on that person. For a single-tenant office the responsible person is usually the employer who occupies the building. For a multi-let office the landlord is the responsible person for the common parts, the stair cores and the lift lobbies, and each tenant has its own responsible person for the doors inside its own demise. Our fire door regulations for commercial buildings guide covers the Order and Approved Document B in full, our fire door regulations for schools guide covers the same Order from the school side, our fire door regulations for hospitals guide covers it from the hospital side, where the users are patients who cannot move on their own, and our fire door regulations for retail guide covers it from the shop side, where strangers walk in all day.

The two periods an office meets most often are FD30 and FD60. They are fire resistance periods tested to EN 1634-1, and the number is the minutes the doorset held its rating in the furnace test. FD30 holds for 30 minutes and FD60 for 60 minutes. The letters in front of the number say what the door holds back: E for integrity, EW for integrity with a limit on radiated heat, and EI for integrity with insulation. A door marked FD30S also carries a smoke rating. Our fire ratings page sets out the three letters and the periods behind them.

  • Fire Safety Order 2005The law that names a responsible person for the premises
  • FD30 and FD60Fire resistance periods tested to EN 1634-1
  • FD30S30 minutes integrity plus smoke control
  • BS EN 1154 closersSized to the leaf, minimum EN 3 on a fire door

The Order names a responsible person for every office floor

The Regulatory Reform (Fire Safety) Order 2005 applies to non-domestic premises, and an office is one of them. Article 3 defines the responsible person: in a workplace, the employer, to the extent the workplace is under their control; elsewhere, the person in control of the premises in connection with a trade, business or undertaking, or the owner. In multi-let buildings the duties can be shared, and the law requires co-operation between the parties who hold them.

Three duties matter for fire doors. Article 9 requires a suitable and sufficient fire risk assessment, reviewed regularly and after significant change, with the findings recorded. The assessment decides where fire doors go: escape routes, compartment lines and higher risk rooms. Article 14 requires emergency routes and exits to be kept usable. Article 17 requires a suitable maintenance system so doors stay in working order and good repair. The duty is not a one-off task.

In a single-tenant office the position is simple: the employer who occupies the building is the responsible person for the whole building, entrance doors, office floors, stair cores and plant rooms included. In a multi-let office the position is shared. The landlord or managing agent is the responsible person for the common parts, and each tenant is the responsible person for the doors inside its own demise. The boundary between the two must be written down, because a door that both sides think the other side looks after is a door nobody looks after.

A lease can set out who pays for the work, but it cannot remove the duty from the person the Order names. A tenant who signs a lease that says the landlord maintains the doors should still check that the doors are maintained, and a landlord who lets a floor should still check that the tenant’s doors close and latch. The fire risk assessment is the document that names the doors, the ratings and the checks, and it should be read whenever the office changes hands or the layout changes.

Landlord and tenant: who owns which office door

The common parts of an office building are the parts more than one tenant uses: the entrance doors, the stair cores, the lift lobbies, the corridors that serve more than one floor, the risers and the plant rooms.

Inside its own demise, the tenant owns the doors: the office floor doors, the meeting room doors, the doors between departments, the doors to its own store rooms and the doors to its own server rooms. A tenant who fits out a floor with new partitions and new doors has created new fire doors, and the tenant’s assessment must be reviewed to cover them.

Lift lobby doors sit on the boundary and matter more than most doors in the building. The lift lobby is the route from the office floor to the stair, and its doors must hold smoke back so the stair stays clear while a whole floor leaves.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Open-plan floors: where the fire lines run

An open-plan floor is one large space, and its fire lines run through it rather than around it. The fire strategy draws the lines: cross-corridor doors divide the floor into compartments, doors to the stair cores protect the way down, and doors to plant rooms and server rooms close off the higher risk rooms. The fire risk assessment names those lines, and every door on them carries the rating the strategy gives it.

