Data centre physical security: doors, glazing, HVM and shielding by zone

Data centre physical security by zone: boundary HVM, envelope doors and glazing, lobby control, data hall ratings, shielding, and the standards behind each one.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Data centre physical security works in zones: boundary, building envelope, lobby, corridors, data hall and plant. Each zone earns the rating its contents justify, with hostile vehicle mitigation outside, access control at entries and rated doors and glazing deeper in. Specify per zone, never one rating for the whole site.

  • Zoning principleProtection rises towards the data hall, like the layers of an onion
  • BoundaryHVM barriers and fencing rated to ISO 22343-1
  • EnvelopeLPS 1175 doors and LPS 1270 glazing at the penetrations
  • Data hallThe highest door ratings, with logged and supervised access

The zone model: why one rating never fits the whole site

A data centre holds assets of very different value in different rooms. The boundary keeps vehicles and intruders at distance, the envelope resists entry to the building, and the data hall protects the servers themselves. Giving every door the highest rating wastes budget where the threat is low and can slow daily operations for staff who need to move.

The zone model matches the product to the room. Approach roads get vehicle mitigation, the lobby gets entrance control, corridors get rated doors that slow movement, and the data hall gets the strongest doorsets with full audit trails. Each layer buys time, and each layer is specified for what it guards rather than for the site as a whole.

Existing buildings can adopt the same model in stages. A common sequence starts with the boundary and the lobby, where the gains are largest, then works inward to corridors and plant rooms as budgets allow. Each stage should leave the next one possible: cable routes for future readers, frame sizes that accept deeper doors, and a lodge layout with room for another gate.

Zone by zone: what each area needs

Start at the boundary and work inward. The table below sets out the six zones and the products that typically guard each one. Treat it as a starting point: the threat assessment for the site decides the final ratings, and the data centres sector page gives the wider threat picture.

Zone Main products Rating references to consider
Boundary and approach roads HVM barriers, bollards, fencing, gates ISO 22343-1 vehicle impact ratings
Building envelope Rated doors, security glazing, louvres LPS 1175, LPS 1270, EN 1627
Lobby and security lodge Speed gates, turnstiles, interlocked portals Access control with anti-tailgating
Corridors Rated internal doors LPS 1175 SR2 or above
Data hall High-security doorsets, cages LPS 1175 SR3 and above, logged access
Plant rooms Rated doors, louvred doors LPS 1175 and fire ratings
Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Rating zone by zone: the door that fits each area

A data centre never takes one rating for the whole site, because each zone faces a different risk. The boundary meets vehicles, the lobby meets visitors, the corridors move staff between rooms, and the server halls hold the equipment that cannot be replaced, so each zone takes its own rating, and the schedule carries one line per zone, with the building, the position and the rating named on it.

The rating for a zone comes from the tools the door must hold against and the minutes it must hold for. Category B tools are the light hand tools, screwdrivers, pliers and hand saws, and three minutes against them gives B3. Category C tools are the heavier hand tools, crowbars, drills and chisels, and five minutes against them gives C5. Category D tools are the heavy tools, sledgehammers, disc cutters and jigsaws, and ten minutes against them gives D10. LPS 1175 Issue 8.2, dated September 2024, is the current issue, and the labels it carries are B3, C5 and D10, which replace the earlier SR2, SR3 and SR4 on older drawings.

Stealth is a separate threat from forced entry, and a zone that faces it needs a rating for it beside the forced entry rating. LPS 2081 tests a doorset against an attack that stays quiet, with SRA at one minute and SRB at three, and the minutes follow the zone: a guarded lobby spots the attempt quickly, while an unwatched plant room gives the attack longer to work. A doorset proved to LPS 2081 alone has said nothing about hand tools, so the forced entry rating sits beside it on the same line.

The evidence for each zone: one file, one schedule

The boundary takes the vehicle rating, and the rating belongs on the barrier, not on the door behind it. ISO 22343-1 tests a barrier against a moving vehicle, and the rating names the vehicle mass, the speed, the angle and how far the vehicle travels past the line, from a 1,500 kg car to a 30,000 kg truck at 48, 64 or 80 km/h. ProtectUK guidance caps the clear gap beside a barrier at 1,200 mm and sets the minimum height at 500 mm, so the gap and the height belong on the schedule beside the rating. Our HVM planters and street furniture guide covers the boundary line, and the server room doors guide covers the halls inside.

Inside the building, the rating follows the room. A server hall door takes the highest rating on the site, because the equipment behind it cannot be replaced, while a staffed lobby takes a lower one, because the people beside it spot the attempt quickly. PAS 24 covers the enhanced security doorset, and EN 1627 sets its own classes, RC1 to RC6, each with its own test report behind it. LPS 1175 and EN 1627 are separate scales, each with its own test, so a schedule that asks for one by naming the other has asked for a proof that does not exist. Our LPS 1175 vs EN 1627 guide compares the two scales, and the plant room door requirements guide covers the rooms between the lobby and the halls.

