Golden Thread Records for Fire Doors
The golden thread is the digital record of a building's safety information. What it must hold for fire doors, who keeps it, and what passes at handover.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
The golden thread is the digital record of a building’s safety information, kept from design through construction and into occupation, and for fire doors it is the record that proves each door is the one the fire strategy names, fitted the way it was tested.
- Digital recordKept electronically, not on paper files
- Single source of truthOne record every duty holder works from
- Whole lifeFrom design to occupation and beyond
- Shared on requestTo the regulator, other accountable persons and residents
What the golden thread is
The golden thread is the name the government gives to the information about a building that must be kept as a digital record. It must be kept by a client, principal designer or principal contractor on a project that involves a higher-risk building, and by an accountable person or principal accountable person for a high-rise residential building. Keeping it helps the duty holder comply with the law and manage building safety. The government’s golden thread guidance sets out the duties in full.
A higher-risk building has at least 7 storeys or is at least 18 metres high, and has at least 2 residential units or is a hospital or a care home. A higher-risk building with at least 2 residential units must be registered with the regulator before people live there. The thread is not a single document and not a folder of certificates. It is a record-keeping system that holds the information in a form people can use, secure from unauthorised access, available when needed, and written in plain English.
Who keeps it, and when
During design and construction the client keeps the information, the principal designer captures and keeps the design information up to date, and the principal contractor uses the client’s record-keeping system. When the building is occupied, the accountable persons take the record over and keep it for as long as the building stands.
At the end of construction the client must demonstrate that the information has been given to the principal accountable person or the accountable person for a high-rise residential building, and to the responsible person for any non-residential parts. The person who receives it must confirm receipt and that it is in a format they can use. A thread that arrives as a pile of unlabelled files has not been handed over in any useful sense.
| Phase | Who keeps it | Fire door records |
|---|---|---|
| Design and construction | Client, principal designer, principal contractor | Drawings, fire and emergency file, change control log |
| Handover | Client to accountable person | All approval and completion information, with access |
| Occupation | Accountable person, principal accountable person | Safety case report, checks, repairs, replacements |
The record-keeping system should have version control so users can see any changes. Our fire door remediation programme guide sets out how a housing provider builds a door-by-door record a golden thread can carry forward.
What the client must record during design and construction
As the client, the duty is to keep information that describes the building and shows how it complies with the building regulations, and how the work will be managed so the building that is built is the building that was set out. The information must be shared with every designer and contractor on the project, and the record-keeping system will hold the documents the building control approval application needs.
For fire doors, the design record is where the rating is fixed. The fire and emergency file, often called the fire strategy, must show how the work provides adequate means of escape and warning, inhibits fire spread, and gives the fire service reasonable access and facilities. The doors on those plans are the doors the golden thread must be able to prove: each opening, the rating it carries, and the evidence behind it. Our fire door certification guide covers the certificate and test evidence a doorset should show.
A golden thread is only as strong as its weakest entry. One fire door with no certificate, no label and no fitting record is a gap the next owner and the regulator will fall through.
Handover: what passes to the accountable person
When the building work is finished, the client must apply for a completion certificate, and demonstrate that the information about the building has been passed on to the person who will hold it in occupation, and to the responsible person for non-residential parts. The information handed over includes all of the information used to apply for building control approval, the completion certificate itself, access and control of the building information, and the relevant fire safety information for the responsible person.
The approval information includes the drawings, the compliance statement and the fire and emergency file, and the completion information adds the as-built record: what was actually fitted, where, and with what evidence. If the doors fitted differ from the doors approved, the handover must show the controlled change that approved the difference, with the evidence behind it.
What the accountable person keeps in occupation
In occupation, both the accountable person and the principal accountable person must keep information about the building and manage the record-keeping system that stores it, including the health and safety file, the safety case report, the residents’ engagement strategy and the mandatory occurrence reporting system. Where they have them, they should also keep information about refurbishments, information from previous owners including inspection reports and maintenance records, and what standard the building was built to.
That information helps the accountable person assess and manage building safety risks for the parts they are responsible for, and it supports the safety case report. The accountable person must be able to show how they assess and manage building safety risks, which include the spread of fire and structural failure, and understand the fire strategy for the parts they are responsible for. Our fire door maintenance guide covers the checks that keep the rating honest over the years.
Fire doors in the thread: the records that matter
For each fire door, the thread should hold the doorset certificate, the label on the leaf, and the evidence behind the rating. It should hold the record of the fitting, and the record of every check, repair and replacement since, door by door, with the date and the finding. The government’s safety case report guidance says the report should show that fire doors are in place in necessary locations, and provide evidence that fire doors and door closers are regularly inspected.
Where an accountable person carries out a fire door survey, the safety case report should include the surveyor’s competence, the significant findings, and the accountable person’s response. A survey that finds a closer that no longer shuts a stair door, with no recorded response and no re-inspection, is a thread with a hole in it. Our fire door inspection checklist lists the points to check on a single door.
Sharing the thread, and keeping it up to date
The information must be provided on request to the Building Safety Regulator, to other accountable persons, and to residents or owners of residential units in the building. A resident who asks what the fire doors in their stair are rated for should be able to get an answer from the record, not from memory.
Every change to a door, every repair, every replacement and every survey finding should be recorded when it happens, with version control so users can see what changed and when. The system must stay secure, available for authorised access, and compliant with data protection law. A thread that is accurate on the day of handover and out of date a year later is no longer a single source of truth. Our fire compartmentation guide sets out how doors, walls and seals work together to hold fire back.
Is the golden thread a single document?
No. It is a digital record-keeping system that holds the building’s safety information, with version control so users can see changes. It holds the health and safety file and the safety case report, plus the residents’ engagement strategy and the system for mandatory occurrence reporting.
Who can ask to see the golden thread?
The Building Safety Regulator, other accountable persons for the building, and residents or owners of residential units can ask for the information on request. The accountable person must provide it in a format the person asking can use.
What happens to the thread when the building changes hands?
The information passes to the new accountable person, who must confirm they have it and can use it. A thread that arrives incomplete leaves the new accountable person unable to show how the building’s fire doors were specified or tested.
Does every fire door need its own record?
Yes, in practice. The thread should hold the certificate, label and test evidence for each doorset, the fitting record, and a dated record of every check, repair and replacement. The safety case guidance asks for evidence that fire doors and closers are regularly inspected.
What if the old records are missing?
Say so in the record. The safety case guidance says that where information has not been found, the report should explain what was done to try and find it.
Contact us for a free quote
Related
More in guides for specifiers