Flat Entrance Doors: PAS 24 and Fire Rated

One doorset for a flat must hold a PAS 24 security rating and an FD30S fire rating, with the letterplate, viewer and closer tested as part of the same assembly.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

The door to a flat has two jobs at once. From the corridor it must resist a forced entry attempt, and from the flat it must hold back fire and smoke long enough for the stay-put strategy to work. One doorset carries both duties, and both must be tested on the same construction, with the same locks, closer, seals, letterplate and viewer that will be fitted on site.

A flat entrance door is not a communal entrance door and it is not an ordinary internal door. It sits on the line between one home and the shared parts of the building, so it answers to two sets of rules and two different kinds of threat. The security rating protects the people inside the flat. The fire rating protects the people outside it, in the corridor and on the stairs. Neither rating means much without the other, and neither survives a change to the hardware after the door is fitted.

  • FD30S30 minutes of fire integrity plus smoke seals, the normal requirement for a flat entrance door onto common parts.
  • PAS 24The security test behind Approved Document Q for doors that give access into a flat from the common parts.
  • 260 by 40 mmThe largest letterplate aperture Approved Document Q allows, with a flap or feature to hinder reaching through.
  • Checked every yearIn buildings over 11 metres, the responsible person checks flat entrance doors annually under the Fire Safety (England) Regulations 2022.

One door, two jobs: security on the corridor side, fire on the flat side

Each flat is its own fire compartment. The walls and floor around it hold fire back, and the entrance door is the one opening in that compartment that people use every day. When a fire starts inside a flat, the door is what keeps smoke and flame in the flat while the rest of the building stays safe. That is the stay-put strategy: residents in other flats stay where they are because the compartment holds.

From the corridor side the same door faces a different threat. Anyone in the building can reach it, along with visitors, delivery workers and anyone who has talked their way past the communal entrance. The lock, the frame and the fixings must resist a manual attack, because the door is the only barrier between the corridor and the home behind it.

The two duties pull in opposite directions. Security wants the door shut, locked and hard to open from outside. Fire safety wants it to close on its own every time, and wants the people inside to be able to get out fast. The hardware that resolves that tension is the lock and the closer working together, tested as one doorset. A lock fitted after the fire test, or a closer fitted after the security test, is a change to the tested assembly, and the evidence may no longer match. For how two ratings are proved on one doorset, see the dual certification guide, and for what the fire classifications mean, see the fire ratings page.

What the door must do in daily use

A flat entrance door is opened and shut dozens of times a day. Residents come and go with shopping, prams and children. Deliveries arrive. The door is pushed, pulled, kicked shut and held open with a foot while a bag is carried through.

The closer is the part that takes the most punishment. It must shut the door fully from any angle, every time, and it must do so without slamming so hard that it shakes the frame loose. When a closer weakens, the door stops latching, and a door that does not latch is a door that neither rating can stand behind. The closer is not an accessory. It is part of the rated assembly, and it needs the same attention as the lock.

Propping the door open is the most common way a flat entrance door fails. A wedge, a hooked-open closer or a door held on the latch lets smoke travel along the corridor and lets an intruder walk in unchallenged. Residents prop doors open for good reasons, usually because the closer is too strong or the door is heavy, so the answer is a closer that is set correctly and a door that is easy to open, not a lecture. If the door is hard to open, the setting is wrong, and it should be adjusted before someone wedges it.

Wear shows first on the seals, the hinges and the lock case. Seals harden and shrink, hinges drop, and the latch stops meeting the keep. None of this is visible from the corridor, which is why the door needs a named person checking it on a written schedule rather than waiting for a resident to report a problem. For what a check looks at, see the fire door inspection checklist, and for the choice between steel and timber leaves, see steel versus timber fire doors.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Approved Document Q and Approved Document B: the two documents that shape the door

Two documents from the Building Regulations shape a flat entrance door, and each one covers only half of the job. Approved Document Q covers security in dwellings. Approved Document B covers fire safety. A doorset that satisfies one and ignores the other is not a compliant flat entrance door.

