Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender
One tender can name three kinds of evidence at once: the mistakes buyers make when LPS 1175, PAS 24 and Secured by Design sit in one schedule.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
One tender can name three different kinds of evidence at once: a graded LPS 1175 rating, a pass or fail PAS 24 test, and a Secured by Design listing. This guide names the mistakes buyers make when the three sit in one schedule.
- PAS 24Residential, pass or fail
- LPS 1175Graded A1 to H20
- SBDA scheme, not a test
- Issue 8.2Current LPS 1175 issue
Treating “LPS 1175 or PAS 24” as a choice between equals
The first mistake is writing “LPS 1175 or PAS 24” as if the two were interchangeable. They are not. PAS 24 gives a pass or fail result for doorsets and windows, written for homes and buildings at comparable risk, and it answers an opportunist burglar. LPS 1175 is a graded rating from A1 to H20, where the letter names the tool kit and the number names the delay in minutes, and it answers a determined attacker.
The NPSA Forced Entry Standards Guide maps the threat to the standard: the opportunist burglar points to PAS 24, while serious organised crime, paramilitary attack and politically sensitive sites point to LPS 1175. The guide predates Issue 8.2, so its LPS 1175 entry reads Issue 8. The tender should name the current issue, Issue 8.2, dated September 2024.
Write the clause around the threat, not the standard. Name the threat first, then the standard that answers it. The LPS 1175 versus PAS 24 guide pairs each standard with the threat it answers, and the forced entry, ballistic and blast guide shows how the three rating families differ.
Naming Secured by Design as if it were a test
The second mistake is writing “tested to Secured by Design” or “SBD rated”. Secured by Design runs a scheme, not a test, and it has no test of its own. It is the official security initiative of the UK Police Service, which owns it, and it runs an accreditation scheme called Police Preferred Specification for products that have met a recognised security standard.
For a residential door, the test behind the SBD listing is usually PAS 24. The product must hold full certification from an independent third-party body that UKAS recognises, or testing and certification from an approved body, for example Sold Secure or Thatcham. SBD also requires regular re-testing and an annual inspection of the manufacturing facility. A clause that asks for SBD without naming the test underneath it cannot be answered with evidence.
Write both names in the clause: the test and the scheme. “PAS 24 tested, with Secured by Design listing” can be answered. The Secured by Design guide explains how the scheme works, and the Secured by Design listing guide runs through the check on a listing on the SBD website.
Asking for PAS 24 on a commercial door
The third mistake is asking for PAS 24 on a door that faces a commercial threat. PAS 24 is written for homes, and it ranks below LPS 1175 on the threat scale. A commercial, cash-handling or critical site should name LPS 1175 at a grade the threat assessment calls for instead.
The error usually comes from copying a clause from a housing tender into a commercial one. The housing tender was right to name PAS 24, because the doors were flat entrance doors in dwellings. The commercial tender that copies it asks for the wrong evidence.
Check each opening against its threat before the schedule is written. The ten mistakes guide names the errors buyers keep making, and the LPS 1175 ratings page lists the grades A1 to H20.
One rating for every opening in the schedule
The fourth mistake is writing one rating for every opening. A schedule that asks for the same grade on the main entrance, the plant room, the bin store and the roof access has not been matched to the threat at each opening. The rating should follow the threat at each opening, not the building as a whole.
The old Security Rating scale maps onto the grades: SR1 sits at A1, SR2 at B3, SR3 at C5 and SR4 at D10. A schedule that names SR3 for every door asks for five minutes against the C tool set everywhere, including doors that face no threat at all. Write the grade per opening, with the threat beside it, so the supplier can see why each grade was chosen.
