ArxBridge
Security Doors for Operating Theatres
An operating theatre suite runs on seven leaves, from the entrance to the sterile store, and each leaf takes the LPS 1175 grade its room needs.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
The entrance leaf of an operating theatre suite carries B3 to LPS 1175 Issue 8.2, and the anaesthetic rooms, the scrub areas and the recovery bays carry the same grade, while the operating theatres, the sterile store and the plant room carry C5.
Issue 8.2 of LPS 1175 reached publication in September 2024, and under that issue a leaf earns its grade from the minutes it stands up to attack, with B3 standing for three minutes, C5 standing for five minutes and D10 standing for ten minutes, while the older names SR2, SR3 and SR4 match B3, C5 and D10 in that order.
A theatre suite holds operating theatres where surgery runs through the list, anaesthetic rooms where patients are put to sleep, scrub areas where the team washes before entering a theatre, recovery bays where patients wake, a sterile store where wrapped packs wait, and a plant room where the air handling kit runs, and the doors round those rooms keep the sterile core shut while the list runs.
- B3 / C5Grades to LPS 1175 Issue 8.2
- Coordinator keyOpens every leaf in the suite
- Sterile coreOperating theatres and sterile store sit inside it
- Anaesthetic keysOpen anaesthetic rooms only
Seven leaves round a theatre suite: the grade on each leaf
Seven leaves guard a theatre suite, and each leaf takes the grade that fits the room behind it, with B3 on the entrance, the anaesthetic rooms, the scrub areas and the recovery bays, and C5 on the operating theatres, the sterile store and the plant room.
The four leaves that staff and patients pass through in the course of a list hold for three minutes at B3, and the three leaves that guard the theatres, the sterile packs or the air plant hold for five minutes at C5.
| Room | Grade | Period |
|---|---|---|
| Entrance | B3 | FD30 |
| Anaesthetic rooms | B3 | FD30 |
| Scrub areas | B3 | FD30 |
| Recovery bays | B3 | FD30 |
| Operating theatres | C5 | FD60 |
| Sterile store | C5 | FD60 |
| Plant room | C5 | FD60 |
One report can carry the fire minutes and the forced entry minutes for the same leaf, so the two results sit side by side on the order, and the dual doorset guide shows how fire and forced entry are tested on one leaf.
Entrance leaf where the theatre list begins
Patients arrive for the theatre list through the entrance in small groups through the morning, often on a trolley or in a wheelchair, and the entrance leaf holds B3 for three minutes while the coordinator keeps watch over the way in.
A list change brings one patient in and the last patient out through the same entrance, so the leaf must let a trolley through, hold against a stranger and shut behind each arrival, even when a porter tries to hold it open with a foot. The automatic leaf guide shows leaves that open without a push when both hands are on a trolley.
The coordinator works from the theatre list, so a patient whose name sits on the list for that session passes through, while a visitor with no place on the list waits at the desk until staff come to fetch them. That list keeps the entrance leaf from standing open through the day, because the desk knows who is due and when, and the leaf shuts behind each named arrival.
The front of the suite needs the same care as the leaf itself, because a vehicle that reaches the entrance reaches the patients who wait there for the list, and under ProtectUK the posts stand with a clear gap of 1,200 mm at most and a height of 500 mm at least. The bollard guide shows the posts that stand at the front of the suite.
Anaesthetic room leaves where patients are put to sleep
Patients are put to sleep in the anaesthetic rooms beside each theatre, and the leaves round those rooms take B3 and hold for three minutes, because the drugs and the kit for the next patient sit in the room and the leaf guards them between cases.
Staff wheel a trolley with the patient into the anaesthetic room and out again into the theatre, so the leaf must move under a light hand even when it carries B3. BS 8300 with Approved Document M puts the opening force under 30 N for the first 30 degrees and under 22.5 N after that point.
Anaesthetic room keys open anaesthetic rooms only, and no anaesthetic room key opens the theatres, the sterile store or the plant room, so a key taken from an anaesthetic room opens nothing beyond the anaesthetic rooms. The lock guide shows the cylinder and the handle working as one set, and a 1 star cylinder with a 2 star handle makes a 3 star set under TS 007.
Scrub area leaves between the corridor and the theatre
The team washes at the sinks in the scrub areas before entering a theatre, and the leaves round those areas take B3, because the scrub area sits on the edge of the sterile core and the leaf guards it each time the team passes through with wet hands.
Scrubbed hands must touch nothing on the way into the theatre, so the scrub area leaf opens without a handle pull and shuts behind the team on its own, and the leaf must still hold for three minutes when the scrub area stands empty between cases.
