Bollard Cost Factors Explained
What sets a bollard quote: line length and count, rating step, fixed or rising type, foundations, utilities, power and finish. Factors only.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
A bollard quote has no standard figure. The quote turns on the line, the rating, the type, the foundations, the ground works, the power and the finish. Two lines that look the same from the pavement can carry very different quotes, because the parts that set the figure sit below the ground, inside the post and inside the pit. Compare quotes like for like: same line length, same count, same rating with test evidence, same type, same foundation detail and same fitting scope. A quote that leaves out the foundations, the utilities survey or the service routine is not cheaper. It is a different line.
The factors below follow the order a quote is built in. Start with the line and the ground, then the rating, then the type, then the foundations and the utilities, then power and controls where the bollard must rise and fall, then finish and spacing. Our PAS 68 bollards guide works through the rating, the spacing and the types in full, our PAS 68 bollard foundations guide covers deep and shallow foundations, and our rising bollards page covers the bollard that moves. Our guide to choosing HVM bollards compares the four types side by side.
This page names no figures, because a figure without the line, the rating and the foundation behind it would mislead. What follows is what each factor changes and what to ask for, so a quote can be read on its own terms and two quotes can be compared fairly.
- PAS 68Vehicle impact test standard for bollards
- ISO 22343-1:2023Current vehicle barrier test standard
- 1,200 mmMaximum clear gap in a rated line
- Deep vs shallowThe foundation choice the ground decides
The line sets the baseline: length, count and the ground under it
Every bollard quote starts with the line: the length of frontage to close and the count of bollards it takes. The count follows the spacing, and the spacing follows the guidance: ProtectUK guidance sets 1,200 mm as the maximum clear gap between barriers in a line, so a long frontage needs more bollards than a short one, and each bollard adds a post, a foundation and fitting time. A frontage measured wrong produces a quote for a line that does not close, and the gap at the end is the weak point a vehicle will find.
The ground decides the foundation before the bollard is chosen. Firm ground takes a deep foundation, ground with services or shallow cover takes a shallow raft, and soft or made ground needs a design of its own. Venues that expect duties under Martyn’s Law, which sets tiers for premises that hold 200 or more people, should start from the threat vehicle and the speed it could reach on the approach. Our bollard regulations guide sets out the spacing, height and foundation rules that apply in the UK.
Access decides the type before the rating is chosen. A permanent line takes fixed bollards, an entrance that must open for deliveries takes removable or rising bollards, and a site with a managed gate takes bollards that work with the gate. List every opening separately, with its own length, ground and access needs, rather than asking for a single figure for the site.
The rating step: PAS 68, IWA 14-1 and ISO 22343 on one bollard
A rating is the largest single step in a bollard quote after the line itself. A PAS 68 rating states the vehicle stopped, the speed, the angle and how far the vehicle travelled past the line. The example rating V/7500[N3]/80/90:0/0 shows the parts: the vehicle type and mass, the impact speed, the impact angle and the penetration distance. Each step up needs a heavier post, a stronger foundation and its own test evidence, and each step changes the quote.
The impact rating is tested under PAS 68, IWA 14-1 or ISO 22343-1:2023, which supersedes PAS 68:2013 and cancels and replaces IWA 14-1:2013. Test vehicles run from a 1,500 kg car to a 30,000 kg truck, and test speeds are 48, 64 and 80 km per hour. Our ISO 22343 vehicle security barriers guide explains how to read the rating, and our vehicle impact ratings page sets out how the three standards sit together.
The rating belongs to the complete tested installation, not to the post alone. The foundation and the ground are part of the tested bollard, so a rated post in an untested foundation is not a rated bollard. Ask for the certificate naming the exact bollard, its foundation detail and its configuration. A certificate for a different model does not cover the order, and a bollard described as heavy duty without a certificate has no proven rating at all. Our PAS 68 bollards guide works through the rating in full.
Fixed, removable and rising: the type decides the quote
Fixed bollards are the default for a permanent line. The post is set in its foundation and stays there, with no moving parts, no power and no routine beyond inspection. A fixed line suits a frontage that never needs to open, and it is the simplest build a supplier can quote.
Removable bollards suit an entrance that opens now and then. The post lifts out of a socket set in the ground, so a delivery or an emergency vehicle can pass and the line can close again after. The socket must be kept clear of grit and water, and the post must be locked in place when it is fitted, or the line has a gap with a post beside it.
Rising bollards are a machine, not a post. The post sinks into a pit in the road to let a vehicle through and rises again to close the entrance, driven by a hydraulic or electromechanical drive and told when to move by controls. The drive, the pit, the power and the controls are part of the quote, and a rising bollard that must also stop a vehicle carries a crash rating of its own. Our rising bollards page covers the drive, the pit and the duty cycle in full.
Shallow-mount bollards suit a site where digging is limited. The foundation is a wider raft rather than a deep block, so the bollard can be fitted where services sit close to the surface or the ground cannot be dug deep. The trade-off is a wider footprint and a foundation design that must be proved on its own evidence.
