ArxBridge
Laboratory Security Doors
Laboratory door rules: rated doorsets that seal rooms and resist attack for research and testing sites, with access control and one schedule for the whole site.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
A laboratory holds samples, equipment and records that cannot be replaced, and the doors on its rooms decide who reaches them and what leaves with them. Research rooms, stores and corridors sit side by side, so a door that seals one room and a door that resists attack on the next both belong on the same schedule.
The order starts with the room, not with the leaf. A store of solvents faces a different risk from a room of instruments, and a corridor that moves staff between the two faces a different risk again, so the rating follows the opening.
The rating, the sealing, the access control and the records all sit inside one schedule, and an order that names each one plainly puts the right doorset on the right opening. The columns for that schedule are set out in our how to specify security doors guide, and the zone-by-zone discipline is worked through in our data centre physical security guide.
- LPS 1175 B3 / C5 / D10Forced entry ratings, three, five and ten minutes
- LPS 2081 SRA / SRBStealth ratings, one and three minutes
- PAS 24Enhanced security doorset
- FD30S30 minutes with a smoke seal tested to BS EN 1634-3
Research rooms, stores and corridors: where a laboratory puts its doors
A laboratory divides into rooms that hold different things: research rooms where the work happens, stores where samples and solvents sit, and corridors that move staff between them. Each room asks for its doors in a different place, and the rating follows what sits behind the door.
The research room door works all day. Staff pass through it with samples, instruments and records, so it has to open quickly for the right hands and hold against the wrong ones, and a door that fails at either duty leaves the work inside open to the corridor.
Start with a walk round the site, and note every door a person can reach from outside. The rating for each door follows the attack it could face, so a staffed entrance takes less than a rear door onto a yard nobody watches after dark. Our security door specification mistakes guide covers the errors that leave a rating short of the opening.
The rating that fits the room: B3, C5 and D10 door by door
The LPS 1175 rating on a laboratory door comes from two facts: the tools the doorset resists and the minutes it holds. Three minutes against the category B tool set gives B3, five minutes against the category C tool set gives C5, and ten minutes against the category D tool set gives D10. Issue 8.2, dated September 2024, carries the current labels, and older drawings still show SR2, SR3 and SR4, which read as B3, C5 and D10.
A research room usually takes B3, a sample store C5, and a store of controlled substances D10, but the risk assessment sets the rating for each opening, not the habit of the last order. The rating tables sit on the LPS 1175 page, and the two routes are weighed in our LPS 1175 versus PAS 24 guide.
PAS 24 and EN 1627 offer two different routes to a rated doorset: PAS 24 is the enhanced security doorset, and EN 1627 grades from RC1 to RC6. Each route is proved by its own test, so the order must name the route it means, not the other one. The two scales are compared in our LPS 1175 vs EN 1627 guide.
Sealing the room: air, dust and the door that must shut tight
Some laboratory rooms must hold their air inside. A room that works with powders, solvents or cultures needs a door that shuts tight and stays shut, because a gap round the leaf lets the room leak into the corridor and the corridor leak into the room. The seals and the closer belong on the schedule beside the rating, because a door that stands open seals nothing.
The seal works only where the gap round the leaf is right, so the gap stays at 4 mm, and the intumescent seal swells as the heat builds, closing the gap at around 200 to 250 degrees. Where the seal is missing, painted over or cut short, the gap it leaves lets fire and smoke through whatever the rating on the leaf says.
A door that must seal and resist attack at once needs both proofs on the same assembly. The frame, the seals and the fixings all carry the rating, so the order names the whole doorset, not the leaf alone. How glass, frame and beads are tested together is covered in our fire rated windows guide, and the duties of a door on a smoke path are covered in our smoke control doors guide.
The seal that keeps the room shut: air, dust and the leaf
A laboratory door must shut tight, because the room behind it holds samples and instruments that dust and draughts can spoil. The seal round the leaf matters as much as the lock, and a gap round the leaf lets air through whatever the rating on the leaf says.