Approved Document Q has applied since 1 October 2015 to new dwellings, including dwellings formed by a material change of use. Requirement Q1 covers easily accessible doors that provide access into a flat from the common parts of the building, which is exactly what a flat entrance door is. Secure doorsets should be manufactured to a design shown by test to meet PAS 24, or designed and manufactured to the Appendix B route in the same document. Standards that give similar or better performance are also acceptable, including LPS 1175 security rating 2 and LPS 2081 security rating B. The detail of the test and the certificates sits on the PAS 24 requirements page.

Approved Document B sets the fire side. A flat entrance door opening onto common parts is normally an FD30S doorset, self-closing, with smoke seals. The period comes from the fire strategy for the building, not from the security rating, and the two documents never trade against each other: a high security rating does not shorten the fire period, and a long fire period does not excuse a weak lock. Building control checks both, and the handover pack should hold the evidence for both.

The two documents also differ in scope. Approved Document Q applies to new dwellings, so an existing block replacing its doors is not automatically bound by it, though the replacement doors are usually specified to the same standard because the risk has not changed. Approved Document B applies to new and altered work, and the ongoing duties under the fire safety legislation apply to the building for as long as it is occupied. For the building entrance that sits below the flat doors, see the communal entrance doors guide.

The fire side: FD30S, the closer and the seals

FD30S means 30 minutes of fire integrity with smoke control. The S stands for smoke seals, which limit the leakage of cold smoke at normal temperatures, tested to BS EN 1634-3. The leaf, the frame, the intumescent strips and the cold smoke seals work as one assembly.

The self-closing device is part of the requirement, not an optional extra. Approved Document B expects fire doorsets to flat entrances to be fitted with a self-closing device, and the door must close fully into the frame from any opening angle, unaided, and latch where a latch is fitted. A closer that leaves the door standing open by a few millimetres has failed, even if it looks as if it is working. The gap matters because smoke finds gaps first, and a door that does not shut is a hole in the compartment wall.

Gaps around the leaf are kept small so the seals can do their work. A door that has dropped on its hinges, or a frame that has moved, opens gaps that no seal can bridge. The check is simple: shut the door and look at the gaps. If light shows through, the seals cannot work.

Intumescent strips expand in heat and seal the gap around the leaf. Cold smoke seals, usually a brush or fin, stop smoke before the heat arrives. Both sit in the frame or the leaf edge, and both must be the ones named in the test evidence. A seal replaced with a different profile is a change to the tested assembly. Fire rated steel doors follow the same pattern, and the fire ratings page sets out what E, EW and EI mean where the fire strategy asks for more than integrity.

Letterplates, viewers and chains in the tested doorset

A flat entrance door usually carries a letterplate, a viewer and a chain or limiter, and each of them sits inside the tested doorset. None of them is a separate product that can be swapped after the test. A letterplate cut into a tested leaf after the event is a hole in a fire door and a weak point in a security door, and the evidence will not cover it.

Approved Document Q sets the letterplate rules. The aperture must be no larger than 260 mm by 40 mm, and the letterplate must be located or designed to hinder anyone attempting to remove keys with sticks or to insert a hand, for example by incorporating a flap or other features to restrict access. The Door and Hardware Federation technical specification TS 008 is the test for letterplate security, and letterplates meeting it have been shown to protect against those attacks. A letterplate on its own cannot be a PAS 24 product, because PAS 24 tests the whole doorset. The letterplate is judged as part of the door it sits in.

Fire adds a second condition. A letterplate in a fire door must be part of the fire-tested assembly, with intumescent protection that matches the test evidence. An ordinary letterplate fitted to an FD30S leaf leaves a gap that smoke and flame can use, and the rating will not survive it.