Give each opening its own line in the schedule, with its own threat, its own standard and its own grade. The ten-step LPS 1175 guide puts the scope into the specification at the start, and the SBD, NPSA and LPCB guide carries a table for the three bodies.
| Opening | Threat | Name this | Do not name |
|---|---|---|---|
| Flat entrance door | Opportunist burglar | PAS 24, with SBD listing | LPS 1175 grade |
| Office entrance | Determined attacker | LPS 1175, grade to threat | PAS 24 alone |
| Data centre door | Serious organised crime | LPS 1175, grade to threat | PAS 24 or SBD alone |
| School door | Forced entry | LPS 1175 or PAS 24 | One grade for all doors |
| Cash handling door | Ballistic and forced entry | BR or FB, with LPS 1175 as well | SBD listing as the only proof |
Asking for SBD where no SBD product exists
The fifth mistake is asking for an SBD listing on a product the scheme does not cover. SBD describes itself as the only route to police recognition for security products in the UK, and its accreditation rests on a recognised security standard for the product type. A blast door is proved by its blast test, and a ballistic door by its ballistic test.
The error shows up when a tender copies an SBD requirement across a whole schedule without checking each line. The residential doors in the schedule can hold an SBD listing, and the blast doors need their blast test evidence instead, so a supplier that answers honestly must leave part of the schedule blank.
Check the scheme’s scope line by line before the tender goes out. Where SBD applies, name it with the test underneath. Where it does not, name the test that does apply. The LPS 1175 certificate guide shows how to check a certificate on Red Book Live, and the NPSA catalogue lists the products the NPSA has assessed.
Mixing issues and dates in one schedule
The sixth mistake is mixing issues and dates. LPS 1175 is now at Issue 8.2, dated September 2024, and a schedule that names Issue 8, or that names no issue at all, lets a supplier answer with evidence to a superseded issue. The gap only shows up during an audit or after an incident.
PAS 24 has the same trap. The NPSA guide names PAS 24:2022, and older references to PAS 24:2016 still appear in copied clauses. A schedule that names PAS 24 with no year lets the supplier choose the older test. Name the issue and the year for every standard in the schedule, and check the listing under the current issue before the order is placed.
Write the issue into every clause, not only into the first one. A schedule that names Issue 8.2 for the doors and leaves the windows unnamed has left half the evidence open. The tender response checklist shows the supplier side, and the installation handover guide shows what the buyer checks when the product arrives on site.
A tender that names three standards must say what each one proves. A clause that names a standard without saying what it proves cannot be answered.
Scoring three kinds of evidence with one criterion
The seventh mistake is judging three kinds of evidence with one criterion. An LPS 1175 rating is proved by a certificate and a live listing on Red Book Live. A PAS 24 result is proved by a test report. An SBD listing is proved by a company page and a product entry on the SBD website. A single criterion such as “evidence of security performance” cannot score all three, because the evidence is different in kind.
Split the criterion by evidence type. Score the LPS 1175 lines on the certificate and the listing, the PAS 24 lines on the test report, and the SBD lines on the company page and the product entry. Say what a pass looks like for each one. A claim with no document behind it scores nothing.
Look out for wording that reads like certification but is not. The Red Book counterfeiting page names three phrases that are not certification: “designed to…”, “complies with…” and “meets LPS…”. A brochure claim alone is not proof. The public frameworks guide runs through how the order itself is placed, and the SBD membership page names what joining the scheme takes from a company.
Can one doorset hold both LPS 1175 and PAS 24?
Yes, when it has been tested to both. Name both standards in the clause and ask for both pieces of evidence.
Is Secured by Design the same as PAS 24?
No. PAS 24 is the test, and Secured by Design is the scheme that uses it.
The tender names LPS 1175 Issue 8. Is that still valid?
The current issue is 8.2, from September 2024. Name it in the tender, and check the live listing before the order is placed.
Should a blast door be asked to hold an SBD listing?
No. Ask for the blast test evidence instead. The blast rating is the proof, not the scheme.
How should the evaluation score the three?
Score each evidence type on its own terms: the certificate and listing for LPS 1175, the test report for PAS 24, and the company page and product entry for SBD.
Contact us for a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.