ArxBridge
Shopping Centre Security Doors
A shopping centre guards service corridors, plant rooms and cash offices behind its doors, so each leaf takes the grade the room behind it demands.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
A shopping centre is a mall, a set of shops and a warren of corridors behind them, and the doors between those parts decide what stays where it belongs. The mall holds the shoppers, the shops hold the goods, and the corridors behind them hold the stock, the takings and the plant, so each door takes its proof from the room behind it.
LPS 1175 sets the grade on a shopping centre door, and the category follows what sits behind the leaf. Issue 8.2, dated September 2024, sets the three categories at three, five and ten minutes, named B3, C5 and D10. The entrance takes the lowest of the three, the service corridor takes the middle one, and the cash office takes the highest.
A shopping centre follows the same rules as any other public building, and the fire door regulations commercial buildings guide covers the shared parts, while the retail security doors guide covers the shopfront leaves in the mall. The centre order names every door in the building, with the grade and the lock beside each one, so the door that arrives is the door the room needs.
- LPS 1175 B3 / C5 / D10Forced entry grades to Issue 8.2
- Service corridorsWhere the grade rises
- FD30 / FD60Fire periods to EN 1634-1
- One listEvery centre door named
Service corridors, plant rooms and cash offices: one centre, three grades
A shopping centre splits into three parts, and the grade follows what each part holds. The mall holds the shoppers, the service corridors hold the stock and the deliveries, and the cash office holds the money the day has taken, so each part takes the doors its work demands.
The entrance takes the doors the public walks through all day, and each leaf must open for a shopper with bags in hand and shut behind them on its own. The service corridor takes the doors the public never sees, and each leaf must hold against the attack the goods behind it invite.
Every opening in the centre is written down before any leaf is ordered, with the leaf it takes and the grade beside it. A leaf with no line on that list may turn up in the wrong corridor, guarding the wrong thing.
The entrance and the malls: the leaves every shopper passes
The entrance leaf works two ways at once: it opens for every shopper who arrives, and it holds an intruder out after closing. Its leaf, frame and lock are proved as one doorset, and the report names all three.
The entrance leaf takes a closer that pulls it shut after every shopper who passes, because a leaf left standing open is a door that guards nothing. The closer is set so the leaf comes home without a slam, and the pull is checked by opening the leaf and watching it shut on its own.
The entrance leaf is glazed so the staff can see who stands outside before the leaf opens, and the pane holds the same proof as the leaf beside it. The fire rated glass cost guide works through what the glass itself costs, and the test report names the bead and the fixings that hold the pane.
Service corridors: the doors behind the shopfronts
The service corridor runs behind every shop in the centre, and the leaf that guards it takes the grade the value behind it demands. A service corridor leaf takes C5, because the stock behind it is worth the minutes it takes to break through, and the leaf must hold until the alarm is answered.
The service corridor takes a lock the centre team controls, because the shoppers must never pass it alone. A leaf that guards the corridor takes C5, while the cash office beside it takes D10 and the entrance takes B3.
The corridor needs a leaf that shuts out the noise as well as an intruder, because the sound of trolleys and deliveries must not reach the mall. The leaf takes seals round its edges and a closer that brings it home after every member of staff who passes.
A service corridor leaf can hold fire back and hold an intruder out on the same doorset, because the corridor needs both proofs at once. The fire proof comes from EN 1634-1, in minutes and letters, E, EW and EI from 30 to 120, and the forced entry proof comes from LPS 1175, in B3, C5 and D10. Both proofs are run on one leaf, frame and seals, so one report holds them both. The fire and security doors dual certification guide works through how one doorset carries both proofs.
The cash office and the management suite: where the takings wait
No room in the centre takes a higher grade than the cash office, because the takings sit behind its leaf. Its leaf, frame, fixings and lock are proved as one doorset, and the test report names each part, so the door that arrives is the door that was proved.
A cash office leaf takes D10, because it must hold longest, while the service corridor beside it takes C5 and the entrance takes B3. Drawings drawn before Issue 8 call the same three categories SR2, SR3 and SR4, and the order carries the new name beside the old one.
The management suite beside the cash office takes the same care, because the records and the keys sit behind its doors. A management suite leaf takes C5, and the lock on it takes the same key as the cash office, so the staff who work the suite can open both without carrying two keys. What breaks a rating once a door is fitted is named in the keeping an LPS 1175 rating valid guide.
Plant rooms and the delivery bay: the doors that keep the centre running
The plant room holds the services that keep the centre open, and the leaf that guards it takes the grade the value behind it demands. A plant room leaf takes C5, because the boards and the plant behind it are worth the minutes it takes to break through.