FD30 is the workhorse of an office floor. Office floor doors, meeting room doors, store doors and doors between departments commonly carry FD30, which means the doorset held its rating for 30 minutes in the test to EN 1634-1. FD60 belongs where the fire strategy asks for a longer hold. Compartment walls, doors to stair cores and doors that protect a long escape route commonly carry FD60, because the people behind them need more time, and plant rooms and server rooms commonly carry FD60 too, because the fire risk inside them is higher than on the open floor.

The letter matters as much as the number. An EI door adds insulation, so the temperature rise on the safe side is limited and the door can be touched. Escape routes and corridors where staff pass close to the door usually need EI, because people escape past the door and may need to put a hand on it.

The wall around the door matters as much as the door itself. A rated doorset set into an unrated partition leaves the compartment line only as strong as the partition, and no fire door regulation will catch that on its own.

Escape from an open-plan floor: corridors, stair cores and the lift lobby

In an office the whole floor leaves at once. At the alarm, staff stand up from their desks and walk the same corridors to the same stairs, and the route must stay clear from the back of the floor to the stair door. Desks pushed into the corridor, boxes left by the lifts and deliveries stacked in the gangway all narrow the route at the very point it matters most.

Stair core doors commonly carry FD60, because the stair must hold while floors above move down through it. Panic hardware to BS EN 1125 belongs on escape doors where people leave under pressure: a bar across the leaf that opens the door when it is pushed, covering at least 60 percent of the leaf width, for escape doors where more than 60 people may need to leave at once. The door must open in the direction of escape, and it must open in one action without a key, a code or a card.

Lifts are not escape routes, and the lift lobby doors are the reason the stair stays usable. When the alarm sounds, the lobby doors must hold smoke back so the people waiting at the stair are not standing in smoke. A door marked FD30S carries 30 minutes of integrity plus smoke control, tested to BS EN 1634-3, and the S must be named in the specification where the fire strategy needs it. Our smoke control doors guide sets out the smoke classes, Sa and S200, and where each one belongs.

Locked doors must release on alarm. An office floor that is locked for security, a server room that is locked for safety and a records room that is locked for privacy all need the same answer: the lock must release when the fire alarm sounds, so nobody is trapped behind a door they cannot open. Our dual certification guide works through how fire and security sit on one doorset.

Meeting rooms and glazed partitions: glass that must hold fire

Meeting rooms need glass for light and sight, and the glass must be part of the tested doorset. A pane of glass fitted into a fire door after the test is a change to the tested assembly, and the rating does not cover it.

Glazed partitions carry the same rule as the doors in them. A fire rated partition needs fire rated glass as part of the tested assembly, with the frame, the beads and the seals named in the same evidence. Our fire rated windows guide sets out how glass, frame and beads are tested together, and the same discipline applies to a glazed office partition.

Meeting room doors often stand open. Staff leave them open for air, for movement and for the next meeting, and a door that stands open all day is a door that will stand open in a fire unless it has a hold-open device to BS EN 1155 that releases the door when the alarm sounds. A wedge, a chair or a hook on the wall has no such release, and a door held open by one of those will stand open in a fire.

Refurbishment and fit-out: the doors a new layout creates

Offices change more often than any other commercial building. A new tenant takes a floor, a growing team takes another floor, a fit-out moves the meeting rooms and the partitions, and every change creates new doors and moves the compartment lines. Article 9 of the Order requires the fire risk assessment to be reviewed after significant change, and a fit-out is a significant change.

Where the Order governs buildings in use, the Building Regulations 2010 govern building work. Approved Document B is the official guidance supporting the fire safety requirements of the Building Regulations, and Volume 2 covers buildings other than dwellings, the one that matters for commercial projects in England. Approved Document B is guidance, not law. The 2005 Order is what an occupied building must comply with.

At handover, note regulation 38 of the Building Regulations 2010. Where Part B applies, the person carrying out the work must give fire safety information to the responsible person by completion or first occupation, whichever is earlier. Ask for them and file them where the next responsible person will find them.

