ArxBridge
Fire Rated Windows Cost Factors
Fire rated window costs: what sets the price of a rated window, from the fire period and the glass to the frame, the fixings, the seals and the wall.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
A fire rated window holds fire back for a set period while letting light through, and the cost of that window follows what it is proved to do. The period, the size, the glass and the frame each add their own line, and a quote that leaves one out is not a cheaper window, only a shorter quote.
The order starts with the opening, not with the pane. A window in a compartment wall faces a different test from a window on an escape route, and a window that must also resist attack faces a different test again, so the rating follows the opening.
Our fire rated windows guide covers the windows themselves, and the fire ratings page sets out the periods and the letters.
- FD30 / FD60Fire resistance periods tested to EN 1634-1
- BS EN 1634-3 Sa / S200Smoke leakage classes
- 4 mmMaximum gap round a fire door leaf
- E / EW / EIIntegrity, radiation and insulation
What a fire rated window is proved to do
A fire rated window is proved by fire test, not by the name on the glass. EN 1634-1 tests the window as fitted, with the pane, the frame, the beads and the fixings in place, and the result is a period and a letter, FD30, FD60 or FD30S, that names what the window held and for how long.
The letters beside the number say what the furnace measured. E names integrity, the window holding flame and hot gas back, EW names integrity with limited radiation, and EI names integrity with insulation, the safe side staying cool enough to touch. The period runs from 30 minutes up to 120, and the opening decides which period the order should name.
A window that must also keep smoke off the route takes FD30S, with a smoke seal proved to BS EN 1634-3, to Sa for smoke at room temperature and S200 for smoke at 200 degrees Celsius. The seal belongs on the schedule beside the period, because a window without it holds fire and lets smoke through.
The period first: FD30, FD60 and the letters beside them
What sits behind a window decides how long it must hold. A window on an escape route usually takes FD30 and a window in a compartment wall usually takes FD60, and the letters beside the number say what the furnace measured: E for integrity, EW for integrity with limited radiation and EI for integrity with insulation, with periods from 30 minutes up to 120.
Each step up the period adds glass, frame and weight to the window. A window proved to EI 60 carries a far heavier build-up than a window proved to E 30, and that weight decides the frame and the fixings that must carry it. A period above the risk adds weight without adding safety, so the period on the order should match the risk the wall faces.
The period is proved on the assembly that will be fitted, so the test report must name the window, the frame and the fixings together. A report that names the glass alone leaves the frame and the fixings unproved, and a window fitted with a different frame from the one tested has no proven rating at all.
The glass and the bead: what holds the pane when the furnace runs
The period a fire rated window takes follows the fire load behind it and the wall it sits in. A window on a compartment wall takes FD30 or FD60, and the period follows the risk, not the size of the window. The letters beside the period name what the window must do: E holds the flames back, EW holds the flames and some of the heat, and EI holds the flames and the heat, all proved to EN 1634-1 for 30 to 120 minutes.
Glass, frame and fixings are proved together, because a pane that holds fire in one frame can fail in another. The glass, the bead, the frame and the fixings travel to the test as one window, and the test report names them all, so a pane swapped into another frame carries no proof on the new window.
Size and shape change what the opening does to the cost, because a wide pane takes thicker glass and a heavier frame than a small one. The opening decides the glass, the frame and the fixings before the quote is written, and a window ordered to a size the test never covered carries no proof at that size.
Added ratings put a second proof on the same window, because a window can be asked to hold forced entry and blast as well as fire. Forced entry is proved to EN 1627, blast to ISO 16933, and each proof sits beside the fire period on the order, so the window that arrives carries every proof the opening needs.
Seals, gaps and the wall: where the rating is won or lost
Seals and gaps hold the rating together, because a window that holds fire at the pane and lets smoke past the frame holds nothing. Intumescent seals expand at around 200 to 250 degrees, and the seal must be the one the test report names, because a seal from another window carries no proof on this one.