Goods come into the centre through the delivery bay, and its leaf must be wide enough for pallets, with a closer that pulls it shut after each load. The delivery bay leaf takes C5, because the stock passing through it is worth the minutes it takes to break through. Leaf, frame, fixings and lock are proved as one doorset, and the report names the grade the leaf holds. The loading bay doors guide covers the doors that take the deliveries in, and the plant room door requirements guide sets out what the plant room leaf must do.
A leaf in the delivery bay that must stand open through the day takes a hold-open device proved to BS EN 1155, so the leaf shuts on its own the moment the alarm sounds.
A gap of 4 mm is left round the leaf, so it can swing free and the seal can close the opening when the leaf shuts. The intumescent seal swells as the heat nears 200 to 250 degrees and closes the gap, unless paint over the seal stops it swelling.
The way out for a full centre: escape routes shoppers can follow
The shoppers in a centre follow the route the building gives them, and the way out must be clear when the alarm sounds. Every door on the route opens with one push from whoever reaches it, because the leaf must open whatever the power is doing.
The route doors take a smoke proof beside the fire proof, to BS EN 1634-3: Sa where the smoke is at room temperature, S200 where it is at 200 degrees. Smoke moves faster than flame, so it reaches the shoppers on the route ahead of the fire, and a seal holds only where it meets the frame all round. The smoke control doors guide sets out how the doors hold smoke back while people move past them.
The route holds for as long as its weakest leaf, so every leaf on it takes the same period. A leaf proved for less than the leaves beside it gives way first, and the route fails with it, so no leaf on the route takes a shorter proof than the route needs.
Locks, readers and the centre team: who opens which door
Staff move from the mall through the service corridors to the plant room and back, and every leaf on that route opens for staff and stays shut for the public. A reader sits beside each leaf on the route, and it opens for the fobs the list names. The fire door hardware guide sets out what the lock the key turns must do.
The door entry systems guide covers the readers, releases and wiring beside a leaf.
The order names what each leaf does when the power fails, one answer beside each door, so no leaf is left to guess when the power goes. That answer is written before the order goes out, not after the first failure.
The shopping centre order: every leaf on one list
One list carries the whole centre, a line for every door with the leaf, the grade, the lock and the closer beside it, so the door that arrives is the door the corridors, the plant rooms and the cash office need. A list that names one leaf for the whole centre leaves the fitter guessing which room takes which grade, and a leaf in the wrong room guards the wrong thing.
Every figure on the quotation is matched to the list before the order goes out, each one sitting beside the door it belongs to, because a figure missed off the quotation still has to be paid, and a part added later costs more than the same part ordered with the building. The how to specify security doors guide names the columns the list must hold, and the security door cost factors guide works through what a higher grade adds to the price.
The centre team tries the doors through the week, a few leaves each day, so no door goes untried for long: the entrance at opening, the service corridor before the first delivery, and the cash office door at closing. A fault is noted at the door where it was found, with the leaf, the part and the date beside it, so the repair is booked before the next trading day starts. The fire door inspection checklist sets out what a visit should look for, and the security door maintenance checklist covers the doors that must hold both fire and forced entry.
| Position | Door | Grade | What to check |
|---|---|---|---|
| Entrance | Glazed leaf | LPS 1175 B3 | Leaf, glass, closer |
| Service corridor | Steel leaf | LPS 1175 C5 | Leaf, lock, seals |
| Cash office | Steel leaf | LPS 1175 D10 | Leaf, lock, reader |
| Management suite | Steel leaf | LPS 1175 C5 | Leaf, lock, reader |
| Plant room | Steel leaf | LPS 1175 C5 | Leaf, lock, seals |
| Delivery bay | Steel leaf | LPS 1175 C5 | Leaf, closer, lock |
A shopping centre door holds only as long as the shops behind it and the corridors beside it, so the grade, the period and the lock must all sit on the same list.
What grade should a shopping centre door carry?
The room behind the leaf decides the grade: B3, C5 or D10 to LPS 1175, and the cash office takes a higher category than the entrance beside it.
Can one leaf hold fire and forced entry?
Yes, where the fire test and the forced entry test were run on the same leaf, frame and seals, so one report holds the proof for both jobs.
Do shopping centre doors need access control?
The doors behind the mall take a reader beside the leaf, so the leaf opens for staff and stays shut for the public.
What period should a shopping centre door carry?
A shopping centre door takes FD30 or FD60, proved to EN 1634-1, and the letters beside the minutes name what the leaf held back. The period follows the room the leaf guards.
Who checks the shopping centre doors?
The centre team walks the round that covers every door, and the record of each visit stays with the centre file.
Get a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.