Certified physical security

ArxBridge
Steel door sample in a security test frame with an assessor in a UK test laboratory

ArxBridge

Control Room Doors

Control room doors: rated doorsets for operations and monitoring rooms, with access control, fire proof, glazing and one schedule for the whole suite.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

A control room door guards the people who watch the building. Behind it sit the screens, the radios and the staff who answer the alarm, and a door that fails on either side leaves the room open to the wrong person, or shuts the right person out when the alarm sounds.

The order starts with the room, not with the leaf. A monitoring room that runs through the night asks for a different door from a plant room that holds the servers, and a corridor door that staff pass a hundred times a day asks for a different lock from the door on the room where the keys are kept.

One list should hold every door in the suite, with each one named plainly, so the right door lands on the right opening. The server room doors guide covers the doors on the rooms that hold the machines, and the data centre physical security by zone guide sets out doors zone by zone in a building that must stay controlled.

  • LPS 1175 B3 / C5 / D10Forced entry ratings, three, five and ten minutes
  • FD30 / FD60Fire resistance periods tested to EN 1634-1
  • TS 007 3-starCylinder and handle sets
  • BS EN 1125Panic hardware for escape routes

Where a control room puts its doors: the suite, the plant and the corridor

The operations room is the heart of the suite, where staff watch the screens and take the calls. Its door must open for the duty team and stay shut for everyone else, because the screens behind it show the whole building, and a stranger at the door can see what the room is watching.

Behind the operations room sit the plant rooms, the server rooms and the stores that feed the building. The doors on those rooms take a higher rating than the corridor doors, because the equipment behind them is worth more than the corridor, and the rating on the order should match what the room holds.

The corridor doors link the suite to the rest of the building, and they must take the daily traffic without failing. A door that is opened a hundred times a day needs hinges and a closer chosen for that duty, and the data centres sector page sets out the buildings these doors guard.

The door that guards the operations room: rating the leaf by the threat

Forced entry is proved to LPS 1175, with B3 holding three minutes against category B tools, C5 holding five minutes against category C tools and D10 holding ten minutes against category D tools, all under Issue 8.2, dated September 2024. The rating on the order should match the value of what the room holds, not the door the catalogue shows first.

A control room that guards a whole estate takes a higher grade than a room that watches one floor, because the threat follows the building, not the door. The grades in full are set out on our LPS 1175 page.

Where the room empties at night, LPS 2081 adds a stealth rating, with SRA holding one minute and SRB holding three minutes against an attack that must not be heard. The keeping an LPS 1175 rating valid guide sets out what breaks a rating once the door is fitted.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Access control and the audit trail: who passed, and when

Give the control room a card or a fob, not a key. A fob can be stopped the day a member of staff leaves, while a key that walks out with them stays live until the lock is changed, and the list of who holds each fob belongs on the file beside the door.

Keep the control room on the same access system as the rest of the site, so a single card opens the suite, the plant rooms and the yard, and a card that is stopped dies everywhere at once. Readers, fobs and biometrics in the lane are covered in our security turnstiles guide.

The audit trail matters as much as the lock, because the record shows who opened the door and when. After an incident, the trail is the first thing the duty manager reads, so the system that keeps it belongs on the order beside the reader.

Glazing and vision: seeing the room without opening the door

A vision panel in the control room door lets the duty team see who is outside before the door opens, and a glazed screen beside it lets them watch the corridor without leaving the room. The glass in both must carry its own proof, because an untested pane is a gap in the door, whatever the leaf around it can hold.

The glass in them is proved to EN 356, with the top classes set by axe blows: 30 to 50 for P6B, 51 to 70 for P7B, and 70 or more for P8B. A control room that holds the keys to the building takes a higher class than a corridor door, so the class follows the risk the room faces.

Glazing that must hold fire is proved to EN 1634-1, with FD30 or FD60 naming the period and the letters E, EW or EI naming what the furnace measured. Order the frame, the beads and the fixings on the same line as the glass, so the window that arrives is the one that was tested. Windows that share the wall with the control room take the same proof as the door beside them, and the fire rated windows guide sets out the periods for those windows.

Fire and security on one leaf: the two proofs together

A control room door that must hold fire and resist attack carries two proofs on the same leaf. Fire is proved to EN 1634-1 and forced entry to LPS 1175, and each proof must name the same leaf, frame and hardware, because a test that names only the leaf leaves the frame and the fixings unproved.

