ArxBridge
Automatic Gates Cost Factors
Automatic gate cost factors: what sets the price of a powered gate, from the leaf and motor to safety devices, foundations and one schedule for the site.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
An automatic gate opens and closes on a motor, and the price of the gate follows the leaf it must move, the ground it moves over and the safety devices that must prove it safe. A small pedestrian gate costs less than a wide sliding gate that must move a heavy leaf across a yard every hour, because every part of the order grows with the size, the duty and the rating.
The order starts with the opening, not with the motor. A narrow entrance takes a swing gate, a wide yard takes a sliding gate, and a site with no room for a leaf to swing takes a cantilever gate, so the type follows the opening, not the catalogue.
The leaf, the motor, the safety devices, the foundations and the records all sit inside one schedule, and an order that names each one plainly gets the right gate on the right opening. The gate automation guide covers how a gate is driven, and the security gates page covers the gate lines.
- BS EN 12453Safety in use of power operated doors
- ISO 22343-1Vehicle security barrier ratings
- LPS 1175 B3 / C5 / D10Forced entry ratings, three, five and ten minutes
- 1,200 mm / 500 mmProtectUK gap cap and height floor
The gate and the opening: leaf, size and the ground it moves over
The opening decides the gate. A gate that spans a narrow entrance takes a smaller leaf than a gate that spans a wide yard, and the leaf size sets the weight the motor must move, so a wider gate asks for a stronger motor and deeper foundations.
The ground under the gate decides how it moves. A swing gate needs clear ground for the leaf to sweep, a sliding gate needs a track or a cantilever beam, and a site on a slope needs a gate that holds its line against gravity, so the ground belongs on the order beside the leaf.
Walk the site and note every way a vehicle or a person can reach the building, then set the gate by the opening it must guard. A staffed entrance faces less risk than a rear gate onto a road nobody watches after dark, so the rating follows the gate, not the site. The sliding vehicle gates page covers the gates that run on a track.
Swing, sliding or cantilever: the type that sets the motor and the foundations
A swing gate hangs on hinges and opens like a door, and it suits a narrow entrance with room for the leaf to sweep. A sliding gate runs on a track or a cantilever beam and suits a wide opening with no room to swing, and a cantilever gate carries its own weight on the beam, so no track crosses the lane.
The type sets the motor. A swing gate takes a ram or an underground motor on each leaf, a sliding gate takes a rack and pinion drive, and a cantilever gate takes the same drive on a heavier beam, so the motor follows the type, not the other way round.
The foundations follow the type too. A swing gate takes posts set in concrete, a sliding gate takes a track foundation and a cantilever gate takes a deep foundation for the beam, so the ground works belong on the order beside the gate. Our security gates cost factors guide works through what each part adds to the build.
The motor and the drive: the part that moves the leaf every time
The motor moves the leaf, and the drive decides how fast it opens and how often it can cycle. A gate on a staff entrance that opens a hundred times a day needs a motor proved for that duty, and a gate on a service yard that moves once a week needs less, so the daily cycle belongs on the order beside the motor.
The weight of the leaf sets the motor. A heavy steel leaf needs a stronger motor than a light aluminium leaf, and a leaf that must move against the wind needs more still, so the leaf, the weight and the wind all belong on the same line.
When the power goes, the gate must fail safe, so vehicles and people can still pass. The manual release belongs in the specification beside the motor, because a gate that stays shut in a power cut blocks the approach and the escape route alike.
The rating on the gate: forced entry, vehicle and the line beside it
A gate can carry a forced entry rating, and the rating follows the leaf, the frame and the lock together. LPS 1175 grades a doorset by the tools it resists and the minutes it holds, B3 for three minutes against category B tools, C5 for five minutes against category C tools and D10 for ten minutes against category D tools, under Issue 8.2, dated September 2024.
A gate on the vehicle line takes a vehicle rating too. ISO 22343-1 proves a barrier by driving a vehicle at it, with vehicles from a 1,500 kg car to a 30,000 kg truck at 48, 64 or 80 km/h, and the rating it earns names the vehicle, the speed, the angle and how far the vehicle gets past the line. The ratings in full are in our ISO 22343 vehicle security barriers guide, and the change from PAS 68 and IWA 14-1 to the current standard is worked through in our HVM standards guide.
