Fire compartmentation explained: compartment walls, FD30 and FD60 doors, seals and gaps, and the schedule that keeps the fire strategy proved.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
A compartment is a part of a building that fire must not leave for a set time. Walls, floors and doors divide the building into boxes, and each box holds fire and smoke long enough for people to leave and for help to arrive. A building with no compartments lets fire run through it, so the walls matter as much as the doors in them.
Compartmentation starts with the fire strategy, and the strategy is written before the walls go up or the doors are ordered. It names each compartment, the period each wall must hold, and the doors that sit in the walls, because a door ordered without the strategy behind it may carry the wrong period for the wall it guards.
The periods a compartment needs are set out in the commercial buildings fire door regulations guide, and the fire ratings page sets out the periods in full. A compartment that holds a stair core takes a longer period than one that holds a store, because the risk behind the wall decides the period.
- FD30 / FD60Fire resistance periods tested to EN 1634-1
- BS EN 1634-3 Sa / S200Smoke control for doors on smoke paths
- 4 mmGap round a fire door leaf
- E / EW / EIIntegrity, radiation and insulation to EN 1634-1
The wall that holds fire back: what a compartment is
A compartment wall runs from floor to floor and from wall to wall, with no gap at the top and no hole left unsealed. The wall takes the period the strategy names for it, and the floor above and below takes the same, because fire that passes over the top of a wall has not been stopped by it.
Each compartment is sized for the people and the fire load inside it. A large open office takes a different layout from a hotel floor with rooms off a corridor, and a warehouse with racking takes a different layout from a school with classrooms off a hall. The use of the room decides the size of the box it sits in.
The walls that divide a building are not all the same. Some hold back flame only, and some hold back flame and heat, and the letters after the period name the difference. E names integrity, EW adds radiation, and EI adds insulation, and the letter beside the period should match the risk the room faces. The fire door regulations offices guide works through the periods for an office floor.
FD30 and FD60 by compartment: matching the period to the risk
Fire resistance is proved to EN 1634-1, with FD30 or FD60 naming the period and the letters E, EW or EI naming what the furnace measured. Most doors in a building carry thirty minutes, while doors on a compartment wall or a stair core with a heavier fire load carry sixty, and the period follows the fire load behind the door, not the size of the building.
A compartment that guards a stair core or an escape route takes the longer period, because the people using the route need the wall to hold while they leave. A compartment that guards a store or a plant room takes the period the fire load inside it demands, and a compartment that guards a room with a light fire load takes thirty minutes.
The period each door carries should come from the strategy drawn up for the building, and the strategy should be settled before the doors go on order. The fire door regulations schools guide works through the periods a school needs, and the fire door regulations hospitals guide covers the periods for a hospital.
The doors in the wall: every opening needs its own proof
Every opening in a compartment wall takes a door with the same period as the wall, because a wall that holds for sixty minutes with a thirty-minute door in it holds for thirty minutes. The door, the frame and the hardware must all carry the period the wall carries, and the test report must name all three as fitted.
A door on a compartment wall must shut on its own every time. A closer to BS EN 1154 with a power size of EN 3 or above pulls the leaf shut, and the fire door closers guide covers the sizes and the fitting. A door that stands open leaves the compartment open with it, so the closer belongs on the order beside the leaf.
Doors that must stay open through the day take a hold-open device to BS EN 1155, which lets the door shut the moment the alarm sounds. A wedge is not a hold-open device, and a door held open by one stays open when the alarm sounds. The fire door hardware guide covers the grades and the parts behind a working fire door.
Seals, gaps and the joints: the small places a compartment fails
A compartment fails at the small places first. The gap round a fire door leaf must stay at 4 mm, because a wider gap lets fire and smoke past whatever the rating on the leaf says, and intumescent seals expand at around 200 to 250 degrees to close the gap when the heat reaches them.
Joints where walls meet floors and where walls meet other walls must be sealed with a material proved for the job, because a gap at a joint is a way through the wall. The seal at the joint must carry the same period as the wall it sits in, and the material used must be the one the test report names.
Pipes, cables and ducts that pass through a compartment wall need a seal of their own, because a hole left round a pipe is a hole in the wall. Each service that passes through the wall should be named on the schedule, with the seal beside it, so nothing passes through the wall unsealed.