Approved Document Q also asks for a door viewer on the main doors for entering a dwelling, unless other means exist to see callers, such as clear glass within the door or a window next to the doorset. The same doorset should also have a door chain or door limiter. The chain matters because it lets a resident open the door a little and check who is there without giving access. In sheltered housing the chain is not always appropriate, because a warden may need emergency access to residents, and in that case an electronic audio-visual door entry system can identify visitors instead.

One certificate for two ratings: what the evidence must show

Two ratings on one doorset means two sets of evidence, and both must name the same construction. The fire classification to EN 1634-1 and the security test to PAS 24 must each have been carried out on the same doorset, with the same leaf, frame, ironmongery, closer, seals, letterplate and viewer. A fire certificate for one construction and a security certificate for another do not add up to a door that carries both ratings.

The certificate must name the exact doorset, its sizes and its configuration. A certificate for a different model, a different size range or a different glazing arrangement does not cover the order, even if the product name sounds similar. The third-party listing is the record a checker asks for when the rating has to be proved, and it should be kept with the building records rather than filed with the supplier.

Ironmongery is where orders most often drift from the evidence. Every lock, closer, hinge, letterplate and viewer must be the ones named in the test evidence. A lock case changed for a cheaper equivalent, a closer swapped for a different model, or a viewer fitted in a different position can void both ratings at once. The submittal should be compared with the evidence line by line before the order is signed, and where the evidence is missing or does not match, the order should wait. For the changes that cause problems after installation, see keeping an LPS 1175 rating valid, and for the wider specification process, see how to specify security doors.

Inspection in blocks: what the 2022 regulations ask for

Once the doors are in, the law keeps watching them. The Fire Safety (England) Regulations 2022 place duties on the responsible person for the building, and flat entrance doors are named in those duties. The Fire Safety Act 2021 confirmed that the duties extend to the structure, the external walls and the flat entrance doors of a building.

In residential buildings over 11 metres, the responsible person must check communal fire doors at least every three months, and must use best endeavours to check flat entrance doors at least every year. Best endeavours means the check is attempted for every flat, and access is arranged with residents, rather than the check being skipped because a flat was empty on the day. Residents should also be given information on the importance of fire doors to the safety of the building, so that a removed closer or a wedged door is understood as a safety matter, not a housekeeping one.

The check itself is short and practical. The closer must shut the door fully from any angle and latch it. The seals must be intact, with no gaps, splits or missing lengths. The gaps around the leaf must be small and even. The leaf and frame must be free of damage, and the ironmongery must be the ironmongery named in the evidence. For the wider duties on the responsible person, see the fire door regulations guide, and for a check sheet to use on site, see the fire door inspection checklist.

What the 2022 regulations do not cover

The Fire Safety (England) Regulations 2022 set the inspection duties for flat entrance doors and communal doors in blocks. They do not set the fire rating, the door construction or the hardware. Those come from the fire strategy, the test evidence and the doorset specification, and the regulations only ask that the doors are checked.

They do not cover the flat itself. The regulations ask for checks on the communal doors every three months and on flat entrance doors every year, but the doors inside a flat are the leaseholder’s, and the responsible person cannot demand entry to check them. A flat entrance door that fails its annual check still needs the leaseholder’s agreement to fix.

They do not cover the communal areas beyond the door. A corridor with a compliant door and no working emergency lighting, no clear escape route or a blocked stair is still not safe. The regulations ask about the doors, and the fire risk assessment must cover the rest of the escape route.

They do not prove the door was right in the first place. A check records what the inspector saw: the gaps, the seals, the closer and the latch. It cannot prove the leaf, the frame and the hardware were tested together. A door that passes its checks can still sit outside its test evidence if the leaf was swapped or the hardware was changed after fitting.

They do not cover the wall beside the door. The regulations ask about the door, not the corridor wall, the head detail or the riser cupboard beside it. A flat entrance door rated FD30S in a wall that cannot hold fire for 30 minutes gives a 30 minute opening in name only. Check the wall with the door.

Mistakes that break a block-wide door order

Ordering for a whole block means ordering one doorset many times over. A mistake in the first order repeats on every floor.

