RF shielding standards and how shielded rooms are tested

RF shielding standards explained for UK buyers: IEEE 299 and EN 50147-1 test methods, how shielded rooms are tested, and what a test report must show.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Two standards define how RF shielded rooms are tested: IEEE 299 and EN 50147-1. Both are measurement methods, not pass marks. They describe how to measure shielding effectiveness in dB across a frequency range, so a buyer can compare rooms and check a room still performs after it is built.

  • IEEE 299Measures shielding effectiveness, 9 kHz to 18 GHz
  • EN 50147-1European shield attenuation method, 9 kHz to 40 GHz
  • BS EN 50147-1:1997The UK adoption of the European method
  • Results in dBAttenuation across a frequency range, limits set by the owner

The two standards that measure shielding effectiveness

IEEE 299 is the IEEE standard method for measuring the effectiveness of electromagnetic shielding enclosures. The 2006 edition sets uniform test procedures covering 9 kHz to 18 GHz, with the option to extend the range down to 50 Hz and up to 100 GHz. The procedures apply to enclosures whose smallest linear dimension is 2.0 m or more; smaller enclosures use separate methods. IEEE’s own overview describes the standard as the uniform method for room level shielding measurement, with shielding effectiveness expressed in dB as the ratio of field strength without the shield to field strength with the shield in place.

EN 50147-1 is the European method. Published by CENELEC, its full title is “Anechoic chambers, Part 1: Shield attenuation measurement”. Its object is to establish a common measurement procedure for validating the shielding effectiveness of shielded enclosures, chambers and rooms, across the frequency range 9 kHz to 40 GHz. In the UK it was adopted as BS EN 50147-1:1997, the English language version prepared by BSI Technical Committee GEL/210.

The point both standards share matters more than their differences. Neither one grades the room. IEEE 299 recommends a set of test frequencies and describes how to measure, but the owner of the enclosure provides the frequencies to test and the shielding effectiveness limits for pass or fail. EN 50147-1 likewise provides the common procedure and leaves the expected attenuation levels to the enclosure specification.

Standard Published by What it covers Frequency range
IEEE 299 IEEE Uniform procedures for measuring the effectiveness of electromagnetic shielding enclosures 9 kHz to 18 GHz, extendable
EN 50147-1 CENELEC; BS EN 50147-1:1997 in the UK Common procedure for validating shielding effectiveness of shielded enclosures 9 kHz to 40 GHz

How a shielded room test is run

The principle is the same under both standards. A signal is measured without the shield, then with the shield in place, and the difference is the shielding effectiveness. Shielding effectiveness is defined as the ratio of the signal received from an unshielded transmitter to the signal received inside the shield when the shield sits between the transmitting antenna and the receiving antenna. An RF shielded room is specified by its attenuation in dB over a frequency range, so the test must cover the frequencies the room is sold to protect.

  1. Measure the reference. With no shield between the antennas, record the signal at each agreed frequency. This is the baseline the room is judged against, and it sets the dynamic range of the whole measurement.
  2. Place the shield in the path. Repeat the measurement with the transmitter outside the room and the receiver inside, so the signal must cross the shielded boundary. The same generator level is used as in the reference measurement.
  3. Work through the frequencies. Repeat both measurements at every frequency in the test plan, from the low kilohertz range up through the gigahertz range named in the specification. Both standards use recommended sets of test frequencies that give high confidence in the result.
  4. Move the antennas. Test several positions around the room: walls, floor, ceiling, door seams and every penetration for cables, vents and pipes. The evaluation takes the lowest performance found across the measured locations, because leakage decides the room’s real rating.
  5. Compare against the limits. The measured attenuation in dB at each frequency is set against the pass or fail limits the owner named before the test. A room passes because it met its own specification, not because a standard stamped it.

The room is tested after installation is finished, with all panels, doors, vents and filters in place. Testing a half built room proves nothing, because every missing panel is a hole the test will not see twice.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

What a test report should show

A report that only says “tested to IEEE 299” proves nothing. Ask for the full report and check it contains the standard and edition used, the exact frequencies tested, the measured shielding effectiveness in dB at each frequency, the positions tested named one by one (which wall, the door seam, each penetration), the equipment used and its calibration, the reference level and the noise floor so you can see the measurement had enough dynamic range, the pass or fail limits applied and who set them, and the date and who carried out the test.

Keep the report with the room’s records. When the room is changed or retested, the new report is compared against this baseline, and any fall in attenuation points to what moved or wore. Independent verification of a room is arranged through our testing and surveys service, which follows the same measurement methods described on this page.

The RF door is usually the weakest point

A shielded room is a continuous conductive shell, and the door is the one part of the shell that moves. Hinges, latches and contact strips work every time the door opens, and every cycle wears the contact surfaces slightly. The measurement methods expect continuous electrical contact between adjacent panels, including doors, which is exactly what a hard used door struggles to keep.