The Fire Safety (England) Regulations 2022 do not apply to offices. They apply in England only, and their fire door duties in regulation 10 cover a defined group of buildings, not commercial premises in general: buildings with two or more sets of domestic premises, with fixed schedules of best-endeavours checks of flat entrance doors at least every 12 months and checks of communal area doors at least every 3 months, for buildings above 11 metres. The frequency comes from the fire risk assessment and the article 17 maintenance system.

Closers, seals and the parts that fail first in an office

The closer is the part that fails most often, and in an office it fails under the hardest use in any building. A closer sized to BS EN 1154 for the leaf weight will close the leaf and hold the latch every time, but a closer that has been adjusted by hand, a closer with a leaking body, or a closer taken off because it was too stiff, will leave the leaf standing open. Our fire door closers guide sets out the power sizes in BS EN 1154 and how to read them.

Opening force is an office problem as much as a fire problem. A door must open with less than 30 N in the first 30 degrees and less than 22.5 N beyond that, under BS 8300 and Approved Document M, because staff push trolleys, wheelchairs and delivery cages through these doors all day. Hinges to BS EN 1935 carry the leaf, grade 13 or grade 14, and a hinge that has dropped lets the leaf sag, so the closer cannot close it squarely.

Seals and gaps are the small parts that decide the rating. A 4 mm gap around the leaf is the usual limit, and a doorset fitted with wider gaps has lost the performance the certificate describes. Intumescent seals close the gap in a fire, expanding at roughly 200 to 250 degrees, and smoke seals close it against cold smoke. Our fire door hardware guide sets out the hardware set, hinges, seals and latches included, and how each part is graded.

Card readers and maglocks: the access control that must still release

An office door often carries a card reader on the outside and a release button on the inside, and the two must work together. The reader keeps strangers out during the day, and the release must let everyone out in one action when the alarm sounds. A door that needs a card to open from the inside has no place on an escape route, and a door that needs a code has the same fault.

A maglock holds the leaf shut with a magnet, and it must release when the power fails or the alarm sounds. Test the release with the power off, not with the power on, because a lock that only releases on power has failed the test that matters. The release button should sit where a person in a crowd can reach it without looking, and it should work for a person carrying a box, a person in a wheelchair and a person who has never used the door before.

Keep the access control and the fire hardware on one schedule. The reader, the maglock, the closer, the hinges and the seals belong on the same line as the leaf and the frame, so a change to one part is checked against the rest. A closer changed for a stronger model can push the opening force past 30 N in the first 30 degrees, and a maglock fitted to a door that was never tested with one breaks the tested construction. The power sizes in BS EN 1154 are set out in our fire door closers guide.

When the floor plan moves: keeping the door schedule honest

An office floor is rarely the same floor a year later. Desks move, partitions move, a meeting room becomes two rooms, and each move changes the escape route the doors serve. A door that opened onto a corridor can open onto a dead end after a refit, and a door that served 40 people can serve 90 after a layout change. The schedule should be checked whenever the plan changes, not only when the doors are replaced.

The check is a walk, not a paper exercise. Walk the escape route from the deepest part of the floor to the final exit, and note every door on that route, the direction it opens and the hardware it carries. Check that the closer still brings the leaf back and holds the latch, that the seals are whole and the gaps are inside 4 mm, and that no door is wedged open for convenience. A wedged door will stand open in a fire, and a door that stands open cannot hold fire or smoke.

A door that serves more than 60 people needs panic hardware to BS EN 1125, with a bar across the leaf covering at least 60 percent of the leaf width. A bar that covers less than 60 percent of the leaf can be missed by a person in a crowd. Under BS 8300 and Approved Document M, a door must open with less than 30 N in the first 30 degrees and less than 22.5 N beyond that. The checks that catch a failing leaf before it matters are in our fire door inspection checklist, and our security turnstiles guide works through readers, fobs and biometrics and how the lane is wired into the access system.

