Shielding testing and surveys: attenuation tests and site surveys for new and existing shielded rooms, with independent test reports across the UK.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
A shielded room is only as good as its last test. Testing and surveys prove that EMP, RF and MRI shielding performs as designed, from the first site survey to the final attenuation test. Surveys find the weak points, tests prove the attenuation, and you receive the evidence in a written report.
- Attenuation surveysRF and EMP rooms measured
- Pre-install surveysDesign based on real conditions
- Post-install verificationPerformance proven by test
- Written test reportsEvidence for the project file
What are shielding testing and surveys
Testing and surveys are the measurement services behind every shielded room: the surveys that inform the design, the checks made while the room is built, and the tests that prove it performs. They apply to EMP shielding, RF shielding and MRI shielded rooms alike, and to rooms built by others that need independent verification. They sit within our shielding range as the proof that the work performs.
A survey records the real conditions: construction type, existing services, penetrations, access and constraints. A test measures the result: attenuation across the specified frequency range, door and seal performance, and the integrity of filtered entries. Both are documented in writing.
Which surveys and tests do you need
Match the service to the stage of the project. A room that skips the early survey usually pays for it in rework later.
| Type | When | What it covers |
|---|---|---|
| Feasibility survey | Before design | Whether the room can be shielded at all |
| Design survey | At design stage | Construction, services and penetrations |
| Installation checks | During the build | Seams, seals and entries as work proceeds |
| Attenuation test | On completion | Measured shielding performance |
| Periodic re-test | After changes | Confirms the room still performs |
How shielding testing works
An attenuation test compares signal levels inside and outside the room across the specified frequency range, using calibrated measurement equipment. The result is reported as attenuation in dB per band, against the target the consultant set. Doors are tested closed, seals are inspected, and filtered entries are checked for correct installation.
Installation checks happen while the room is built: seams and seals are inspected before they are covered by finishes, because a defect found after completion costs far more to fix. The final report records the method, the frequencies tested, the results and any findings, and it forms part of the project file.
The acceptance criteria are agreed before testing begins, so the result is a clear pass or fail against the design target rather than a debate afterwards. Where a room falls short, the report pinpoints the leak, whether a door seal, a penetration or a seam, so the fix is targeted and the re-test is quick.
Test after every change. A new cable, a replaced door seal or a drilled hole can break a shield. Re-test the room after any work that touches its envelope.
Combining testing with other work
Testing applies to every shielded room on a site, whatever its purpose. Rooms with security doors at their entrances are tested with those doors closed, so the door seals form part of the result. Where shielding was installed by another contractor, an independent survey and test gives the site team evidence they can rely on. Our standards hub explains the rating systems behind the products being tested.
Where testing and surveys are used
Government and defence sites test shielded rooms before they enter service. Healthcare estates verify MRI suites before clinical use. Data centres and utilities and energy operators test the rooms that protect critical equipment.
What affects the cost and lead time of testing and surveys
The number of rooms and the frequency range to be tested set the measurement scope. Access arrangements matter: rooms must be available with services live and other trades clear. The depth of reporting, from a summary certificate to a full measurement report, affects the deliverable. Travel and site attendance for multi-stage checks are priced per visit. No prices are given here because every scope differs.
How to specify testing and surveys
- Define what must be proven. Frequencies, attenuation targets and rooms.
- Survey the site. Record construction, services and constraints.
- Agree the test plan. Fix method, bands and acceptance criteria.
- Check during installation. Inspect seams and seals before finishes.
- Run the final test. Measure attenuation across the range.
- Issue the report. Deliver written evidence for the project file.
Testing and survey FAQs
How is RF shielding tested?
By comparing signal levels inside and outside the room across the specified frequency range with calibrated equipment. The result is reported as attenuation in dB per band, against the target set at design stage.
How often does shielding need re-testing?
Re-test after any change to the envelope, such as a new cable, a replaced seal or a drilled fixing. Periodic checks are good practice for rooms protecting critical work, even where nothing has visibly changed.
Can you test a room built by someone else?
Yes. An independent survey first records the construction and penetrations, then the attenuation test measures what the room actually achieves. The report gives the site team evidence they can rely on.
What does the report include?
The test method, the frequencies covered, the measured attenuation per band, the condition of doors, seals and filtered entries, and any findings with recommended actions.
Do I need a survey before design?
Yes. Designing from drawings alone misses the services, penetrations and constraints that decide whether a room can be shielded. The survey grounds the design in real conditions.
Get a free quote
Related
More in specialist shielding
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.