A PAS 68 rating belongs to the bollard on its tested foundation. Deep and shallow foundations, ground surveys and utilities, and the evidence to ask for.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

A PAS 68 bollard stops a vehicle because of what sits below the ground, not because of the steel post above it. The post is the part a driver sees, but the impact load travels down the post and into the foundation, and the foundation is what holds the line. A rating that names a vehicle mass, a speed and a penetration distance is a rating for the bollard on its tested foundation, in tested ground. Change the foundation, and the rating no longer describes the installation in front of you.

That is the fact to hold onto through every decision that follows. The choice between a deep foundation and a shallow one, the ground survey, the utilities survey and the foundation drawing all serve one purpose: to put the tested foundation under the tested bollard, in ground that behaves like the ground in the test. The sections below work through each of those decisions in turn, and name the evidence to ask for before the order is placed.

  • Rating covers the installationA PAS 68 rating belongs to the tested bollard on its tested foundation, not to the post alone.
  • 1,200 mmMaximum clear gap between bollards, measured at 600 mm high.
  • ISO 22343-1:2023Current international standard, superseding PAS 68 and IWA 14-1.
  • Survey before diggingUtilities and ground conditions decide the foundation type before the design is fixed.

The foundation does the stopping, not the post

When a vehicle strikes a bollard, the post bends and the load moves down into the foundation. The foundation resists by mass and by grip on the surrounding ground. A post set in a shallow socket or a weak slab can be pulled out or pushed over, and the vehicle keeps moving. The test measures penetration: how far the load carrying part travels past the barrier line. A rating of 0 metres penetration means the foundation held the line. A rating with metres of penetration means the vehicle carried on past it.

The size of the foundation follows the threat, not the post. A bollard rated to stop a 7,500 kg truck at 48 km/h needs a foundation that can absorb that energy, and a bollard rated for a 1,500 kg car at the same speed needs less. Two bollards that look the same above ground can need very different foundations below it, and a quote that prices the post without the foundation is not a quote for a rated line.

The same logic applies to the line as a whole. A line fails at its weakest foundation, so every bollard in the line needs the same tested foundation, not just the ones in easy ground. Spacing matters too: the maximum clear gap between bollards is 1,200 mm, measured at 600 mm high, so the line must be set out as a line, with each foundation in its measured place. For the spacing rule and how it is measured, see the PAS 68 bollards guide and the bollard regulations guide.

What the rating covers: bollard, foundation and ground together

A PAS 68 rating is a short code for one crash test. Take V/7500[N3]/80/90:0/0: V means the test used a real vehicle, 7500 is the vehicle mass in kilograms, [N3] is the vehicle category, 80 is the impact speed in kilometres per hour, 90 is the impact angle in degrees, and the figures after the colon are the penetration distance and the debris dispersion distance, both 0 metres. The PAS 68 bollards guide works through the code in full, and the vehicle impact ratings page sets out what a rating must state.

The test installs the bollard in a foundation built to the specification of the product, in ground of a stated type, and the rating records what happened. The foundation drawing is part of the test record: its depth, its plan size, its concrete, its reinforcement or frame, and how the bollard is fixed to it. A rating that does not name its foundation has not been read properly, because the foundation is part of what was tested.

ISO 22343-1:2023 is the current international standard, and it supersedes PAS 68:2013 and IWA 14-1:2013. For a new specification, name ISO 22343-1:2023 and accept a PAS 68 or IWA 14-1 rating only where the project brief still calls for it. The three documents test the same kinds of vehicle: a 1,500 kg car, a 2,500 kg 4×4, a 3,500 kg van, a 7,200 or 7,500 kg truck, and a 30,000 kg truck, at common speeds of 48, 64 and 80 km/h. The guide to PAS 68, IWA 14-1 and ISO 22343 compares the three documents, and the ISO 22343 guide explains the current standard.