This is why testers give the door extra attention and why the door reading is often the room’s lowest. The evaluation takes the lowest performance across the measured locations, so one worn contact strip can decide the result for the whole room. A door that is opened dozens of times a day needs a heavier duty contact design than a door that opens once a week, and the specification should say which it is.

Plan maintenance around the door. Inspect contact strips and gaskets, keep contact surfaces clean and free of paint, and replace worn seals before they fail a test. A planned maintenance routine costs far less than an emergency retest after a failed one.

What the standards do not do

Neither IEEE 299 nor EN 50147-1 tells you what attenuation a room must reach. They are measurement methods, not product specifications and not law. If a supplier answers “tested to IEEE 299” when you ask for the target attenuation, you have not been given an answer.

The limits come from your specification: the frequencies that matter for your work and the dB figure you need at each one. An EMC test laboratory, an MRI suite and a secure meeting room need different numbers, which is why both standards leave the limits to the owner. MRI suites are a good example of why the application sets the target: the room needs RF shielding to protect the scan, and often magnetic shielding too, which is a different thing measured in a different way. Our guide to MRI and RF shielded rooms explains that split.

EMP protection is a related but different need. A room that must ride out an electromagnetic pulse needs filtered power and signal entries as well as a conductive shell, so an ordinary RF shielding specification does not cover it. See our EMP shielding page for that requirement.

When to retest a shielded room

A test report describes the room on the day it was tested. Anything that changes the conductive shell can change the result: a new cable penetration, a replaced door gasket, building work next to the room, or the room being moved or rebuilt. Retest after any of those changes, before the room goes back into critical use.

Put the room on a regular schedule the owner sets. Rooms that protect regulated work, such as MRI suites in healthcare buildings and EMC test laboratories, are usually retested on a fixed cycle agreed with the facility’s quality or compliance team. Neither standard sets that interval; the facility does.

Compare each new report with the original baseline. A slow fall in the door reading across two reports is the normal early warning that the contact strips are wearing out, and it is cheaper to replace them on a plan than after a failure.

What to put in a specification

Write the specification before the room is built or bought, and put six items in it. Name the standard to test to, IEEE 299 or EN 50147-1, with the edition. State the frequency range and the exact test frequencies. Set the target attenuation in dB at each frequency. List the test positions, including the door seams and every penetration. Define the contents of the test report. Require a retest after any change to the room.

Send the same specification to every bidder. Two rooms tested to different frequencies and different limits cannot be compared, and a common specification is what makes competing quotes comparable. For help choosing between a simple enclosure and a fully specified room, read our Faraday cage vs RF shielded room guide and the RF shielding product page, then browse the wider guides hub for related standards.

The standard measures; the specification grades. Name IEEE 299 or EN 50147-1 for the method, then write your own frequencies and dB limits. A test without limits is a measurement, not a pass.

Which standard should I name, IEEE 299 or EN 50147-1?

IEEE 299 is the US published method, widely used internationally, covering 9 kHz to 18 GHz. EN 50147-1 is the European method, covering 9 kHz to 40 GHz, adopted in the UK as BS EN 50147-1:1997. For UK procurement the BS EN version is the natural reference, but either works if you name it in the specification.

Does IEEE 299 say what attenuation a room must reach?

No. The standard provides the measurement procedure and recommends test frequencies, but the owner of the enclosure provides the frequencies to test and the shielding effectiveness limits for pass or fail. A report that shows measurements with no limits has no pass or fail to read from it.

Can I check a room myself with a mobile phone or a handheld radio?

A phone’s signal bars are not a measurement and cannot prove a room meets a specification. A quick check can reveal an obvious leak, such as a door left ajar, but it cannot replace a calibrated test with a reference measurement, agreed frequencies and a written report. If the room matters, have it tested properly.

Why does the door usually give the lowest reading?

The door is the only part of the conductive shell that moves. Hinges, latches and contact strips wear with every cycle, and the test evaluates the lowest performance across all measured locations, so the door often decides the room’s result. Regular inspection of the door seals is the cheapest way to protect the rating.

How often should a shielded room be retested?

Neither standard sets a retest interval. Retest after any change to the room, such as a new penetration or a replaced gasket, and put the room on a schedule the owner sets. Rooms used for regulated work, such as MRI suites or EMC testing, are usually retested on a cycle agreed with the facility’s quality team.

Do the floor and ceiling need testing too?

Yes. Test positions should cover all six faces of the room plus the door seams and every penetration. Leakage finds any gap, and the evaluation takes the lowest reading, so an untested face is an unknown risk.

Need a shielded room tested or specified?Tell us the frequencies and attenuation you need and we will advise on the right test and specification.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.