An A and E fire door order puts FD30 where patients and staff pass and FD60 where critical kit, drugs and plant sit. Each leaf holds its period.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Patients arrive by ambulance at the bays beside the entrance, then move through the waiting area to triage and on to the treatment cubicles, while the most urgent cases go straight to the resuscitation room. The entrance, the waiting area, the triage room, the treatment cubicles and the staff office carry FD30, while the resuscitation room, the drug store and the plant room carry FD60.

A doorset is tested against fire under EN 1634-1 and given a period in minutes, from FD30 up to FD120, and the letter after the number records what the leaf stopped: E for flame alone, EW for flame with part of the heat and EI for flame with the heat as well. Thirty minutes of flame and heat puts FD30 on the order, and sixty minutes puts FD60 on it, and the period is the time the doorset proved when it was tested. The periods and the letters beside them are listed in the fire ratings guide, and the proof that must sit behind the period on the order is covered by the fire door certification guide.

An accident and emergency department takes patients day and night, with trolleys moving between the entrance and the cubicles, a waiting area that fills through the evening, a resuscitation room where the most urgent cases are treated, and a drug store and a plant room that the public never enters, so the fire leaves divide the department into compartments and hold a fire inside the compartment where it started. The fire compartmentation guide covers how those compartments are drawn, and the hospital fire door guide covers the leaves on the wards beside the department.

  • FD30 at the frontThirty minutes where patients and staff pass
  • FD60 at the backSixty minutes on resus, drug store and plant leaves
  • Ambulance bays beside the entranceThe arrival route the fire leaves guard
  • Eight leaves namedOne line for each opening in the department

Eight A and E rooms: the period each leaf carries

Eight leaves run from the entrance of the department through to the plant room, and the period on each one follows the room behind it. Five of them meet patients, staff and visitors through the day, and three of them guard rooms the public never enters.

FD30 goes on the five leaves the public reaches, because patients, staff and visitors pass through those rooms through the day. FD60 goes on the three leaves the public never reaches, because the critical kit, the controlled drugs and the plant behind the door call for a full hour of hold.

Room Period Grade
Entrance FD30 B3
Waiting area FD30 B3
Triage FD30 B3
Treatment cubicles FD30 B3
Staff office FD30 B3
Resuscitation room FD60 C5
Drug store FD60 C5
Plant room FD60 C5

One doorset can prove a fire period and a forced entry grade in a single report, provided the order names both together and the report covers both. LPS 1175 Issue 8.2 arrived in September 2024, and under it the leaf, the frame, the fixings and the lock are tested together as one doorset against a named set of tools, with the time the set holds deciding the grade: three minutes for B3 and five minutes for C5. A leaf that must prove both at once is covered by the fire and security doors dual certification guide.

What FD30 and FD60 hold back in an A and E department

FD30 holds flame back for 30 minutes, and FD60 holds it back for 60 minutes, and the letter after the number tells the department what else the leaf stopped. The letter E means flame alone was stopped, EW means flame with part of the heat, and EI means flame with the heat as well, so the letter counts as much as the number on the order.

A building is divided into compartments by its fire leaves, and each leaf holds a fire inside the compartment where it began. The resuscitation room, the drug store and the plant room each sit in a compartment of their own behind FD60 leaves, and the waiting area and the cubicles sit in compartments of their own behind FD30 leaves. The hospital door guide covers a building where wards stay full round the clock, while the GP surgery fire door guide covers a smaller building where patients arrive without an ambulance at the door.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

A full hour where critical kit and drugs sit: resuscitation room, drug store and plant room

The resuscitation room holds the beds and the kit for the most urgent cases, and the controlled drugs and the critical kit behind its leaf call for the highest hold in the department, so it carries FD60. The leaf stays shut between cases, because the kit inside must stand ready for the next arrival.

Controlled drugs for the department sit in the drug store, so the leaf on that room carries FD60 and stays shut while the room stands empty. The stock would feed a fire that reached it, so the leaf stays shut through the day, and staff fetch drugs at set points and shut the leaf behind them each time.

Hot water and department light come from the pumps and boards behind the plant room leaf, so that leaf carries FD60 too. The plant room fire doors guide lists the duties of a leaf on that room, and the leaf stays locked because the boards behind it serve the whole department, and a fire in the plant room would cut power and heat to every room at once.