The gate and the bollards beside it must carry the same rating, because a rated gate beside an unrated gap leaves the line open. The anti-ram gates and barriers guide works through the options, and our road blockers guide covers the blockers that rise from the road. The LPS 1175 page sets out the forced entry ratings, and the two routes are compared in our LPS 1175 versus PAS 24 guide.
The motor that moves the leaf: duty, drive and the power behind it
The motor and the drive move the leaf every time, and they take the weight of the leaf and the cycle of the site. A gate that opens for every lorry through a loading bay needs a motor rated for that cycle, and the drive belongs on the order beside the leaf, with the duty named for the traffic.
Swing, sliding or cantilever sets the motor and the foundations, because each type moves the leaf in its own way. A sliding gate runs along the fence line and takes a rack and a pinion, a swing gate opens inward on its hinges and takes an arm or an underground drive, and a cantilever gate hangs clear of the ground on a drive that carries the leaf without a track. The type belongs on the order beside the opening, so the motor that arrives fits the gate it must move.
The rating on the gate names forced entry, vehicle and the line beside it, because a gate that stops a person and a gate that stops a vehicle carry different proofs. The forced entry proof is LPS 1175, with B3 holding three minutes, C5 holding five and D10 holding ten, each against the tool set for its category, all under Issue 8.2 of September 2024. The vehicle line is proved to ISO 22343-1, with the mass, the speed and the penetration named together.
Foundations and power sit under every gate, because the ground the gate stands on decides whether the leaf runs true. The foundations take the weight of the leaf and the force of the wind on it, and the power run to the motor must carry the load the drive draws when the cycle starts. The ground survey comes before the foundations are dug, so the utilities under the gate line are found first.
Safety on a powered gate: what stops the leaf hurting someone
Safety on a powered gate is proved to EN 12453, which sets out how a gate must behave when a person or a vehicle is in its path. Photocells watch the line the leaf travels, safety edges stop the leaf when they meet resistance, and loops in the ground hold the gate open while a vehicle waits. Each device belongs on the order beside the motor, because a gate without them is a gate that can hurt someone.
Access control opens the gate for the lorries, the vans and the people who need the yard, and stays shut for the rest. The reader and the intercom open the gate for the traffic that needs the yard, and the fail safe state is written on the order beside them, so the gate stands open when the power fails.
The round that looks after a powered gate walks the line and stops at each gate in turn. The motor is checked for wear, the track or the hinges are checked for drag, the safety devices are tested by breaking the beam and watching the leaf stop, and the release is tested by hand. A fault found on the round is written down the same day against the gate it belongs to, with the part and the date beside it, so the repair is ordered before the gate is left standing open.
| Position | Gate | Drive | What to check |
|---|---|---|---|
| Main entrance | Sliding gate | Rack and pinion | Motor, track, safety edge |
| Loading bay | Cantilever gate | Drive without track | Motor, rollers, loops |
| Staff entrance | Swing gate | Arm drive | Hinges, arm, reader |
| Escape route | Swing gate | Manual release | Release, hinges, gap |
The type, the motor and the safety devices belong on the order beside every gate, so the gate that is delivered is the gate that was proved. The automation, the safety and the release are covered in our gate automation guide, and the rated options for the gate line are covered in our anti-ram gates and barriers guide. The ratings in full are set out in our ISO 22343 vehicle security barriers guide, and the sliding gates that run along a fence line are covered in our sliding vehicle gates guide.
Safety devices: the parts that stop a powered gate hurting someone
A powered gate is a machine, and the safety devices are what make it safe to use. BS EN 12453 sets out the safety in use of power operated doors, and the devices it asks for, photocells, safety edges and loops, each stop the gate when a person or a vehicle is in the way.
The safety edge runs along the leaf and stops the gate on contact, the photocell watches the opening and stops the gate before contact, and the loop in the ground sees a vehicle waiting and holds the gate open, so each device covers a different danger and the gate needs all three.