The scrub area leaf must shut fast enough to keep the corridor air out of the sterile core, yet open wide enough for a team member in a gown to pass without brushing the frame, and the closer is set so the leaf meets the frame without a slam that would shake the sinks.
A hospital asks more of its leaves across a whole building than a single theatre suite does, and the hospital door guide shows a building where wards stay full round the clock, while the GP surgery door guide shows a building where patients arrive without a theatre list.
The scrub door is drawn shut after every pass
The scrub door is opened for the team and shut behind them at every pass through the list, so the corridor and the theatre stay apart while the cases run one after another and the list moves from one case to the next. A member of the team pushes through with clean hands, the door swings back, and the closer draws it shut before the next person reaches it.
The closer carries that duty all day. It must draw the door home after a fast push and after a slow one, and it must still pull the door shut when the team is tired near the end of the list. Staff watch the door meet its frame after each pass, and a closer that lets the door hang ajar is written down the same day.
The door is tried before the first case, from the corridor side, with the key worked and the gap looked at beside the frame. The fire door gaps guide shows how the gauge is held against the door and what the reading should be. A gap that runs even at 4 mm tells the team the door sits true in its frame.
| Point in the list | Door state | What staff watch |
|---|---|---|
| Before the first case | Tried and shut | Gap even at 4 mm |
| Between cases | Shut after each pass | Closer draws it home |
| End of the list | Shut and checked | Latch caught, seal seated |
Heat wakes the seal round the door, and it swells to close the gap as the temperature climbs past 200 degrees, finishing its growth before 250. The intumescent seals guide traces the seal from its first warmth to the point where the gap is shut.
After the last case, the scrub door is tried once more
The scrub door is tried once more after the last case, with the latch pulled, the closer watched, and the seal looked at for a seat that runs true round the frame. The list is done, the team has gone, and the door must still stand shut through the night.
One report carries the proof for the door, the frame and the hardware together, because the three were tested as a single set. The report is read before the order is signed, so a door that arrives without its papers is not hung. The fire door certification guide names the papers a report must carry before the door goes up.
The suite is divided into parts that hold fire and smoke apart from each other, and the scrub door draws one line in that division. The fire compartmentation guide traces the line the doors draw through the building from one part to the next.
The lock on the scrub door answers the theatre key and no other key in the suite, so a key lifted from a side room opens nothing at the scrub area. The lock a scrub door must carry is named in the security door locks guide, with its cylinder and handle working as one set.
The suite sends one order for the whole list, and the healthcare doors quote takes each theatre room with its grade and its lock beside it.
Recovery bay leaves where patients wake from anaesthetic
Patients wake from anaesthetic in the recovery bays, and the leaves round those bays take B3 and hold for three minutes, because the bays fill after each case and the leaf guards them again once the bays empty and the patients have moved on to the ward.
Recovery bays are not a hospital ward, because the patients who wake there leave for the ward the same day, and a hospital asks more of its leaves across a whole building. The hospital fire door guide shows a building where patients stay in beds round the clock.
Staff pass through the recovery bay leaves with trolleys and monitors through the list, so a leaf must shut behind each passage and still open under a light hand, and a leaf left open lets noise and draughts reach patients who are waking. A monitor alarm in a bay brings staff through the leaf at once, so the leaf must open fast and shut again behind them.
Operating theatre leaves at the heart of the sterile core
Surgery runs inside the operating theatres, and the leaves round those rooms take C5 and hold for five minutes, because the sterile core sits behind them with controlled drugs and high value kit, and the leaf is the only guard on that core.
Theatres are clean environments, and the sterile core behaves like a cleanroom leaf, with dust kept out and the air held steady while the list runs. The cleanroom door guide shows leaves where dust and damp must stay out of the room behind them.
No published table lines the LPS 1175 grades up with the ASTM ratings, so the order names the LPS 1175 grade on its own, and the LPS 1175 guide sets out the grades behind the order.
Sterile store leaf where wrapped packs and drugs are kept
Wrapped packs, gowns and drugs for the list wait in the sterile store, and its leaf holds C5 for five minutes, because the stock inside is counted and checked and the leaf guards it from the first case until the list ends.
Staff fetch packs from the sterile store at set points in the list, and the leaf shuts behind them each time, so the room is open for minutes at a time and shut for the rest of the day. The steel frame guide shows the frame that carries the leaf and its lock together.
Packs are fetched in the order the list needs them, so the first case takes the top packs and the later cases take the packs behind them, and the leaf shuts each time a pack is lifted out, which keeps the store shut for most of the list.