What the rating does not cover is just as important. A bollard rated for a 1,500 kg car at 48 km/h has not been shown to stop a 7,500 kg truck at 80 km/h. A bollard tested on a deep foundation has not been shown to work on a shallow one. And a bollard tested in firm ground has not been shown to work in made ground or soft clay. The rating describes one tested installation, and the installation on site must match it.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Deep foundations: how a concrete block spreads the load

A deep foundation is a large block of concrete below ground, with the bollard set into it. When the vehicle strikes, the impact load spreads through the block into the ground around it over a large area, so the ground takes the force without the bollard moving. The block is the anchor, and the post is the lever that carries the load down to it.

Deep foundations suit open ground where digging is straightforward: car park edges, building fronts on clear ground, and sites with no services below. They need excavation, formwork, concrete and curing time, and the ground must take the excavation without shoring or dewatering problems. Where the ground is firm and the services are clear, a deep foundation is the simplest answer.

The depth and size are set by the tested design, not by rule of thumb. The foundation drawing states the depth, the plan size, the concrete specification and the fixing detail, and the installer builds to that drawing. A deeper foundation than the tested one is not automatically better: it changes the installation the test describes, so build to the drawing, not beyond it.

Deep foundations also need the ground around them to be sound. Made ground, soft clay or a high water table change how the block behaves, and a foundation designed for firm ground may fail in soft ground. That is why the ground survey comes before the design is fixed, and why the design must state the ground it assumes. For how the foundation type is matched to the site, see the guide to choosing HVM bollards.

Shallow foundations: a wider raft where depth is limited

A shallow foundation spreads the load across a wider area near the surface, using a steel frame or a raft cast into a shallow concrete pad. The bollards in a line are often linked by the frame, so the impact load is shared across several units instead of falling on one. The load still reaches the ground, but through area rather than through depth.

Shallow foundations suit sites where deep digging is impossible: a basement roof or suspended slab below, dense utilities, listed paving that cannot be disturbed, or ground with a high water table. They also suit sites where the line must be built fast, because less excavation means less disruption to the building and to the people using it.

The trade-off is footprint. A shallow foundation takes up more area at the surface than a deep one, and the frame must be protected from damage during the rest of the works. The surface above it must be reinstated to the same standard as the rest of the site, because a frame left exposed or a pad left unfinished is a trip hazard and a weak point in the line.

A shallow foundation is not a weak foundation. Tested shallow systems stop the same vehicles as tested deep ones, at the same speeds, with the same penetration figures. The difference is how the load is spread, not how much load the line can take. The rating still applies only to the tested unit on its tested foundation: a shallow foundation that was not tested with the bollard carries no rating, however shallow the dig. For the bollard types that use shallow foundations, see the guide to choosing HVM bollards and the security bollards page.

The ground survey: what to find out before the design is fixed

The ground survey answers one question: does the ground on site behave like the ground in the test? A trial pit or a borehole along the line shows the soil, the made ground, the water table and anything buried that the drawings miss. Without it, the foundation design is a guess about ground nobody has seen.

Made ground is the most common surprise. Fill laid over the original soil, often mixed with rubble, behaves differently from firm ground, and a foundation designed for firm ground may fail in it. Soft clay, a high water table, tree roots and existing slabs all change the foundation design in the same way, and each of them is cheaper to find before the order than after the concrete is poured.

Survey points along the whole line give a truer picture than a single pit, because ground conditions change across a site. A line that crosses made ground at one end and firm ground at the other needs a design that answers both, and that answer can only come from survey points that cover the line.

Raise what the survey finds before ordering. If the ground differs from the test ground, the foundation design may need to change, and that change needs agreement in writing before the order is placed. Moving the line is cheap before the order. Moving it after the concrete is poured is not. For the wider survey and testing services that support a specification, see the hostile vehicle mitigation page.

Utilities: mapping what sits at foundation depth

Power cables, gas pipes, water mains, drainage and telecoms ducts all sit at foundation depth, and striking one stops the work and can be dangerous. A utilities survey should map every service along the line before any design is fixed, and the line should move around services where possible.