Foundations: the deep block, the shallow raft and the ground between
The foundation does the stopping, not the post. The impact load travels down the post and into the foundation, and the foundation is what holds the line. A deep foundation is a concrete block that spreads the load into the ground below, while a shallow foundation is a wider raft that spreads the load across the surface where depth is limited. Our PAS 68 bollard foundations guide sets out the deep and shallow choice in full.
The rating covers the bollard on its tested foundation, in tested ground. A bollard that passed its test in one foundation detail does not carry the rating in a different one, and a foundation poured without the design behind it is a guess, not a rating. Ask for the foundation design with the order, naming the depth, the width, the concrete and the ground it was designed for.
The ground survey comes before the foundation design. The survey finds what sits below the surface, how firm the ground is and where the water sits, and the design follows what the survey finds. A site that skips the survey will find the ground the hard way, when the digging starts and the design no longer fits.
Utilities, surveys and the digging the quote must cover
Utilities sit at foundation depth under most frontages. Cables, drains, gas and water run under pavements and roads, and a foundation dug without a map will find them the hard way. Map the utilities before the order is placed, and let the map decide where each bollard can stand and how deep its foundation can go.
Consent sits beside the digging. A line on the highway needs consent from the highway authority, a line that changes the street needs planning consent, and a line that closes a road needs a temporary traffic order. Our bollard regulations guide works through highway consent, planning and temporary traffic orders, and the time they take should sit in the programme from the start.
Access for plant and traffic management are part of the quote too. A frontage on a busy road needs barriers, signs and a working area kept clear, and a frontage in a pedestrian area needs the work done without closing the route people use. The reinstatement after the digging, the surface made good and the markings repainted, belongs in the quote, not after it.
Power, controls and the daily cycle of a rising bollard
A rising bollard needs a dedicated electrical supply, planned before the civil work begins. The supply should be agreed with the bollard design early, with ducting laid before the ground is finished, and the pit needs drainage so the mechanism stays dry and clear of grit. Plan the power, the ducting and the drainage at the same time as the bollard, not after it.
The controls decide who can lower the bollard and when. Staff may use fobs or cards, visitors may use a keypad code, deliveries may use an intercom, and a vehicle already known to the site may open the entrance through a reader. The control system should keep a record of who lowered the bollard and when, and codes should be changed when staff leave.
Duty cycle is how often the bollard moves, and it decides whether the drive lasts years or months. A bollard on a quiet entrance moves a few times a day and rests between movements, while a bollard on a busy entrance moves all day, with vehicles arriving and leaving from the first shift to the last. A drive worked harder than its rating will run hot, slow and wear out early. Count how often the bollard will move on the busiest day the site sees, and give that figure to the supplier before the drive is chosen.
What happens when the power fails must be agreed in advance. A rising bollard can be set to stay up or to sink down when power fails, and the choice follows the site: a line that must stay closed keeps the bollard up, while an entrance that must stay open for emergency vehicles lets it sink. Agree the fail state with the security team before the order is placed.
Finish, spacing and the line that must still let people through
The finish is the next line in the quote. Steel suits most sites, and a coating gives the project colour and protects the steel in exposed positions. For coastal or chemical environments the specification steps up the coating system, and the site conditions decide the step. A reflective band or a contrasting colour helps drivers and pedestrians see the bollard, and visibility is part of the specification, not an afterthought.
Spacing decides the count, and the count decides the quote. ProtectUK guidance sets 1,200 mm as the maximum clear gap between barriers in a line and 500 mm as the minimum height, so the line must be measured gap by gap, not bollard by bollard. A gap wider than the limit is an opening a vehicle can use, and the ends of the line need the same care as the middle.
A line that blocks vehicles must still let people through. Pedestrians, wheelchair users and people with pushchairs need a route past the line, and the spacing must leave that route open without leaving a gap a vehicle can use. A line that blocks the pavement as well as the road has failed the people it was meant to protect.
Reading two bollard quotes side by side: what to check before you order
Ordering bollards is a specification exercise, not a shopping exercise. The order should name the line length and count, the rating with its test evidence, the type, the foundation detail, the power and controls where the bollard must move, the finish and the service routine. Our how to specify security doors guide covers the same discipline for rated doors, and the same habit serves a bollard line.
Read two quotes side by side against the same list: same line length and count, same rating with test evidence, same type, same foundation detail, same ground works with utilities survey, same power and controls, same finish, same evidence pack and same service routine. A quote that leaves out the foundations, the utilities survey, the power or the evidence is not cheaper. It is a different line, and the missing parts will be bought later, when the frontage is already in use.
