Replacing Security Doors in an Occupied Building

Swapping a security door while people use the building needs a survey, a phased plan and written questions for the fitter. This guide sets out each step.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

A security door can be swapped while the building stays in use, but only when the work is planned round the people inside it. The opening is surveyed, the building is kept secure through the swap, and the work is phased entrance by entrance. This guide covers the survey, the phasing, and what to ask the fitter in writing.

  • SurveyMeasure the opening first
  • SecurityOne entrance stays shut
  • PhasingEntrance by entrance
  • PaperworkAsk in writing

Survey the opening before the leaf is ordered

Measure the opening before anything is ordered. Take the width and the height at three points each, check the opening is square, and note the floor level at the threshold. A rated frame is deeper and heavier than a standard one, so the opening that held the old door may not hold the new one without work.

Look at the wall the frame fixes into. The wall has to hold as well as the product it carries, so a cracked lintel or a fixing that has pulled out has to be put right before the new frame goes in. The specification guide covers the opening, the frame and the hardware as a single assembly.

Note what else lives in the opening. Cables, pipes, a closer arm, an access control reader, a fire alarm sounder: each one has to move, stay or be refitted, and each one takes time. The lead times guide dates the survey, the manufacture and the fitting, so the survey feeds the programme, not the other way round.

Keep the building secure through the swap

A building is at its weakest while a door is out of its frame. Plan the swap so the opening is never left unguarded: the old leaf comes out and the new frame goes in on the same visit, and where that is not possible, a cover and a member of staff stand in until it is.

Think about what sits behind the door. Stock, papers, plant and people all sit on the far side of the opening, and the swap has to be timed so the room is either empty or watched. A swap at a quiet hour is worth more than a fast swap in the middle of the working day.

Keys and codes need the same care. Change the codes and collect the keys for the old leaf before the new one goes in, and hand the new keys over only to the people named on the list. The forced entry guide covers the checks after an attack, and the same habit of writing each step down applies here.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Phase the work entrance by entrance

Split the job into stages, and close each stage before the next one opens. One entrance is rebuilt while the others stay protected, so the building is never open on two fronts at once. The programming guide puts the stages in order from survey to handover, and the replacement programme sits inside it.

Start with the entrance that matters least, and learn from it. The first swap shows how long the work takes, how the building copes, and what the fitter needs that the survey missed. The second swap goes faster, and the entrance that matters most goes last, when the crew has the measure of the job.

A housing block needs its own phasing. The fire door remediation guide phases the work through blocks for residents, and the same order works here: tell residents the date, the hours and the entrance affected, and keep one route in and out open at all times.

Fire, escape and access on the day

A door that holds fire has to hold fire on the day it is swapped too. The fire door guidance asks that a competent contractor carries out repair or replacement work promptly, and a replacement flat entrance door has to be fire-resisting, fitted by a competent person, with the technical information handed over.

Escape comes before security on the day. The leaf has to release from the escape side without a key, and a powered lock has to let go when the alarm sounds, when the power fails, or when the override is used. Check each release at the leaf, not at the drawing, before the fitter leaves.

Access has to work for everyone who uses the door. Through the first 30 degrees the force to open the leaf should stay under 30 N, and past that point it should stay under 22.5 N, with the threshold kept low. The access guide covers the force and width checks for a rated door.

The thermal limit the new leaf must meet

A replacement door is a controlled fitting, and Approved Document L sets the limit it must meet. Where the whole unit is replaced, the new unit has to be draught-proofed, it has to meet the limiting U-value in the table, and insulated cavity closers have to be fitted where they are appropriate.

For a pedestrian door, glazed or not, the limit is 1.6 W/(m²·K). A high-usage entrance door is allowed 3.0, and a vehicle access door 1.3, while a fire doorset on a building other than a dwelling is allowed 1.8. Both editions carry the same figures: Table 4.1 in the 2021 edition, Table 3.1 in the 2026 edition.

The limit applies to the complete doorset, not to the leaf by itself. Ask for the U-value of the doorset you are ordering, leaf, frame, glazing and seals together, and check it against the table before the order is placed. The thermal and weather guide gives the full table and the weather checks that sit beside it.

What to ask the fitter in writing

Put the questions in writing before the work starts, and keep the answers with the order. What is the rating of the doorset as supplied, and what certificate proves it? What fixing method will be used? What is the U-value of the doorset on the order, and what evidence proves it?

Ask about the day itself. Which entrance is swapped first, and which stays open? How long is the opening unguarded, and who stands it? What happens if the survey missed a cracked lintel or a service in the wall? The tender checklist guide sets out the questions a buyer should ask before the order is signed.

Ask about the paper that follows the work. When does the certificate arrive, when is the commissioning record signed, and when is the manual handed over? The installation handover guide lists the buyer’s checks opening by opening.

Hand the new door over with its papers

Do not sign for a door the papers do not support. The certificate has to name the rating tested and the opening it was tested in, the listing has to be live at order, and the fitting note has to show the tested fixing method was used. If any one of these is missing, hold the sign-off.

The new door joins the building’s record. The golden thread is the file the building keeps for its life, held digitally and open to the people who need it, and the new certificate, the commissioning note and the maintenance note go into it. The thermally broken doors guide covers the U-value and certificate a warm leaf should carry.

The first check after handover is the same as the last check before it. Push the leaf wide open and release it: it should close into its frame and latch on its own, and the gap round it should stay even. The flat entrance guide covers the doors that guard a home, and the same closing test applies to them.

Step What happens What to check
Survey Measure, square, wall, services Opening fits the new frame
Guard Cover and staff at the opening Building never stands open
Phase One entrance at a time Other entrances stay protected
Swap Old leaf out, new frame in Fixing method as specified
Handover Certificate, record, manual Papers match the door

A building stays secure through a swap only when one entrance is rebuilt at a time, and the opening is never left unguarded.

Can a security door be replaced while the building stays open?

Yes, when the work is split so one entrance is rebuilt at a time while the others stay protected, and the opening being worked on is guarded until the new frame is in.

What should the survey measure?

The width and height at three points each, whether the opening is square, the floor level at the threshold, the wall the frame fixes into, and every service that lives in the opening.

What U-value must the new door meet?

A pedestrian door, including a glazed door, must meet 1.6 W/(m²·K) under Approved Document L, and the fire doorset allowance is 1.8.

What should be asked of the fitter in writing?

The rating and its certificate, the fixing method and what the wall must hold, the U-value and its evidence, the phasing, and the date each paper arrives after the work.

When should the sign-off wait?

When the certificate does not name the rating and the opening, when the listing has lapsed, or when the fitting note does not show the tested fixing method was used.

Replacing a security door while the building stays open?Tell us the openings, the use, and the phasing you need.
Contact us for a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.