The gap round a fire door leaf must stay at 4 mm, because a wider gap lets fire and smoke past the leaf. Intumescent seals expand at around 200 to 250 degrees, and the seal must be checked on every round, because a seal that has come away or been painted over leaves the gap open.
A leaf can only seal as well as the frame it closes into, so the frame needs its own seals and its own check on every round. Order the frame, the leaf and the hardware as one doorset, and ask for the test report that names all three, because a report that names only the leaf says nothing about the frame it closes into.
Research rooms, stores and corridors each ask for a different door, and the rating follows the room. LPS 1175 grades forced entry in minutes, with B3 holding three minutes, C5 holding five minutes and D10 holding ten minutes, all under Issue 8.2, dated September 2024. The grades in full are set out on our LPS 1175 page.
Glazing lets staff see into the room without opening the door, and the glass must be proved for the job. The glass, the frame and the fixings belong on the same line, because a pane in the wrong frame carries no proof at all. The windows that share the same wall are covered in our fire rated windows guide.
The laboratory that empties at night: stealth beside forced entry
When the last member of staff leaves, the laboratory stands empty until morning, and the doors must hold through those hours without anyone to hear a forced entry. A thief who works without noise needs time, and the rating must give the alarm time to answer.
LPS 2081 grades doors that must resist a stealth attack, with SRA holding one minute and SRB holding three minutes. The stealth grade sits beside the forced entry grade on the same schedule line, and the test report must name both grades and the doorset they were proved on.
Access control keeps the laboratory doors together, so one card opens the rooms a member of staff uses and one stopped card stops working everywhere at once. Contractors and visitors take a card that ends at the end of the day, and the record should name who holds each card.
Fire and forced entry share the laboratory door where the room needs both. A door that must hold fire takes FD30 or FD60 proved to EN 1634-1, and the two proofs sit on separate lines because each is proved on its own test. How the two proofs sit together is worked through in our fire and security doors dual certification guide.
| Room | Rating | Sealing | Evidence |
|---|---|---|---|
| Research room | LPS 1175 B3 | Seals, 4 mm gaps | Test report names the doorset |
| Store | LPS 1175 C5 | Seals, 4 mm gaps | Test report names the doorset |
| Corridor | LPS 1175 B3 | Seals, closer | Test report names the doorset |
| Night store | LPS 2081 SRB | Seals, reader | Test report names the doorset |
Put the rating, the sealing and the stealth grade on one schedule line for every room, so the next reader can see what was tested and what holds it. The checks each round should make are set out in our security door maintenance checklist.
The quiet attack: LPS 2081 in a laboratory that empties at night
After hours, the attack on a laboratory changes. LPS 2081 proves a doorset against a quiet attack, SRA for one minute and SRB for three, and the minutes follow the site: a room under camera watch gives the attacker little time, while a store nobody watches gives the attack longer to work.
Stealth and forced entry are two different proofs, and a door that needs both must carry both ratings on the same line. A store door that holds against a quiet attack but falls to a crowbar in three minutes has only half a rating, so the schedule names both proofs for every door that stands empty overnight.
Access control for staff, contractors and visitors
Access control on a laboratory door decides who can open which room, and when. Staff take a card or a fob for the rooms they use every day, contractors take a code that dies when the job ends, and visitors take the intercom, because a visitor with no card has no other way in.
A door that locks shut when the power fails traps people inside, so the release on power failure belongs in the specification beside the reader. The release must work when the power is gone as well as when the alarm sounds, and a battery backup or a manual release belongs on the schedule beside the motor.
A card that is lost should stop working everywhere at once, so one lost card never opens every room in the building. The office that issues the cards should be able to stop one card without stopping the rest, and the record should show which card opened which door and when. Readers, fobs and biometrics in the lane are covered in our security turnstiles guide.
Fire and security on one doorset: the two proofs together
A laboratory door often has to do two jobs at once, and each job needs its own test report. The fire report comes from EN 1634-1 and the forced entry report from LPS 1175 or PAS 24, and a report that names only the leaf leaves the frame, the seals and the fixings unproved.
