Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do

A fire and rescue authority can serve an alterations, enforcement or prohibition notice naming fire doors. This guide sets out what each one asks.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

A fire and rescue authority can serve a notice when a fire door fails, and each kind asks for something different. An alterations notice stops changes until the authority is told, an enforcement notice sets out the failings and the time to put them right, and a prohibition notice can stop the use of the premises.

  • Alterations noticeTell the authority first
  • Enforcement notice28 days at least
  • Prohibition noticeUse can stop
  • Appeal21 days to the court

Who can serve a notice, and on whom

The enforcing authority for fire safety is the local fire and rescue authority. Fire and rescue authorities inspect premises and can issue fire safety notices telling the responsible person what needs to change, says the gov.uk workplace fire safety page.

A notice is served on the responsible person. Article 3 of the Fire Safety Order defines the responsible person as the employer, for the parts of the workplace they control, or elsewhere whoever controls the premises or the owner. The commercial buildings guide sets out the responsible person and the three duties that matter for fire doors. The accountable person guide explains how the two roles differ.

The alterations notice: change nothing without telling the authority

Article 29 of the Order says the enforcing authority may serve an alterations notice if it is of the opinion that the premises constitute a serious risk to relevant persons, or may constitute such a risk if a change is made to them or the use to which they are put. The offices guide covers the fire door rules for an office building.

Once an alterations notice is served, the responsible person must notify the enforcing authority before making any of the changes it specifies that may result in a significant increase in risk. The changes are a change to the premises, a change to the services, fittings or equipment in or on the premises, an increase in dangerous substances present, or a change to the use of the premises.

The notice can also require the responsible person to send the enforcing authority a copy of the risk assessment and a summary of the changes proposed to the general fire precautions. An alterations notice stays in force until it is withdrawn or cancelled by the court.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

The enforcement notice: what it must say and the 28-day floor

Article 30 says that if the enforcing authority is of the opinion that the responsible person, or any other person mentioned in article 5(3), has failed to comply with any provision of the Order or of regulations made under it, the authority may serve an enforcement notice. The text of article 30 sets out what the notice must contain.

An enforcement notice must state that the enforcing authority is of that opinion and why, specify the provisions not complied with, and require the person to take steps to remedy the failure within a period of not less than 28 days from the date of service. Twenty-eight days is the floor, not the norm: the authority sets the period it thinks the work needs.

The authority may withdraw the notice at any time before the end of the period specified, and may extend the period if the work needs more time.

The prohibition notice: when use stops

Article 31 says the authority may serve a prohibition notice where it is of the opinion that use of premises involves or will involve a risk to relevant persons so serious that use of the premises ought to be prohibited or restricted. The matters relevant to that assessment include anything affecting the escape of people from the premises in the event of fire.

A prohibition notice must state the opinion and the matters that give rise to the risk, and direct that the use is prohibited or restricted to the extent specified, until the specified matters have been remedied.

A prohibition takes effect at once if the authority states in the notice that the risk of serious personal injury is or will be imminent. Otherwise it takes effect at the end of the period specified in the notice. The authority may withdraw a prohibition notice at any time. A lockdown that shuts escape routes raises the same question from the other side, and the NPSA lockdown guide covers the four lockdown methods, and the conflict with the fire plan that each one raises.

What a notice naming fire doors asks for

A notice about fire doors usually names article 17, which asks for a suitable system of maintenance so fire doors stay working as they should and in sound condition, or article 9, which asks for a fire risk assessment that fits the premises and covers its risks. The notice must specify the provisions not complied with, so the responsible person knows which duty the authority says has failed.

A leaf that will not close, a self-closing device that has failed, a gap wider than the limit or a seal that has torn, or a record with no checks at all can each be named in the notice. The fire door maintenance guide shows the routine for a fire door kept in order.

The work should be done by a contractor with the right skills, without delay. The gov.uk fire door guidance asks that repair or replacement is carried out by a contractor with the right skills, as soon as reasonably practicable. Where the door is powered, the powered door safety duties guide sets out the PUWER checks for a powered door.

Appeals: 21 days, and what an appeal does to each notice

Article 35 says a person on whom an alterations notice, an enforcement notice or a prohibition notice is served may, within 21 days of the day the notice is served, appeal to the court. The court means a magistrates court, and on an appeal the court may cancel or affirm the notice, in its original form or with such modifications as it thinks fit.

An appeal against an alterations notice or an enforcement notice suspends the notice until the appeal is finally disposed of, or until it is withdrawn.

An appeal against a prohibition notice does not suspend its operation, unless the court so directs on the application of the appellant, and then only from the giving of the direction. A prohibition that takes effect immediately stays in effect while the appeal runs, unless the court says otherwise.

After the notice: the record that proves the remedy

Failing to comply with an enforcement notice is an offence under article 32, as is failing to comply with a prohibition notice or a requirement in an alterations notice. A person guilty of those offences is liable on summary conviction to a fine up to the statutory maximum, or on indictment to a fine, or to up to two years in prison, or to both.

Keep the notice, the risk assessment, the inspection notes with dates and findings, the work orders, and the test evidence for any replacement doorset. The golden thread guide has the digital record kept for a higher-risk building, and the commissioning and handover guide gives the papers a new door should carry.

The record should sit where the next responsible person can reach it. The installation handover guide takes the buyer through the checks one opening at a time. A notice complied with and withdrawn should sit in the file beside the work that put it right, and the replacement guide is the place for a door changed while people still use the building.

Notice Article What it does
Alterations notice 29 Changes notified before they are made
Enforcement notice 30 Failings named, remedy in at least 28 days
Prohibition notice 31 Use stopped or restricted until remedied
Offences 32 Fine, or up to two years on indictment
Appeals 35 21 days to a magistrates court

A notice names the duty that failed, not the product. Put the door work right, keep the record, and answer the notice on its own terms.

What is the difference between an enforcement notice and a prohibition notice?

An enforcement notice names the provisions not complied with and requires the failure to be remedied in at least 28 days. A prohibition notice is served where the risk is so serious that the premises ought not to be used until the matters named in it are remedied.

Can the authority serve a notice about one fire door?

Yes, where the authority is of the opinion that a provision of the Order has failed. The notice has to name the provisions not complied with, so a single door that will not close or a self-closing device that has failed can each be named.

How long do I have to appeal a fire safety notice?

Twenty-one days from the day the notice is served, to a magistrates court. An appeal puts an alterations or enforcement notice on hold until the appeal is decided, but a prohibition notice keeps running unless the court directs otherwise.

Does an alterations notice stop all work on the building?

No. It requires the responsible person to tell the enforcing authority before making the changes it names that could raise the risk a lot. The notice can also ask for the risk assessment and a short summary of the proposed changes first.

What happens if I ignore an enforcement notice?

Ignoring an enforcement notice is an offence. Article 32 sets the penalty: on summary conviction a fine up to the statutory maximum, and on indictment a fine, or up to two years in prison, or both.

Had a fire safety notice naming your doors?Tell us the notice, the doors it names, and the date it sets.
Contact us for a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.