Most control room doors carry thirty minutes, while doors on a compartment wall or a room with a heavier fire load carry sixty, and a door on a smoke path takes FD30S, with the seal proved to BS EN 1634-3, to Sa for smoke at room temperature and S200 for smoke at 200 degrees Celsius.

The fire and security doors dual certification guide works through how the two proofs share one leaf. The closer on the door must pull the leaf shut every time, and the fire door closers guide covers the sizes and the fitting, while the fire door hardware guide covers the grades and the parts behind a working fire door.

Sound and the door that must keep the room quiet

A control room runs on talk, on radios and on alarms, so the door must keep the noise of the corridor out and the talk of the room in. A leaf that lets sound through leaves the operators shouting over the corridor, and a door that seals the room keeps the calls clear.

Sound is measured as Rw, the weighted sound reduction index in decibels, and the number on the order should name the quiet the room needs. The whole doorset is tested as one, leaf, frame and seals together, because a leaf that is quiet in a frame that leaks is no quiet door at all.

One doorset can carry three proofs at once, acoustic, fire and security, and each is proved on its own test. A door that must hold fire takes FD30 or FD60 proved to EN 1634-1, and a door that must resist attack takes B3, C5 or D10 proved to LPS 1175, and the order should name all three.

Fail safe on power loss: the door that must still open

The control room door must open when the power goes, because the people inside must be able to leave and the people outside must be able to get in. A lock that needs power to open is no lock at all in a blackout, so the release must work without power as well as with it.

Fail safe means the door releases when the power fails, and fail secure means it stays locked. A control room door that guards people takes fail safe, so no one is held inside when the lights go out, and the release is written into the order beside the reader. Doors that must hold smoke back while people move past them are covered in the smoke control doors guide.

Rooms that fill for an incident need panic hardware to BS EN 1125, a bar across at least 60 percent of the leaf width, because a crowd that cannot open the door in a fire is a crowd held inside. The opening force must stay below 30 N for the first 30 degrees of travel and below 22.5 N beyond, under BS 8300 and Approved Document M, so anyone in the room can push the door open.

One schedule for the whole control suite: every door on one line

Put the order together as one list with a line for every door in the suite, naming the position, the fire period, the forced entry rating, the glazing and the hardware beside each one, so the door that arrives matches the door that was proved.

Read every quote against the list before anything is ordered. Parts left off a quote do not vanish; they turn up later, fitted round a door that is already in use, at a higher cost than ordering them with the door. The security door cost factors guide works through what each step up the scale adds, and the how to specify security doors guide runs through the same discipline column by column.

Put the test reports in the file with the doors on the day they arrive, so the proof stays with the leaf it belongs to. The fire door inspection checklist names what each round should look for, and the security door maintenance checklist covers the doors that must hold both fire and forced entry.

Position Door Rating What to check
Operations room Glazed security door LPS 1175 C5 Glass, frame, reader
Plant room Solid security door LPS 1175 B3 Lock, hinges, closer
Server room Fire and security door FD30 + B3 Seals, reader, release
Escape route Fire door FD30S Seals, closer, release
Corridor Security door LPS 1175 B3 Closer, seals, latch

A control room door must guard the people who watch the building, so the rating, the credential and the release must all sit on the same schedule.

What rating do control room doors need?

It depends on the room. LPS 1175 grades forced entry, with B3, C5 and D10 naming three, five and ten minutes, and EN 1634-1 proves the fire side, with FD30 or FD60 naming the period.

Who may open a control room door?

Only the staff the system knows. A card or a fob opens the door for the duty team, and a fob that has been stopped must stop working everywhere at once.

Do control room doors need a fire rating?

Yes, where the door guards an escape route or sits in a compartment wall. The proof is to EN 1634-1, leaf, frame and fixings together, and the period follows the fire load behind the door.

What happens to the door when the power goes?

It must still open. A fail safe release lets everyone out without power, and the release is checked on the inspection round.

Who checks control room doors?

The duty manager walks the suite on the routine the site keeps. Each round looks at the closers, the seals, the locks and the readers, and each fault goes on the record the day it is found.

Specifying control room doors for a site?Send the door schedule and the suite plan for a tested door quotation.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.