A laboratory door on an escape route usually takes FD30, a door in a compartment wall usually takes FD60, and a door on a smoke path takes FD30S, with a smoke seal proved to BS EN 1634-3. Closers to BS EN 1154 must pull the leaf shut every time, with no fire door taking less than EN 3, and a closer set too strong puts the door outside the access rules, because BS 8300 and Approved Document M cap the opening force at below 30 N through the first 30 degrees and below 22.5 N beyond that.
Hinges to BS EN 1935 carry the leaf through its life: grade 13 is proved for 200,000 cycles at 120 kg, and grade 14 for the same cycles at 160 kg. A hinge that cannot carry the leaf lets it drop over time, until the leaf drags on the floor and the latch no longer meets the keep. For the grades and the parts behind a working fire door, see our fire door hardware guide.
Glazing and vision panels: seeing into the room without opening it
A vision panel lets staff see into a laboratory before they open the door, and the glass in it must hold if a fire starts inside. The pane, the frame, the beads and the fixings are tested as one assembly, so a rated pane set in a frame that was never tested with it has no rating at all.
Impact resistance is proved to EN 356, which grades a pane from P1A to P8B, with the top three classes set by axe blows: 30 to 50 for P6B, 51 to 70 for P7B, and 70 or more for P8B. A pane that must hold fire and resist impact needs a test report for each job, and the order names both classes on the same line.
Where the work behind the glass must stay unseen, the panel takes frosted or wired glass, but the rating stays the same. How the assembly is proved is explained on the fire rated glazed doors page, and how glass, frame and beads are tested together is covered in our fire rated windows guide.
The laboratory order: one schedule for every room
Set the enquiry out as a specification, one line for every laboratory door. Each line names the room and the position, the forced entry rating, the stealth rating where one is needed, the fire period and the smoke seal, and the leaf, frame, glass, seals and hardware as one doorset. A rating that sits on the leaf alone is no rating at all: ask for it on the whole doorset, proved to LPS 1175 or PAS 24.
Keep the test report, the classification and the hardware schedule with the doors from the day they arrive, and write the inspection routine into the handover pack, so the next team can see which door carries which rating and which check each door has passed. What each check looks for is set out in the fire door inspection checklist.
| Room | Door | Rating | What to check |
|---|---|---|---|
| Research room | Swing security door | LPS 1175 B3 | Closer, reader, seals |
| Sample store | Security door | LPS 1175 C5 | Lock, closer, seals |
| Solvent store | Security door | LPS 1175 D10 | Lock, seals, self-closing |
| Corridor cross-door | Fire door | FD30S | Seals, gaps, latch |
| Plant room | Security door | LPS 1175 B3 | Closer, hinges, seals |
A laboratory door seals the room behind it and resists the attack in front of it, so the rating, the seal and the access control must all sit on the same schedule.
What security rating do laboratory doors need?
The site decides, by the room and what sits behind the door. A research room often takes B3, a sample store C5, and a store of controlled substances D10, and the risk assessment names the rating for each door.
Do laboratory doors need to seal?
Where the room must hold its air inside, yes. The seals and the closer belong on the schedule beside the rating, because a door that stands open seals nothing, and the gap round the leaf stays at 4 mm on a fire door.
Can one laboratory doorset hold a fire rating and a security rating?
Yes, where the doorset is proved for both jobs at once. Fire is proved to EN 1634-1 and forced entry to LPS 1175 or PAS 24, and each proof must name the doorset that will be fitted.
What breaks a laboratory door rating?
A seal that has come away, a hinge that drops, a closer that cannot shut the leaf, or a lock that gives way before the leaf. Repair or replace it, and record the work.
How often should laboratory doors be checked?
Each door is checked on the routine the risk assessment sets, and the record names the door, the fault and the fix. The inspection checklist guide sets out what each check looks for.
Get a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.