Installation and the wall decide where the rating is won or lost, because a window fitted into a wall that cannot hold it fails at the wall, not at the pane. The wall must carry the fire period the window needs, and the fixings that hold the frame to the wall belong on the order beside the window.
Each visit to a fire rated window looks at the glass, the bead, the seals and the gap in turn. A bead that has moved, a seal that has hardened or a gap that has opened is written against the window it belongs to before the visit ends, so the repair is ordered while the fault is still small.
| Position | Window | Period | What to check |
|---|---|---|---|
| Compartment wall | Fire rated window | FD60 | Glass, bead, seals |
| Corridor | Fire rated window | FD30 | Seals, gap, frame |
| Escape route | Fire rated window | FD30S | Seals, gap, glass |
| External wall | Fire rated window | EI 60 | Frame, fixings, seals |
Write the period, the glass and the bead on the same line as every window on the order, so the window that arrives matches the window that was tested. The windows in full are covered in our fire rated windows guide, and the cost of the glass is set out in our fire rated glass cost guide. What each visit should look for is set out in our fire door inspection checklist, and the periods for the shared parts of a public building are set out in our commercial buildings fire door regulations guide.
Glass, frame and fixings: the parts proved together
A rated pane set in a frame that was never tested with it carries no rating, because the proof names the whole assembly as fitted. The glass, the frame, the beads and the fixings go through the test together, and the order names each of them on the same line, so the window that arrives is the window that was tested.
The glass build-up grows with the period and the letters. A pane that must hold EI carries layers that keep the safe side cool, and each layer adds thickness and weight to the pane. The frame must carry that weight, and the wall behind the frame must take the fixings, or the pane holds a rating the opening cannot.
Intumescent seals swell as the heat builds, closing the gap at around 200 to 250 degrees, and the gap round the window stays at 4 mm, because a wider gap lets fire and smoke past the seal. Where the seal is missing, painted over or cut short, the gap it leaves lets fire through whatever the rating on the pane says. How the assembly is proved is explained on the fire rated glazed doors page. Steel and timber frames behave differently in a fire, and the choice is worked through in our steel versus timber fire doors guide.
Size and shape: what the opening does to the cost
A larger pane costs more than a smaller one, and the cost grows faster than the size. More glass means more layers, a heavier frame, stronger fixings and a bigger opening in the wall, so a window twice the size costs more than twice the price of the smaller one.
Several small windows cost more than one large window of the same area, because each window needs its own frame, its own beads and its own fixings. Where the design allows it, one large opening takes cost out of the order.
Shape adds its own cost. A square window cuts from standard stock, while an arched or angled window needs a frame made to the shape, with glass cut to match. The shape belongs on the schedule beside the size.
Added ratings: forced entry, blast and the second proof
A window that must hold fire and resist attack needs a proof for each job. Forced entry is proved to LPS 1175, B3 for three minutes against category B tools, C5 for five minutes against category C tools and D10 for ten minutes against category D tools, under Issue 8.2, dated September 2024, and each proof must name the window that will be fitted.
Impact resistance is proved to EN 356, which grades a pane from P1A to P8B, with the top three classes set by axe blows: 30 to 50 for P6B, 51 to 70 for P7B, and 70 or more for P8B. A window that needs both proofs needs both test reports, one for the fire and one for the axe, and the order should name both classes on the same line.
Blast is a separate proof from fire, and the two should never share a line on the schedule. Under ISO 16933 the EXV class names the charge weight a window must resist at a set distance, and the SB class names the hazard the glazing leaves behind, from A to F. Windows can also be proved under EN 13123 and EN 13124, whose ratings run EPR and EXR, and the bullet-resistant glass cost guide works through what each added proof does to the build.
Seals, gaps and the frame that must hold
Seals and gaps carry the fire rating as much as the pane does. The gap round the window stays at 4 mm, and the intumescent seal swells as the heat builds, closing the gap at around 200 to 250 degrees, so the seal, the gap and the frame all belong on the schedule beside the period.