Mistake Why it fails What to do instead
One doorset ordered, many leaves fitted A leaf fitted without its tested frame and seals is not the tested doorset. Order the full doorset for every flat, not leaves in bulk.
Closer sized for a show flat A closer that suits a light leaf will not close a heavy glazed leaf. Size the closer to BS EN 1154 for the heaviest leaf in the block.
Seals left off the schedule Intumescent and smoke seals are part of the doorset, not extras. List the seals and the 4 mm gap on every order.
No record of which flat has which door An inspection cannot check a door it cannot identify. Record the door, the hardware and the test report by flat number.
Checks with no repair plan A failed check with no repair date stays failed until the next visit. Agree the repair date when the check is written up.

Keep the evidence with the block. The test report, the classification and the hardware schedule should sit with the building records, so the next inspection has something to check each door against. For the checks themselves, see our fire door inspection checklist, and for the commercial rules that sit beside the 2022 regulations, see our fire door regulations for commercial buildings guide.

Ordering for a whole block: one doorset, repeated

Blocks of flats are usually ordered as a programme, not as single doors. One tested doorset, repeated across every flat, keeps the specification simple and the spares shelf short. The same lock case, the same closer, the same seals and the same letterplate on every door means one set of spares, one ironmongery schedule and one certificate to check. It also means a fault found on one door is a fault to look for on all of them.

The schedule should name everything. Leaf size and handing for each flat, the fire and security ratings, the lock and cylinder, the closer model, the seals, the letterplate, the viewer and the chain. For the mistakes that most often weaken an order, see security door specification mistakes.

Keying deserves a line of its own. Flat entrance doors in one block usually share a keying plan, so that the management key opens the common parts and each resident key opens only their own flat. The plan should be agreed before the order, with a record of which key opens which door, and a procedure for changing a cylinder when a key is lost.

Replacement cycles should be planned before the doors fail. Closers, seals and lock cases wear out well before the frame does. The handover pack should hold the certificates, the ironmongery schedule and the keying record, so that the next specifier knows what the opening was built to achieve. For the residential context, see the residential sector page and residential security doors.

Requirement What it means Where it is set
Security Resists manual attack to PAS 24 Approved Document Q
Fire 30 minutes integrity, FD30S Approved Document B
Smoke Cold smoke seals limit leakage, tested to BS EN 1634-3 FD30S, Approved Document B
Viewer and chain See the caller before opening the door Approved Document Q, paragraph 1.4
Letterplate No larger than 260 by 40 mm, with a flap Approved Document Q, paragraph 1.3

A flat entrance door is the compartment line for one home. If it cannot close, latch and seal, neither rating counts.

Is a flat entrance door the same as a communal entrance door?

No. A flat entrance door serves one flat from the corridor, while a communal entrance door serves the whole building from outside. The two doors answer to different threats and different hardware, and they are specified separately. For the building entrance, see the communal entrance doors guide.

Does every flat entrance door need to be a fire door?

Normally yes where the door opens onto common parts. The usual requirement is FD30S, self-closing, with smoke seals. The period comes from the fire strategy for the building and the fire risk assessment, not from the security rating.

Can one door carry PAS 24 and FD30S together?

Yes, when the exact combination has been tested on the same doorset construction. One certificate never stands in for the other. For how the two ratings are proved together, see the dual certification guide.

Who checks flat entrance doors after handover?

The responsible person for the building, under the Fire Safety (England) Regulations 2022. In buildings over 11 metres, flat entrance doors are checked at least every year on a best-endeavours basis, and communal fire doors every three months.

What happens if the closer is removed or the door is wedged open?

The fire and smoke performance is lost, because the door cannot shut and seal on its own, and the security performance goes with it, because the door no longer latches. The closer must stay fitted and the door must shut fully from any angle.

Replacing flat entrance doors across a block?Send the block schedule and we will match one tested doorset to every flat.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.