The safety devices must be proved with the gate, not bought separately and fitted later. A photocell set too low, an edge that does not reach the ground or a loop that does not see a small car each leaves the gate unsafe, so the test report must name the devices with the gate.
Access control: who opens the gate, and how
Access control on a gate decides who can open it, and when. Staff take a card or a fob for the gate they use every day, visitors take the intercom, and a code suits a gate that many hands use, because a code can be changed when staff leave.
A gate that opens for every vehicle that approaches needs a loop or a sensor, and a gate that opens only for named vehicles needs a reader or a camera, so the control follows the traffic, not the catalogue. Our security turnstiles guide covers readers, fobs and biometrics in the lane.
A gate that stays shut when the power fails leaves people on the wrong side of it, so the fail safe release has to be written into the order beside the reader and the motor. The release must work on power failure as well as on alarm, and a gate that traps staff inside in a power cut has failed the one job it was fitted for. Which lane suits which entrance is worked through in our turnstile versus speed gate versus portal guide.
Foundations, power and the ground the gate stands on
The foundations hold the gate true, and the posts set in concrete carry the leaf through its life. A heavy leaf on a post that cannot carry it sags, drags on the ground and stops latching, so the post, the concrete and the fixings belong on the order beside the leaf.
Power must reach the gate, and the cable run belongs on the order beside the motor. A gate far from the building needs a longer run and a stronger supply, and a gate on a site with no mains power needs a solar panel or a battery, so the power follows the site, not the gate.
The ground around the gate must be reinstated to the same standard as the road it sits in, because a patch that sinks leaves a dip in the lane and a trip at the kerb. The reinstatement belongs on the order, with the material and the finish named beside the foundations. The hostile vehicle mitigation page covers the line in full, and our choosing HVM bollards guide works through the options for the line beside the gate.
The gate order: one schedule for the whole gate line
Build the enquiry as a specification, with one line for every gate on the site. Each line names the position, the type, the size and the weight, the rating, the motor and the drive, the safety devices and the access control, and the leaf, the frame and the fixings as one gate.
Have the test report, the classification and the maintenance schedule travel with the gates, and file them the day the gates arrive. The handover pack should name the inspection routine the site will follow, so the record covers the whole life of the gate. What each check looks for is set out in the fire door inspection checklist, and the how to specify security doors guide runs through the same discipline column by column. Our road blocker cost factors guide works through the same discipline for the blockers on the line.
| Position | Gate | Rating | What to check |
|---|---|---|---|
| Site entrance | Sliding gate | LPS 1175 B3 | Motor, track, safety edge |
| Service yard | Cantilever gate | LPS 1175 C5 | Beam, drive, loops |
| Pedestrian entrance | Swing gate | LPS 1175 B3 | Hinges, closer, reader |
| Vehicle approach | Anti-ram gate | ISO 22343-1 | Rating, fixings, release |
| Car park exit | Swing gate | BS EN 12453 | Reader, loops, photocells |
An automatic gate moves a heavy leaf on a motor, so the type, the motor, the safety devices and the foundations must all sit on the same schedule.
What sets the cost of an automatic gate?
The leaf and its size, the type, the motor and the duty, the rating, the safety devices and the foundations, so the quote follows the gate, not the catalogue.
Do automatic gates need safety devices?
Yes. BS EN 12453 sets out the safety in use of power operated doors, and photocells, safety edges and loops each stop the gate when a person or a vehicle is in the way.
What happens to an automatic gate in a power cut?
It must fail safe, so vehicles and people can still pass, and the manual release belongs in the specification beside the motor.
Can one gate hold a forced entry rating and a vehicle rating?
Yes, where one gate is tested for both jobs, with LPS 1175 proving the forced entry side and ISO 22343-1 proving the vehicle side, and both proofs naming the gate that will be fitted.
Who checks automatic gates?
The team that runs the site, on the routine the maintenance plan sets. Each record names the gate, the fault, the repair and the date.
Get a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.