ArxBridge
Security Doors for Dialysis Centres
A dialysis centre runs regular patient sessions beside treatment rooms and a drug store, so each leaf takes the LPS 1175 grade its room needs.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
The entrance leaf of a dialysis centre carries B3 to LPS 1175 Issue 8.2, and the waiting area, the treatment rooms and the staff office carry the same grade, while the water treatment plant room, the drug store and the plant room carry C5.
September 2024 brought Issue 8.2 of LPS 1175, and under that issue a leaf is graded by the minutes it resists attack, with B3 holding for three minutes, C5 holding for five minutes and D10 holding for ten minutes, while the older names SR2, SR3 and SR4 line up with B3, C5 and D10 in that order.
A dialysis centre holds treatment rooms where patients sit beside machines, a water treatment plant room that makes purified water for those machines, a waiting area where the next session gathers, and a staff office where patient records are kept, and the same patient cohorts return for session after session, so access runs on the session list rather than on walk in arrivals.
- B3 / C5Grades to LPS 1175 Issue 8.2
- Session listsRegular patient cohorts attend sessions
- Staff officeWhere patient records and keys are kept
- Water plant roomWhere purified water is made for treatment
Seven leaves round a dialysis unit: the grade each leaf carries
Seven leaves guard a dialysis centre, and each leaf takes the grade that fits the room behind it, with B3 on the entrance, the waiting area, the treatment rooms and the staff office, and C5 on the water treatment plant room, the drug store and the plant room.
The four leaves that patients and staff pass through the day hold for three minutes at B3, and the three leaves that guard purified water, medicines or plant hold for five minutes at C5.
| Room | Grade | Period |
|---|---|---|
| Entrance | B3 | FD30 |
| Waiting area | B3 | FD30 |
| Treatment rooms | B3 | FD30 |
| Staff office | B3 | FD30 |
| Water treatment plant room | C5 | FD60 |
| Drug store | C5 | FD60 |
| Plant room | C5 | FD60 |
Fire minutes and forced entry minutes can be proved on one leaf in a single report, so the order carries both results for the same doorset, and the dual doorset guide covers how a leaf is tested for fire and for forced entry without a second report.
Entrance leaf where patients arrive for a session
Patients arrive for a dialysis session in small groups through the morning and again through the afternoon, often by car or by taxi, and the entrance leaf holds B3 for three minutes while the desk keeps watch over the way in.
A session change brings one cohort out and the next cohort in through the same entrance, so the leaf must let patients through, hold against a stranger and shut behind each group, even when a wheelchair or a walking frame tries to hold it open. The automatic leaf guide covers leaves that open without a push when both hands are busy with a bag or a frame.
The desk at the entrance works from the session list, so a patient whose name sits on the list for that session passes through, while a visitor with no session waits at the desk until staff fetch the patient or confirm the visit. That list keeps the entrance leaf from standing open through the day, because the desk knows who is due and when, and the leaf shuts behind each named arrival.
The front of the unit needs the same care as the leaf itself, because a vehicle that reaches the entrance reaches the patients who wait there for a session, and ProtectUK sets the clear gap between bollards at no more than 1,200 mm, with a height of no less than 500 mm. The bollard guide covers the posts that stand at the front of the unit.
Waiting area leaf where patients sit before treatment
The waiting area holds the chairs where patients sit before a session starts, and its leaf takes B3, because the room fills before each session and the leaf guards it again once the room empties and the patients have moved through to treatment.
Patients wait in the waiting area with coats and bags beside them, and the leaf on the way in must move fast for people who arrive in a group at the start of a session. A push bar must cover no less than 60 percent of the leaf width on any leaf that serves more than 60 people, under BS EN 1125.
A dialysis waiting area is not a hospital ward, because the patients who sit there leave the same day after a session, and a hospital asks more of its leaves across a whole building. The hospital door guide covers a building where wards stay full round the clock, while the GP surgery door guide covers a building where patients arrive without a session list.
Treatment room leaves where dialysis runs through the session
Treatment rooms hold the chairs and the machines where dialysis runs, and the leaves round those rooms take B3 and hold for three minutes, because the machines and the chairs stay in place through the session and the leaf guards them between sessions.
Staff push trolleys and wheeled chairs through the treatment room leaves through the day, so a leaf must move under a light hand even when it carries B3. Under BS 8300 and Approved Document M the force to open it stays below 30 N through the first 30 degrees and below 22.5 N past that point.
Between sessions the treatment rooms stand empty with the machines switched off, and the leaves round them stay locked until staff open them for the next cohort. A leaf left open between sessions would let a stranger reach a machine unnoticed, so the lock is turned each time the room empties and the key stays with the nurse on duty.