Where the line cannot move, the service may need to be diverted, and that work needs its own consent and its own programme. A diversion discovered after the order adds delay and cost that a survey would have caught, and it can hold up the whole line while one service is moved.

A shallow foundation disturbs less ground, so it is more likely to sit above services than a deep one. That is one reason shallow systems are chosen on service-heavy ground. But the survey still comes first, because a shallow foundation can still strike a shallow service, and a service that runs across the line at any depth is a service that must be mapped.

Record the survey. The utility drawings, the survey report and any diversion agreements belong with the foundation design in the handover pack, so the next person to dig along the line knows what is below.

What a foundation design must state

A foundation design is a drawing plus a specification, and it must state everything the installer needs to build the tested foundation: the depth, the plan size, the concrete specification, the reinforcement or steel frame, the fixing detail for the bollard, the drainage falls and the finished levels.

It must also state the ground it assumes: the soil type, the bearing conditions and the water table the design was checked against. If the survey shows different ground, the design must be revisited, not built as drawn. A design that assumes firm ground and meets soft clay is a design that was never checked against the site.

Ask for the design in writing before the order, with the test evidence that covers it. The test report or certificate should name the foundation it was tested with, and the drawing should match that foundation. A quote without a foundation detail, a depth and a concrete specification is a quote for a post, not for a rated line. Compare quotes on the same scope: same rating, same foundation, same number of units, same survey and same reinstatement.

The design must also cover the line, not just one bollard: the spacing between units, the edge distances, the joints between foundations where the frame is continuous, and the reinstatement of the surface above. The maximum clear gap between bollards is 1,200 mm, measured at 600 mm high, and the same limit applies at gates, drains and corners, because a vehicle uses the widest gap, not the average gap. For the spacing rule in full, see the bollard regulations guide.

Question Deep foundation Shallow foundation
How the load spreads Through a large concrete block into the ground below Across a wider area near the surface, through a steel frame or raft
Depth below ground Deep excavation, set by the tested design Shallow excavation, set by the tested design
Where it suits Open ground with straightforward digging Basement roofs, dense utilities, listed paving, high water table
What limits it Services, water table, shoring, curing time Surface footprint, protection of the frame during works
Evidence to ask for Foundation drawing and test report naming the deep foundation Foundation drawing and test report naming the shallow foundation

The test that proves the foundation, not just the bollard

A bollard rating covers the bollard, the foundation and the ground together, and a test that proves the post on one foundation does not prove it on another. The rating example V/7500[N3]/80/90:0/0 names the vehicle, the mass, the speed, the angle and the penetration, and the foundation that held the vehicle in that test is part of the rating. A bollard fitted on a different foundation has no proven rating, whatever the post itself can do.

ISO 22343-1:2023 is the current vehicle barrier test standard, and it supersedes PAS 68:2013 and cancels and replaces IWA 14-1:2013. Test vehicles run from a 1,500 kg car to a 30,000 kg truck, and test speeds are 48, 64 and 80 km per hour. Ask for the test report naming the bollard, the foundation and the ground, and file it with the design before the order is placed.

The foundation design must state the depth, the size, the concrete and the reinforcement, and the ground the design assumes. A design that names the bollard and leaves the ground to chance is a design that has not been finished. Our PAS 68 bollards guide works through the rating and what it asks of the whole line, and our ISO 22343 vehicle security barriers guide reads the rating field by field.

When the ground will not take the load: what changes

Some sites will not take a deep foundation. A shallow foundation spreads the load over a wider raft where depth is limited, and the raft must be sized for the vehicle the rating names, not for the vehicle the site expects. A raft that suits a car will not stop a truck, and a foundation designed for the wrong vehicle is a foundation that has failed before it is built.

Utilities decide what can be built as much as the ground does. Pipes, cables and drains sit at foundation depth, and a foundation that cuts through them is a foundation that cannot be built. Map what sits below the line before the design is fixed, and move the line or the foundation where the two clash. A survey that finds a pipe after the concrete is poured is a survey that came too late.