Part What to look for When
Closer Leaf closes squarely and holds the latch Every month
Seals and gaps 4 mm gap, seals whole and fixed Every month
Maglock and release Releases with the power off Every month
Escape route No wedge, direction of escape clear After every refit

Ask for the test report and the classification with the doorset, and keep both with the door schedule, so the next responsible person can find the evidence without asking.

Ordering office fire doors: one specification, one set of evidence

Ordering fire doors for an office is a specification exercise, not a shopping exercise. The order should name the rating in full, FD30 or FD60 with the letter and the smoke rating where the strategy asks for it, and it should name the leaf, the frame, the glass, the beads, the seals and the hardware as one doorset. Our how to specify security doors guide covers the same discipline for rated security doors, and our types of security doors guide sets out the range of doors an office may need.

The security side needs its own evidence where the door must also resist attack. A server room door must hold fire and resist forced entry, and the two jobs need two sets of evidence on one assembly: a fire classification to EN 1634-1 and a forced entry rating to LPS 1175 or PAS 24. A steel leaf is strong, but strength is not a security rating, and a door rated FD60 can still fail a forced entry test. Our fire rated steel doors page covers the steel leaf that carries both jobs most often, and our server room doors guide covers the room that needs both jobs at once.

Finally, order the evidence with the doors. The test report, the classification and the hardware schedule should arrive with the doorset, and the handover pack should name the inspection routine the office will follow. Our fire door inspection checklist gives the checks that catch a failing leaf before it matters.

Door position Period What it must do What to check
Office floor door FD30 Let staff in and out, close and latch after every use Closer, latch, hold-open release
Cross-corridor door FD30 or FD60 Hold the corridor as a compartment line Gaps, seals, hold-open release
Stair core door FD60 Protect the stair while floors above move down Smoke seals, closer, latch
Lift lobby door FD30S Hold smoke out of the stair and the lobby Smoke seals, closer, 4 mm gaps
Plant and server room door FD60 Hold a higher-risk fire inside its own compartment Seals, gaps, self-closing

In an office, a fire door wedged open for a delivery is a door that cannot protect the people on the floor behind it.

Who is responsible for fire doors in a rented office?

The Regulatory Reform (Fire Safety) Order 2005 names a responsible person for the premises. In a workplace it is the employer, to the extent the workplace is under their control. In multi-let buildings the landlord or managing agent may hold duties for the common parts, and the law requires co-operation between the parties. A lease cannot remove the statutory duty from the person the Order names.

How often must fire doors be checked in an office?

The Order sets no fixed interval. Article 17 requires a suitable maintenance system, and the fire risk assessment sets the frequency. Record every check. The 3-month and 12-month schedules in the 2022 Regulations apply to residential blocks in England above 11 metres, and they do not extend to offices.

Do the Fire Safety (England) Regulations 2022 apply to my office?

No. They apply in England only, and regulation 10 covers buildings with two or more sets of domestic premises. Commercial premises follow the 2005 Order, and the check frequency comes from the fire risk assessment, not from a fixed statutory interval.

What is the difference between FD30 and FD60 in an office?

FD30 and FD60 are fire resistance periods tested to EN 1634-1, and the number is the minutes the doorset holds its rating in the furnace test. FD30 holds for 30 minutes and FD60 for 60 minutes. Office floor and meeting room doors commonly carry FD30, while stair core doors, plant rooms and server rooms commonly carry FD60, because the people and the contents behind them need more time. The fire strategy names the period for each opening.

Can an office fire door be held open?

Only with a hold-open device to BS EN 1155 that releases the door when the alarm sounds. A wedge, a chair or a hook on the wall has no such release, and a door held open by one of those will stand open in a fire. If a meeting room door needs to stand open, fit the right hold-open device and the right closer, so the door can stay open when the office needs it open and still close when it matters.

Specifying fire doors for an office?Send the door schedule and the fire strategy for a tested doorset quotation.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.