ArxBridge
Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified
A barrier rating names a vehicle, a speed and a distance. This guide explains what a Vehicle Dynamics Assessment is and how to commission one.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
A barrier rating names a vehicle, a speed and a distance. The Vehicle Dynamics Assessment is the study that works those three out for one site. This guide explains what it is and how to commission one.
- Threat vehicleThe size the site faces
- ApproachEach route a vehicle can take
- SpeedWhat the road lets a vehicle reach
- RatingWhat the barrier must hold
The question the study answers
Every barrier order rests on a guess until someone measures it: how fast could a vehicle reach the line, and how heavy could it be? The Vehicle Dynamics Assessment turns that guess into a number. It looks at each approach, at the vehicle the site faces, and at the speed the road lets that vehicle reach where the barrier will stand.
The NPSA guidance on hostile vehicle mitigation names the study as the technical assessment in the Operational Requirement, carried out at specific locations and based on the relevant threat vehicle. It sits beside the practical site assessment, and the two together give the requirement its numbers.
A rating without that study is a rating chosen from the catalogue, not from the site. The ISO 22343 guide explains the fields of a rating code one by one, and the vehicle barrier due diligence guide lists the evidence questions for a buyer.
When the study belongs in the programme
Commission the study before the order is placed, while the requirement is still being written. A study that arrives after the barrier is bought can only confirm or condemn a choice; one that arrives before the order shapes it. The NPSA guidance puts the Operational Requirement first: develop the detailed requirements, carry out the practical site assessment, and run the technical assessment at the locations that matter.
Order one when the approach is not obvious. A site with a long straight road, a site with several entrances, or a site where bends and junctions break the run-up all need numbers rather than judgement. A site with one short approach and a clear threat vehicle may need less, but skipping the study should be written down with its reasons.
Order one again when the site changes. A new entrance or a rebuilt road layout changes what a vehicle can reach. The Operational Requirement guide shows how the requirement is put together.
What the assessor needs from the buyer
The study starts with what the buyer already knows. Hand over the threat the site faces, the layout and its approaches, the Operational Requirement as it stands, and the drawings that show where the barrier line is meant to sit. An assessor who works from drawings alone will miss what the ground does to a vehicle.
Ask how the study is done before it starts. The NPSA guidance for clients describes the study as a subject to be aware of, with a checklist of questions to put to a potential provider. Use that checklist: ask what the study will measure, which vehicles and approaches it covers, and how the results will be presented.
Name the threat vehicle in the brief, not in the report. A car, a four-wheel drive and a lorry are three different threats, and the study should be told which ones the site faces. The NPSA and NaCTSO note on temporary barriers puts the same question first. The NPSA catalogue is where the NPSA lists the products it has assessed.
What the study gives back
The output is a quantified threat at each location: the vehicle the site faces, and the speed that vehicle could reach where the barrier will stand. That number is the hinge of the scheme: the rating, the foundation and the line all hang on it. A study that returns only a general opinion has not done the job.
Keep the output with the requirement, not in a separate file. The rating that follows should be traceable back to the study, location by location, so a later reader can see why each barrier holds its rating. If a location has no number against it, the record should say the barrier there was specified on judgement.
Check the output against the ground. Walk the approaches the study names and see whether the road still looks the way the study describes it. A study is a snapshot: a road resurfaced since it was done may give a vehicle a different speed today. The bollard choice guide sets out the types a site can use.
From the numbers to the rating
The rating follows the numbers, not the catalogue. NPSA and NaCTSO recommend ratings that meet or go beyond the stated vehicle threat: the size of the vehicle, the approach speed and the penetration distance. If the rating a site can buy does not reach the threat found, the gap must be managed as a risk, not quietly accepted.
Read the speed field of the rating against the study. A rating tested at 48 kilometres per hour proves the barrier at that speed; a study that finds 80 at the same point asks for a different rating. The three test speeds, 48, 64 and 80 kilometres per hour, cover the realistic approach speeds.
Remember the second rating as well. NPSA and NaCTSO recommend barriers that hold both an impact rating and a delay rating, because a barrier can stop one high-speed impact yet still be vulnerable to repeated ramming at low speed. The study quantifies the threat; the two ratings together answer it. The HVM planters guide shows how the same thinking applies to street furniture.
| Step | Who | What it settles |
|---|---|---|
| Requirement | Buyer and adviser | Threat, approaches, locations |
| Site assessment | Buyer and adviser | Vulnerabilities and opportunities |
| Dynamics study | Certified professional | Vehicle size and speed per location |
| Rating | Buyer and supplier | Tested barrier that meets the threat |
| Sign-off | Risk owner | Scheme accepted with its residual risk |
Where the study changes the scheme
A study often changes the scheme in ways a catalogue never would. A long straight approach may show a higher speed than anyone assumed, and the rating must rise to meet it. A bend or a junction may show a lower speed, and a lighter rating may do the job. Either way the scheme follows the ground, not the guess.
The study can also change the layout rather than the rating. Where the numbers are high, slowing the approach may be cheaper than raising the rating: the NPSA guidance names traffic calming as a way to limit approach speeds. That decision belongs in the requirement, with the new speed written down.
Where the study shows a threat the site cannot meet, the honest answer is to say so. Identify the gap, manage it as a risk, and record what the site accepts. A scheme that pretends the threat is lower than the study found is built on a number nobody believes. The tender response checklist gives the supplier side of the same conversation.
A barrier rating is only as good as the speed behind it, and the speed belongs to the road, not the catalogue.
Who reads it, and where it is kept
The study should be read by the person who owns the risk, by the person who writes the requirement, and by the supplier who must meet it. Each of them needs the same numbers, and should be able to trace the rating back to the study. A study sitting in one person’s inbox has not been read.
File it with the requirement and the test evidence, and keep it where the next person can find it. The gov.uk golden thread guidance sets the same standard for fire door records. A dynamics study deserves the same treatment, because the next scheme on the same site will start from its numbers.
Ask for advice before the study, not after it. The NPSA guidance names liaison with the authority’s own security advisers, with Counter Terrorism Security Advisers, and with engineers listed on the security engineers register. That advice should shape the brief, so the study answers the questions the site actually faces. The barrier care guide shows the line in service, and the programme guide shows how it was built.
What is a Vehicle Dynamics Assessment?
A formal study of the vehicle threat at one site, done by a certified professional. It works out which vehicle sizes the site faces and how fast each one could reach each point where a barrier will stand.
When should one be commissioned?
Early, before the order is placed and while the requirement is still open. A study done after the order arrives too late to shape it.
What should the buyer ask the provider?
Ask about the method, the vehicles and approaches covered, the form the results take, and how the buyer should use them. The NPSA guidance for clients is written as a set of questions to put to a provider.
Can the study lower the rating a site needs?
Yes, when it shows a lower speed than anyone assumed, or when slowing the approach brings the speed down. The rating follows the numbers the study finds, not the catalogue.
Does a barrier need a delay rating as well?
Yes. One rating covers a single high-speed impact; the other covers repeated ramming at low speed. NPSA and NaCTSO recommend holding both, because a line that stops the first can still be open to the second.
Contact us for a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.