The theatre coordinator holds the sterile store key with the plant room key, and no anaesthetic room key opens the sterile store, so a key taken from an anaesthetic room opens nothing beyond the anaesthetic rooms. The dental practice door guide shows a smaller healthcare building where medicines sit behind a shut leaf.
The coordinator key is the only key that opens the sterile store leaf
One key in the suite opens the sterile store leaf, and it sits in the pocket of the theatre coordinator from the first case to the last. A key that belongs to an anaesthetic room stops at the anaesthetic rooms, and the store leaf never answers it, so the packs and the drugs behind the leaf are reached only by the hand that runs the list. The coordinator runs the list, so a pack is fetched only when a case on the list calls for it, and the leaf is never opened for a pack nobody asked for.
Staff test the leaf without stepping past its threshold, working the key from the corridor and watching the leaf meet its frame, while the gap beside it is measured with a gauge. The guide to fire door gaps shows how the gauge is held against the leaf and what the reading should be.
| Check | From | What it shows |
|---|---|---|
| Key | Corridor side | Leaf meets its frame |
| Seal | Corridor side | Seated and unpainted |
| Gap | Corridor side | Even at 4 mm |
Heat wakes the seal round the leaf, and it swells to close the gap as the temperature climbs past 200 degrees, finishing its growth before 250. The guide to intumescent seals traces the seal from its first warmth to the point where the gap is shut.
Each case calls for its packs in turn, and the leaf is drawn shut after every fetch, so the store is rarely open and the packs wait behind a shut leaf for most of the list. The leaf that opens for the list and shuts behind it keeps the store shut while the theatre works, and the coordinator knows at any point in the list whether the store stands open or shut.
The lock on the sterile store leaf answers the coordinator key and no other key in the suite, so a key lifted from an anaesthetic room opens nothing in the store. The locks guide names the lock a store leaf must carry and the way its cylinder and handle work as one set.
No pack leaves the store without the leaf shutting behind it
One report carries the proof for the leaf, the frame and the hardware together, because the three were tested as a single set and the report names each piece beside the leaf. The report is read before the order is signed, so a leaf that arrives without its papers is not hung. The guide to fire door certification names the papers a report must carry before the leaf goes up.
Leaf by leaf, the suite is divided into parts that hold fire and smoke apart from each other, and the store leaf draws one line in that division. The guide to fire compartmentation traces the line the leaves draw through the building from one part to the next.
The suite order lists every room with its grade and its lock, and the healthcare doors quote page lists the theatre rooms one by one, so the sterile store leaf and the key that opens it stand on one line together.
Plant room leaf, with the grade, lock and closer on one order line
Pumps, fans and boards that move the air and light the theatres sit in the plant room, and its leaf holds C5 for five minutes, because the air handling plant inside keeps the theatres sterile and the leaf is the only guard on it.
The theatre coordinator key opens every leaf in the suite, while anaesthetic room keys open anaesthetic rooms only, and the master key guide shows how those keys sit together on one suite. The plant room guide shows what that leaf must do.
Every leaf in the suite goes on one list for the order, with a line per leaf naming its room, grade, lock and closer, and each line is read back against its own room before the order is signed. The ten steps guide shows how that list takes shape, and the specifying guide treats the leaf, the frame and the hardware as one doorset.
The grade holds only while the leaf, the frame and the hardware stay as they were tested, and the rating guide shows what keeps an LPS 1175 result valid, while the maintenance checklist shows the routine checks on each leaf, its lock and its closer.
Write the room, the grade, the lock and the closer for every leaf on one list, then check each line against its room before the order goes out.
What grade should an operating theatre entrance door carry?
B3 to LPS 1175 Issue 8.2, a three minute hold, because patients arrive for the theatre list in small groups and the coordinator watches the leaf from the first case to the last.
What grade should an operating theatre door carry?
C5 to LPS 1175 Issue 8.2, a five minute hold, because the sterile core behind that leaf holds controlled drugs and high value kit.
What grade should a sterile store door carry?
C5 to LPS 1175 Issue 8.2, a five minute hold, because the wrapped packs and drugs for the list are counted and checked behind that leaf.
Can an operating theatre leaf hold a fire period and a security grade?
Yes, an operating theatre leaf can be proved for fire and for forced entry together, and the two results stand side by side in one report.
Who holds the keys in an operating theatre suite?
The theatre coordinator holds the key that opens every leaf, while anaesthetic room keys open anaesthetic rooms only.
Pricing doors for a hospital site? The healthcare doors quote page lists what one enquiry needs, department by department and room by room.
Get a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.