A treatment room leaf opens many times in a session, as staff come and go beside the machines, so the lock has to work fast for gloved hands and still hold for three minutes when the room stands empty. Under TS 007 a 1 star cylinder paired with a 2 star handle gives a 3 star set, and the lock guide shows the cylinder and the handle working as one set.
Staff office leaf where patient records and keys are kept
Patient records and the keys for every other leaf live in the staff office, which is why that leaf holds B3 for three minutes and stays shut from the first session of the morning until the unit closes.
The senior nurse and the unit manager carry the key that opens every leaf in the unit, while treatment room keys open treatment rooms only, and no other key in the building opens the staff office, the drug store or the water treatment plant room. The master key guide shows how those keys sit together on one suite.
No published table joins the LPS 1175 grades to the ASTM ratings, so the two sets stay apart and the order states the LPS 1175 grade by itself, while the ASTM comparison guide covers how the two rating sets differ.
The staff office door stays shut as sessions turn over through the day
The staff office in a dialysis centre holds the patient records and the keys, and its door carries B3 to LPS 1175 Issue 8, a three minute hold against attack. The door stays shut between sessions, and it opens only when a nurse steps in to fetch a record or a key, then it is shut again behind them. The key is held by few hands, and the room stands shut through the treatment hours, so a stranger who reaches the office door meets a locked door and records that stay beyond reach.
The lock is turned at the end of the day and the key stays in the nurse’s hand, and the door is tried then to prove it holds. Under TS 007 a one star cylinder with a two star handle makes a three star set, proved as a pair, so the fitted lock is the one the report names. The lock guide lists the locks for a staff office door, with the proof each one carries.
Nurses pass the office door beside the machines through every session, and the hinges carry that daily work. BS EN 1935 proves a grade 13 hinge for 200,000 cycles under 120 kg and a grade 14 hinge for the same count under 160 kg, so the hinge is picked for the weight it carries. The effort cap in Approved Document M with BS 8300 is 30 N through the first 30 degrees of swing and 22.5 N for the rest, and it holds even with a B3 grade on the door. The hinges are oiled on the same round, so a stiff swing is found before the next session starts. The steel frame guide sets out the frame for a heavy door, with the lock set into it.
| Who | Key | End of day try |
|---|---|---|
| Senior nurse | Opens the whole unit | Office door tried and locked |
| Unit manager | Opens the whole unit | Record cupboard shut and locked |
| Staff nurse | Opens office and treatment rooms | Key returned at handover |
| Engineer | Opens plant room only | Key returned at sign off |
The key stays with the nurse in charge and not with the room
One key opens the office, the treatment rooms and the drug store for the senior nurse, and the unit manager carries its match. A treatment room key opens treatment rooms and nothing more, so on its own it opens little. The master key guide sets out the suite that puts every door on one set of keys.
A grade is lost the moment door, frame or hardware moves from the state it was proved in, and each room gets its checks written against that room, door, lock and closer together. The maintenance checklist gives the checks for each door, lock and closer together, and the rating guide shows where a fitted door stops matching the state it was proved in.
The unit list is sent to the quote page with the staff office first, grade and closer beside each room, so the records that sit behind a shut door stay behind it after the last session of the day ends.
Water treatment plant room leaf where purified water is made
Purified water for the dialysis machines is made in the water treatment plant room, and its leaf holds C5 for five minutes, because the kit inside feeds every treatment room and the leaf is the only guard on it.
Only a small group of key holders ever opens the water treatment plant room, and the leaf stays shut between their visits, so a fault comes to light on a routine visit by a key holder rather than through a stranger who wanders in. The plant room guide covers what that leaf must do, while the steel frame guide covers the frame that carries the leaf and its lock together.
Clean water and clean air matter beside the machines, and the room that makes the water sits apart from the treatment rooms for that reason. The cleanroom door guide covers leaves where dust and damp must stay out of the room behind them.
If the plant room leaf gives way, the water the unit needs stops with it
The water that feeds every dialysis machine is made in one room, and its leaf is graded C5, a five minute hold to LPS 1175 Issue 8. Engineers come to the room on a schedule, and the key sits with a small group, so the room opens at set times and is shut and locked behind them. A stranger who reaches the plant room leaf finds it shut, and the water behind it stays beyond reach.
Through a session the treatment room leaf stays shut, and it opens when the chairs empty. The machines and the chairs stay where they are through the session, and the leaf guards them between sessions with a B3 grade, three minutes to LPS 1175 Issue 8. The push stays low even with that grade: Approved Document M with BS 8300 caps the effort at 30 N over the first 30 degrees of swing, then 22.5 N for the rest. The plant room guide names the duties of a leaf on a room like this one.