Smoke needs its own seal beside the fire seal. A window on a smoke path takes FD30S, with the seal proved to BS EN 1634-3, and the duties of a window on a smoke path are covered in our smoke control doors guide. A seal that has come away or been painted over leaves a gap the fire can use, so the inspection round should look for the seal before it looks for anything else.
The frame must hold the pane through the fire, not just through the day. A frame that softens or pulls away from the wall lets the pane fall out of the opening, so the frame material, the beads and the fixings all belong on the same line as the glass. The grades and the parts behind a working fire door are covered in our fire door hardware guide. Sliding fire doors face the same proof on a moving leaf, and our fire rated sliding doors guide covers them.
Installation and the wall: where the rating is won or lost
A rated window fitted into a weak wall has no proven rating, because the wall takes the fixings and the fixings take the frame. The wall behind the window must hold the fixings through the fire, so the wall type, the fixing and the seal around the frame all belong on the schedule beside the window.
Installation is part of the rating, not an afterthought. A window fitted with the wrong fixings, the wrong seal or the wrong gap has not been fitted to the test, and the test report names the fitting it was proved with. The handover pack should name the inspection routine the building will follow, so the record covers the whole life of the windows.
What each check looks for is set out in the fire door inspection checklist, and the security door cost factors guide works through the same discipline for doors. A window that has been painted shut or wedged open goes on the record the day it is found.
Ordering the whole building: one schedule, every window on it
Set the enquiry out as a specification, one line for every window in the building. Each line names the position, the fire period and the letters beside it, the smoke seal where one is needed, the added ratings where the window must also resist attack, and the glass, the frame, the beads, the seals and the fixings as one assembly. A rating that sits on the pane alone is no rating at all: ask for it on the whole window, proved to EN 1634-1.
Compare quotes line by line, period, size, glass, frame, seals and installation, so the cheaper quote is not the one that left a line out. Our fire rated glass cost guide works through what each step up the scale adds to the build, and the ballistic ratings page sets out the scales the order should name where the window must also resist a bullet. The same line-by-line discipline works for shutters, and our roller shutter cost factors guide sets it out.
| Position | Window | Rating | What to check |
|---|---|---|---|
| Compartment wall | Fixed fire window | EI 60 | Frame, fixings, seals |
| Escape route | Fire window with smoke seal | FD30S | Seals, gaps, latch |
| Corridor window | Fire window | FD30 | Glass, frame, beads |
| External window | Fire and security window | EI 30 + B3 | Frame, fixings, lock |
| Plant room window | Fire window | FD60 | Seals, frame, fixings |
A fire rated window is proved as a whole assembly, so the period, the glass, the frame and the wall must all sit on the same schedule.
What sets the cost of a fire rated window?
The period, the size, the glass, the frame, the added ratings and the installation. Each step up the period adds glass, frame and weight, and each added rating needs its own test, so the quote prices the window that will be fitted, not the pane alone.
What does FD30 mean on a window?
Thirty minutes of fire resistance to EN 1634-1, with the letters beside the number naming what the furnace measured: E for integrity, EW for integrity with limited radiation and EI for integrity with insulation.
Can one window hold a fire rating and a security rating?
Yes, where the window is tested for both jobs. Fire is proved to EN 1634-1 and forced entry to LPS 1175 or PAS 24, and each proof must name the window that will be fitted.
Why does the wall matter for a fire rated window?
The wall takes the fixings and the fixings take the frame. A rated window fitted into a wall that cannot hold the fixings has no proven rating, because the proof names the whole assembly as fitted.
How are fire rated windows checked?
On the routine the fire strategy sets, with the record naming the window, the fault and the fix. The inspection looks for seals, gaps, beads and fixings, and a window that has been painted shut or wedged open goes on the record the day it is found.
Get a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.