Zone Rating What to check
Boundary and approach roads ISO 22343-1 Vehicle mass, speed, gap 1,200 mm, height 500 mm
Lobby and entrance control B3 or PAS 24 Access control, release on alarm
Corridors and plant rooms B3 or C5 Rating by zone, seals and closers
Server halls C5 or D10, SRB where needed Highest rating, evidence on the whole doorset

File the evidence zone by zone, with the test report, the rating and the position on the same line, so the next reader can see why each door carries the rating it does.

HVM at the boundary and approach roads

Vehicles are both a delivery method and a weapon. Approach roads, drop-off points and service yards need barriers rated to ISO 22343-1, which states the vehicle mass, speed, angle and penetration in the rating. PAS 68 and IWA 14-1 describe the same test idea, and the current ISO standard supersedes both. Our vehicle impact ratings guide explains how to read these ratings.

Place the vehicle line before the pedestrian line. Security bollards and barriers should force hostile vehicles to stop while staff and visitors pass through a separate controlled entrance. Coordinate the hostile vehicle mitigation layout with the landscape so the protection is continuous, with no gap a vehicle could use.

The lobby, security lodge and entrance control

The lobby is where identity is checked. Pedestrian speed gates and turnstiles manage the flow of staff, interlocked security portals handle visitors one at a time, and the security lodge watches both. The doors here need to work with the access control, not against it: held-open alarms, forced-door detection and integration with the entry system matter as much as the physical rating.

Tailgating is the main failure at this layer. A rated door propped open for convenience protects nothing. Specify doors with monitored status and make the procedure for escorted visitors part of the handover, so the hardware and the routine reinforce each other.

Corridors, plant rooms and the secondary envelope

Inside the building, corridors divide the site into compartments. Rated doors on corridor crossings slow an intruder who has passed the lobby and give response teams time to act. Plant rooms deserve the same attention: power and cooling are single points of failure, and their doors and louvres should carry forced-entry and fire ratings that match their importance.

Do not forget the roof and the service penetrations. A data centre is entered through its weakest opening, which is often a louvred vent or an unrated roof hatch rather than the front door. Every penetration of the envelope should have a rated product or a compensating measure, and LPS 1175 doors are the usual answer for personnel openings.

Generator and UPS rooms sit between plant and data hall in importance. Their doors need the forced-entry rating of a plant room and the access logging of a data hall, because a failure here stops the whole site. Treat fuel deliveries as a vehicle movement too, and route them through the HVM line rather than around it.

Shielding, EMP and RF considerations

Some data centres need electromagnetic protection as well as physical protection. EMP shielding and shielded rooms limit RF emissions and incoming interference, and EMP-rated construction addresses electromagnetic pulse threats for the most critical sites. These are specialist builds with their own test regimes, specified alongside the forced-entry ratings rather than instead of them.

Shielding and forced-entry ratings can live in one doorset, but only if the combination has been tested. A shielded door without a security rating, or a security door with untested shielding added, leaves a gap in the evidence. Specify the combination and ask for test evidence that covers both performances on the same construction.

Standards context: NPSA guidance, EN 50600 and ISO 27001

The NPSA publishes data centre security guidance that works through seven areas of risk, from the physical perimeter and the buildings to the data hall, the meet-me rooms, people, the supply chain and cyber security. It is guidance for owners and operators, not a product standard, and it helps to structure the threat assessment that the product schedule answers.

EN 50600 is the European standard series for data centre facilities, and part 2-5 addresses security systems, including protection classes for different areas of the site. ISO 27001 is an information security management standard: it requires physical security controls as part of the management system but does not rate doors or barriers. Use each document for what it is: NPSA for the risk picture, EN 50600 for the facility design, ISO 27001 for the management system, and the product standards for the hardware. See all our guides for more.

Seven areas, one schedule. NPSA guidance names seven areas of risk for data centres. Check that the product schedule answers each of them before it is issued.

Which LPS 1175 rating suits a data hall door?

It depends on the threat assessment, but data hall doors commonly sit at SR3 or above, with logged access control. The rating must appear on the doorset’s own certificate.

Do we need HVM if the site is low profile?

Approach roads and service yards still take vehicle traffic. Even where the hostile vehicle threat is low, rated barriers manage accidents and unauthorised access.

What does EN 50600-2-5 cover?

Security systems for data centres, including protection classes for site areas. It guides facility design rather than rating individual products.

Is ISO 27001 a product standard?

No. It is a management system standard for information security. It calls for physical controls, but the doors and barriers are rated to their own product standards.

How should the meet-me room be handled?

As a high-risk shared space with strictly controlled access, rated doors and full logging, since third-party engineers work there.

Can one doorset carry security, fire and blast ratings?

Yes, if the combination has been tested. Ask for evidence covering each claimed performance on the same construction.

Planning the zones for a data centre?Send the layout and we will map rated doors, glazing and HVM to each zone.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.