A wall moved after handover leaves the strategy behind
A building changes after it is handed over. A wall is moved to make a room bigger, a door is added to open a new route, and a store is turned into an office, and each change moves a line on the fire strategy. The strategy must be redrawn before the work starts, because a door ordered for the old wall may carry the wrong period for the new one, and a wall moved without the strategy behind it leaves the compartment it guarded open at the joint. The person who plans the change reads the strategy first, and the change is written on it before a single wall is touched, so the next reader sees the building as it stands now. A room that changes use takes a new period with it, because the fire load the room carries decides the period, and a store turned into an office holds a different load from the store it was.
New services bring new holes through the wall. A cable tray, a pipe or a duct that passes through a compartment wall takes a seal proved for the service it guards, and the seal on the order names the service beside it, because a fire stop fitted round a cable tray is not the same as one fitted round a single cable. The fire door regulations commercial buildings guide lists the periods for the shared parts of a public building, and the plant room fire doors guide takes the doors on the rooms that feed a building.
| Change | What it touches | What the strategy must show |
|---|---|---|
| Wall moved | Compartment line | New line, new period |
| Door added | Opening in the wall | Period, closer, seals |
| New service | Hole through the wall | Seal proved for the service |
| Room changes use | Fire load | Period the new load demands |
The round that walks the wall, joint by joint
The round that looks after a compartment walks the wall, joint by joint, and looks at each place the wall can fail. The gap round each leaf is measured, and a gap wider than 4 mm is written down beside the door it belongs to. The seals are checked for paint, because a seal painted over cannot expand when the heat reaches it, and the joints where walls meet floors are checked for a seal that carries the same period as the wall. The fire door regulations offices guide gives the periods for an office floor, and the fire door inspection checklist says what each round should look at. The wall above a suspended ceiling is checked too, because a wall that stops at the ceiling leaves fire a way over the top of it.
A fault found on the round is written down the same day, with the wall, the door and the joint named beside it, so the repair follows the fault and the compartment never stands open. For leaves that carry a fire proof beside a forced entry proof, the security door maintenance checklist names what each round should cover. Send any fault the round finds with the door schedule, and the security door enquiry checklist states what the enquiry must hold so the replacement door is quoted with the period and the seals the wall needs.
Smoke on a compartment line: Sa, S200 and the doors that hold it
Smoke kills more people than flame, and a compartment must hold smoke as well as fire. A door on a smoke path takes FD30S, with the seal proved to BS EN 1634-3, to Sa for smoke at room temperature and S200 for smoke at 200 degrees Celsius, and the seal that holds the smoke back must be the seal the test report names.
Smoke control doors sit on the routes people use to leave, and they must shut on their own and seal round the leaf. The smoke control doors guide covers the doors that hold smoke back while people move past them, and the seal round the leaf must be checked on every round.
A glazed door on a compartment line takes glass proved with the frame and the fixings to EN 1634-1, because a pane in the wrong frame carries no proof at all. The fire rated glazed doors page covers the glazed leaves that carry the higher periods, and the fire rated steel doors page covers the steel leaves.
Plant, services and the holes through the wall
Plant rooms sit inside compartments of their own, because the fire load in a plant room is higher than the load in the rooms around it. A plant room door takes FD60 where the load behind it is heaviest, and the plant room fire doors guide covers the doors on the rooms that feed a building.
Ducts that carry air through a compartment wall take a damper that shuts when the heat reaches it, because a duct left open carries fire and smoke from one compartment to the next. The damper belongs on the schedule with the duct, and the period it holds must match the wall it passes through.
Cables and pipes that pass through a wall take a fire stop where they cross it, and the fire stop must be the one proved for the service it seals. A fire stop fitted round a cable tray is not the same as one fitted round a single cable, so the seal on the order should name the service it guards.
The drill after handover makes a hole the strategy has never seen
A building is handed over with its compartment walls sealed, and then a later trade arrives with a drill. A cable for a new till, a pipe for a new sink, or a duct for a new fan needs a way through the wall, and the drill makes it in an afternoon. The person with the drill has never seen the fire strategy, and the person who holds the strategy never hears about the hole, so the hole stays open while the wall beside it still carries its period on paper. A hole through a compartment wall is a hole in the compartment, whatever made it, and the wall is only as strong as its weakest opening.