Finally, order the evidence with the bollards. The test report, the foundation design and the service schedule should arrive with the bollards, and the handover pack should name the inspection routine the site will follow. A site that files the evidence on the day the bollards arrive has a record it can use for the whole life of the line. For the wider entrance the line stands in, our hostile vehicle mitigation page covers the whole line of defence.
| Factor | What changes it | What to ask |
|---|---|---|
| Line and count | Frontage length, spacing, ground | Line schedule, count, access needs |
| Rating | PAS 68 step, threat vehicle, speed | Certificate naming the exact bollard |
| Type | Fixed, removable, rising, shallow-mount | Type, drive, fail state |
| Foundations and utilities | Depth, width, services, consent | Foundation design, utility map, consent |
| Power, controls and finish | Supply, ducting, controls, coating | Power plan, control list, finish |
A cheaper quote that leaves out the foundations, the utilities survey or the service routine is not cheaper. It is a different line.
Why is there no standard price for a bollard?
No two lines are alike. The line length, the rating, the type, the foundations, the utilities and the ground works all differ from site to site, so a figure without those behind it would mislead. A quote is built from the line schedule and the rating, and the only fair comparison is between two quotes for the same line, rating and foundation.
What is the biggest single factor in a bollard quote?
The line and the rating step, taken together. A long frontage needs more bollards, more foundations and more fitting time, and each step up in rating needs a heavier post, a stronger foundation and its own test evidence. After those two, the type and the ground works are the next steps.
Does a PAS 68 bollard cost more than a standard bollard?
In general terms, yes, because they are different products. A PAS 68 bollard carries a tested post, a tested foundation and test evidence for the impact rating. A standard bollard only marks a line or stops a slow vehicle by its own strength, with no impact evidence. The two should never be compared as if they were the same bollard.
What does the foundation do to the quote?
The foundation is often the largest part of the ground works. A deep block needs more digging, more concrete and more time than a shallow raft, and ground with services needs a survey and a design of its own. A quote that leaves the foundation out is not a bollard quote at all.
What should a bollard quote include?
The bollards, the foundations, the utilities survey, the power and controls where the bollard must move, the finish, the test evidence and the service routine. Ask for each item by name before the order is placed, and compare two quotes against the same list.
What a bollard quote leaves out
A bollard quote that looks low often leaves out the work under the ground. The bollards are the part of the line people see, and the foundations, the utilities survey, the power and the finish are the parts they do not. A quote that names only the bollards is not a quote for a line. It is a quote for a set of posts, and the missing parts will be bought later, when the line is already in use.
Foundations decide whether the line holds. A deep foundation is a concrete block that spreads the load into the ground below, while a shallow foundation is a wider raft that spreads the load across the surface where depth is limited. The rating covers the bollard on its tested foundation, in tested ground, so a rated bollard in an untested foundation is not a rated line. Ask for the foundation design with the order, naming the depth, the width, the concrete and the ground it was designed for.
Power and finish belong on the same quote. A rising bollard needs power, controls and a service routine, and a fixed bollard needs a finish that holds in the street it stands in. Our PAS 68 bollards guide works through the rating on a bollard line, and our guide to choosing HVM bollards compares the bollard side of the same decision.
Mistakes that leave a bollard line unrated
The first mistake is ordering a bollard by its looks. A bollard described as heavy duty without a certificate has no proven rating at all. ISO 22343-1:2023 is the current international standard for vehicle security barriers, and it supersedes both PAS 68 and IWA 14-1. Ask for the test report under the standard the order names, not the standard alone.
The second mistake is leaving a gap in the line. ProtectUK guidance sets 1,200 mm as the maximum clear gap between barriers in a line and 500 mm as the minimum height, so check the whole frontage, not one bollard. A gap wider than 1,200 mm beside the last bollard is a gap a vehicle can use, and a bollard line rated for a 7,500 kg truck at 80 km per hour beside a fence rated for a 1,500 kg car at 48 km per hour is a line rated for the car, because the vehicle that cannot pass the bollard will drive at the fence instead.
The third mistake is forgetting the fail state. A rising bollard that must move needs power, and a line that cannot move when the power fails is a line that blocks the vehicles that need to pass. Safety devices under EN 12453 must be fitted and working before a powered bollard is put into service, and the safety devices need scheduled checks like any other part of the system.
| Quote item | What to ask | Why it matters |
|---|---|---|
| Foundations | Foundation design, depth and width | The rating covers the tested foundation only |
| Utilities survey | Map of cables, drains, gas and water | A post hole dug without a map finds services the hard way |
| Power and controls | Power supply, controls, fail state | A rising bollard that cannot move blocks the lane |
| Test evidence | Test report under ISO 22343-1:2023 | A rating string alone is not evidence |
| Service routine | Inspection and service schedule | A line that is never checked is a line nobody can speak for |
Read two quotes side by side against the same list: same line length, same rating with test evidence, same foundation detail, same ground works with utilities survey, same power and controls, same finish, same evidence pack and same service routine. A quote that leaves out the foundations, the drainage or the evidence is not cheaper. It is a different line.
Get a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.