When a session ends the rooms stand empty with the machines off, and their leaves stay shut and locked until the next cohort is called. An open leaf between sessions leaves the machines unguarded, so the lock is turned as the last nurse leaves and the key stays in the nurse’s hand. The lock guide names the locks that sit on a treatment room leaf and the proof each one carries.
| Leaf | Grade | Who opens it |
|---|---|---|
| Water plant room | C5, five minutes | Engineers on a schedule |
| Treatment rooms | B3, three minutes | Staff at session change |
| Drug store | C5, five minutes | Senior nurse only |
| Staff office | B3, three minutes | Senior nurse, unit manager |
The treatment room leaf through a session: a shut leaf until the chairs empty
Staff come and go beside the machines all through a session, so the leaf is opened many times a day and its hinges take the work. Grade 13 hinges under BS EN 1935 are proved for 200,000 cycles with a leaf of 120 kg, while grade 14 hinges take a leaf of 160 kg for the same count, so the hinge is chosen for the weight it carries. The steel frame guide names the frame that carries a heavy leaf and the lock set into it.
The senior nurse holds the key that opens the whole building, and the unit manager holds one too. Treatment room keys open treatment rooms and nothing more, so a treatment room key on its own is of little use to a stranger. The master key guide explains the suite that puts every leaf on one set of keys.
A grade is lost the moment leaf, frame or hardware moves away from the state it was tested in, and the checks for each room are written against that room, leaf, lock and closer together. The maintenance checklist lists the checks to run on a leaf, its lock and its closer, and the healthcare doors quote page is where the unit list goes, grade and closer beside each room.
Drug store leaf where medicines are kept under lock
Medicines for the sessions are kept in the drug store, and its leaf holds C5 for five minutes, because the stock inside is counted and checked and the leaf guards it from the first session until the unit closes.
Staff fetch medicines from the drug store at set points in the session, and the leaf shuts behind them each time, so the room is open for minutes at a time and shut for the rest of the day. An oncology unit keeps a drug store on the same pattern, and the oncology unit door guide covers a building where day case treatment runs beside a drug store.
The senior nurse holds the drug store key with the staff office key, and no treatment room key opens the drug store, so a key taken from a treatment room opens nothing beyond the treatment rooms. The dental practice door guide covers a smaller healthcare building where medicines sit behind a shut leaf.
Plant room leaf and the order: grade, lock and closer on one line
Pumps, heaters and boards that warm the unit and light the treatment rooms sit in the plant room, and its leaf holds C5 for five minutes, because the kit inside keeps the whole unit running and the leaf is the only guard on it.
The unit is busy all week, so the keys and the cards have to fit the people who hold them. One key in the senior nurse hand opens every leaf in the building, while treatment room keys open treatment rooms only, and the master key guide shows how those keys sit together on one suite.
Every leaf in the unit goes on one list for the order, with a line per leaf naming its room, grade, lock and closer, and each line is read back against its own room before the order is signed. The ten steps guide shows how that list takes shape, the LPS 1175 guide sets out the grades behind it, and the specifying guide treats the leaf, the frame and the hardware as one doorset.
A grade stays in force only while the leaf, the frame and the hardware stay as they were tested, and the rating guide covers what keeps an LPS 1175 result valid, while the maintenance checklist covers the routine checks on each leaf, its lock and its closer.
Put the room, the grade, the lock and the closer for every leaf on one list, then read each line back against its room before the order is sent.
What grade should a dialysis centre entrance door carry?
B3 to LPS 1175 Issue 8.2, a three minute hold, because patients arrive for sessions in small groups and the desk watches the leaf from the first session to the last.
What grade should a dialysis centre treatment room door carry?
B3 to LPS 1175 Issue 8.2, because the treatment room leaf guards the chairs and the machines where dialysis runs through the session.
What grade should a dialysis centre drug store door carry?
C5 to LPS 1175 Issue 8.2, a five minute hold, because the medicines for the sessions are counted and checked behind that leaf.
Can a dialysis centre leaf hold a fire period and a security grade?
Yes, a dialysis centre leaf can be proved for fire and for forced entry together, and the two results stand side by side in one report.
Who holds the keys in a dialysis centre?
The senior nurse and the unit manager hold the key that opens every leaf, while treatment room keys open treatment rooms only.
Pricing doors for a hospital site? The healthcare doors quote page lists what one enquiry needs, department by department and room by room.
Get a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.