The seal that closes the hole must match the service that passes through it, because a stop proved round a tray differs from a stop proved round one cable, and paint on a seal stops it swelling when the heat reaches it. An intumescent seal swells shut at around 200 to 250 degrees, and the order pairs each seal with its service, so the seal that arrives fits the hole it must close. The damper in a duct must hold the same period as the wall it passes through, because a damper that runs out before the wall does leaves the compartment open at the duct. A public building’s shared parts take their periods from the fire door regulations guide covering commercial buildings, and the rooms that feed a building take their doors from the plant room fire doors guide.
| Trade | Hole made | Seal it needs |
|---|---|---|
| Electrician | Cable through the wall | Fire stop proved for the cable |
| Plumber | Pipe through the wall | Fire stop proved for the pipe |
| Data fitter | Cable tray through the wall | Fire stop proved for the tray |
| Ventilation fitter | Duct through the wall | Damper that shuts on heat |
Every hole needs an owner before the drill starts
No drill touches a compartment wall until the hole has an owner. The owner writes the hole on the strategy, names the service that will pass through it, and orders the seal proved for that service, and the work is not signed off until the seal is fitted and the hole is closed. On the same visit the round measures the gap round each leaf in the wall, and any gap past 4 mm is noted against its door. Office floors take the periods the fire door regulations offices guide gives them, and each round takes its list from the fire door inspection checklist.
The round writes each hole down the same day, naming the wall, the service and the trade, so the repair can follow the fault without delay. The record of every hole is kept with the strategy, so the next trade to drill sees the holes already there before making a new one. Doors that must hold fire and forced entry together take their round from the security door maintenance checklist. Take the list of holes with the order, and let the security door enquiry checklist show which columns the schedule must carry, so a new door arrives with the seals its wall needs.
The fire strategy on paper: who writes it and who checks it
The fire strategy is the document that holds the whole compartment plan together. It names each compartment, the period each wall must hold, the doors in each wall, and the routes people use to leave, so the next reader can see the plan without walking the building.
The strategy is written by the person who designs the building, and it is checked by the person who runs it. When the building changes, the strategy must change with it, because a wall moved or a door added without the strategy behind it leaves the plan out of date.
Large buildings that hold crowds carry extra duties under Martyn’s Law, with a standard tier from 200 to 799 people and an enhanced tier at 800 and above. The Martyn’s Law guide for premises sets out the duties a venue carries, and the fire strategy must show how the building empties.
One schedule for the whole building: every compartment on one list
Put the order together as one list with a line for every compartment in the building, naming the walls, the doors, the periods and the seals beside each one, so the door that arrives matches the door that was proved. A schedule that names one door for the whole building leaves the fitter to guess which leaf goes where, and a guess is not a proof.
Go through each quotation line by line against the list before the order is placed. A part that is missing from a quotation still has to be bought, and fitting it round a door that is already hung costs more than ordering it with the door. The security door cost factors guide works through what each step up the scale adds.
Keep the test reports with the doors from the day they arrive, so the proof stays with the leaf it belongs to, and the how to specify security doors guide sets out the columns the schedule needs. The fire door inspection checklist names what each round should look for, and the security door maintenance checklist covers the doors that must hold both fire and forced entry.
| Position | Compartment | Door | What to check |
|---|---|---|---|
| Stair core | Escape route | FD60 fire door | Closer, seals, gap |
| Corridor | Escape route | FD30 fire door | Closer, seals, latch |
| Plant room | High fire load | FD60 fire door | Seals, closer, damper |
| Store | Fire load room | FD30 fire door | Seals, closer, gap |
| Smoke path | Smoke control | FD30S fire door | Seal, closer, release |
A compartment wall holds only as long as its weakest opening, so the door, the seals and the joints must all carry the same period as the wall.
What is fire compartmentation?
It is the division of a building into compartments by walls, floors and doors, so fire and smoke are held in one part of the building long enough for people to leave and for help to arrive.
What period do compartment doors need?
The same period as the wall they sit in. Most doors carry FD30, and doors on a stair core or a compartment wall with a heavier fire load carry FD60, with the period following the fire strategy.
What breaks a compartment?
A door left open, a seal painted over, a gap wider than 4 mm round the leaf, or a hole through the wall left unsealed. Any one of them leaves the compartment open at that point.
Do compartment walls need checking?
Yes, on the routine the fire risk assessment sets. Each round looks at the doors, the closers, the seals and the gaps, and each fault is written down the same day.
Who writes the fire strategy?
The person who designs the building writes it, and the person who runs the building checks it. When the building changes, the strategy must change with it.
Get a free quote
Related
More in guides for specifiers