ProtectUK guidance sets 1,200 mm as the maximum clear gap between barriers in a line and 500 mm as the minimum height, so check the whole frontage, not only the bollard. A gap wider than 1,200 mm lets a vehicle through between two rated posts, and a line with a gap in it has no rating at all. Our choosing HVM bollards guide works through the line as one system, and our bollard regulations guide sets out what the rules ask of a bollard line.

Item What the design must state Why it matters
Depth and size Depth, size, concrete, reinforcement The rating depends on the foundation
Ground Ground type and bearing the design assumes A different ground changes the result
Utilities Pipes, cables and drains at foundation depth A clash stops the build
Test evidence Test report naming bollard, foundation and ground A post alone has no proven rating

Order the foundation with the bollard, and file the design, the survey and the test report together, so the next specifier can see what the rating rests on.

What goes wrong when the foundation is specified apart from the bollard

The most common failure is ordering the bollard and the foundation from different decisions: a rated post on a foundation nobody checked. The post arrives tested, the foundation is built to a guess, and the line has no rating. The fix is to specify them together, in one order, against one foundation drawing.

The second failure is changing the depth on site. A deep foundation shortened to miss a cable, or a shallow frame cut to fit around a drain, is no longer the tested foundation. Any change to depth, size or fixing needs agreement before the concrete is poured, not after it has set.

The third failure is building in ground the survey never saw: a void below, made ground, or a water table higher than the design assumed. The foundation settles or moves, the bollard leans, and the line loses the alignment the rating assumed. A line that leans is a line whose spacing no longer measures 1,200 mm at 600 mm high.

The fourth failure is forgetting the surface. Drainage that lets water sit around the base, paving that traps water against the post, or a finish that hides the fixing all attack the fixing first, and a fixing that fails leaves the post standing on nothing. Automatic bollards carry the same risk in a different form: the pit below a rising bollard needs drainage and a level base, as the rising bollards page shows, and a pit that floods is a bollard that stops working.

The fix for all four is the same: one specification, one drawing, one test record, covering bollard and foundation together, checked against the survey before the order is placed. Where the line meets a gate or a barrier, the same discipline applies: the anti-ram gates and barriers guide and the HVM planters and street furniture guide show how the rest of the line is specified. Where the wider duties apply, the Martyn’s Law guide and the transport hub security requirements guide set out what premises must consider.

The rating is for the bollard on its foundation, not for the bollard on its own. A foundation that was never tested carries no rating, however strong the post looks.

Can I fit a PAS 68 bollard into my existing foundation?

Only if that foundation matches the tested foundation for that bollard. A rating belongs to the tested installation, foundation included, so a tested bollard in an untested foundation has no rating. Ask for the foundation drawing and check it against the site before you order.

How deep does a PAS 68 foundation need to be?

There is no single depth. The depth is the one in the tested design for that product, and deep and shallow foundations both work when they are tested. Ask for the foundation drawing and the test report that names it, and build to the drawing.

What if the ground on site differs from the test ground?

Raise it before ordering. The foundation design may need to change, and that change needs agreement in writing before the order is placed. A trial pit or a borehole along the line answers the question early, when moving the line is still cheap.

Do shallow foundations stop the same vehicles as deep ones?

Yes, when they are tested. The rating states the vehicle, the speed and the penetration, and the foundation type does not change what the rating proves. A shallow foundation that was not tested with the bollard carries no rating, just as an untested deep one does not.

What should I ask for in a bollard foundation quote?

The full rating code, the foundation drawing and depth, the concrete and frame specification, the survey scope and the reinstatement included. Compare quotes on the same scope, and ask for the test evidence to be supplied with the installation.

Specifying a PAS 68 bollard line?Send the threat vehicle, the line length and the ground conditions for a quote on tested bollards with their tested foundations.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.