The resuscitation room leaf holds an hour while the team works behind it

The resuscitation room leaf carries FD60 because the team stays at the bed while a patient is at their most urgent, and the leaf must hold flame and heat for a full hour while that work goes on behind it. Beds, monitors and the drug trolley stand behind the leaf, and the hour gives the team time to finish what they are doing before the room is left.

The sixty minutes sit on the whole set, leaf and frame and ironmongery together, and the report behind the period names each piece that was tested with the leaf. The letters beside the minutes say what the set held back, EI where it held flame with the heat as well, EW where it held flame with part of the heat, and E where it held flame alone, and the order must carry the letters with the minutes. The certification guide walks through the papers that must sit behind a leaf before it is hung, so the leaf on the frame is the leaf the report describes.

Part Fault What it costs
Closer Leaf stands open after a pass The hour is lost before flame arrives
Seal Painted over or split The gap stays open as the heat rises
Gap Leaf sagging on worn hinges Flame slips round the edge of the leaf
Lock Fitted after the test, never proved with the leaf The report no longer matches the door

The closer is proved to BS EN 1154, and a fire leaf takes nothing below EN 3, because a weaker closer leaves the leaf standing open after the team has passed through. BS 8300 with Approved Document M puts the push below 30 N for the first 30 degrees of swing, then below 22.5 N beyond that point, so a member of the team with one hand free can still open the leaf. The closer guide explains how a closer loses power over years of passes.

A failed closer takes the hour off the leaf before the flame arrives

A closer that has lost its power does not fail loudly. The leaf swings shut most of the way and stops short of the frame. The gap guide shows where the gauge sits and what the reading should be, and a gap wider than 4 mm is written down beside the leaf that carries it.

The walk round the department tries each leaf in turn. Each leaf is pushed open and watched as it swings back to its frame, the seal is looked at for paint or splits, and the lock is tried with its key. A fault found on the walk goes on the list beside its own leaf that same day. The inspection checklist gives that walk its shape, leaf by leaf, so no leaf is passed over because the day ran short.

Heat near 200 degrees starts the seal swelling, and by 250 degrees the seal has grown across the gap, while paint on the strip stops the swell and leaves the opening unguarded. The intumescent seals guide follows that swell from first warmth to full close, and a leaf whose seal cannot grow holds no hour at all.

The order for the department goes out with the resuscitation room leaf on it, and the healthcare doors quote page asks for the room, the period and the closer on one line, so the leaf that turns up matches the leaf the room asked for.

Half an hour on the way in: entrance, waiting area and triage leaves

Patients reach the entrance by ambulance through the day and the night, and visitors come in behind them to sit in the waiting area before triage, so the entrance leaf carries FD30.

Thirty minutes gives patients and visitors time to leave by the marked route, and the entrance leaf must swing open in the direction of escape without a key or a code. A leaf that needs a key to open from the inside fails the route it guards, whatever period it carries, and the emergency exit door guide covers the leaves on the way out of the department.

The waiting area leaf and the triage leaf carry FD30 as well, because the waiting area fills through the evening and triage sees arrivals in turn. A push bar must cover no less than 60 percent of the leaf width on any leaf that serves more than 60 people, under BS EN 1125, and the panic hardware guide covers the bar that must open the leaf fast when the waiting area empties in a hurry.

Treatment cubicles and staff office: FD30 leaves that stay shut between patients

Beds, trolleys and kit are left in the treatment cubicles before the first arrival, and the beds are made ready there between patients, while phones and bags rest beside them. The FD30 leaf on those rooms stays shut while they stand empty, so a fire that starts in a trolley cannot reach the corridor.

Patient records and the keys for every other leaf live in the staff office, so the leaf on that room carries FD30 and stays shut while the room stands empty. The papers would feed a fire that reached them, so the leaf stays shut, and the senior nurse and the charge nurse hold the key that opens every leaf, while treatment cubicle keys open cubicles only.

A cubicle leaf swings open many times in a day, as staff come and go beside the beds, so its closer must draw it shut after every pass. The fire door signage guide covers the signs that tell staff and visitors to keep the leaf shut.

Smoke before flame: Sa and S200 along the A and E corridor

Smoke reaches the corridor before flame does, so the leaves on the route out carry a smoke rating beside their period. Smoke is held back at room temperature by Sa and at 200 degrees by S200, and the order must name which of the two the leaf proved under BS EN 1634-3.

The seals round the leaf are intumescent, and they swell shut once the heat round them passes about 200 to 250 degrees, closing the gap the smoke would use. How those seals work is covered by the intumescent seals guide, and the leaves that must hold smoke as well as flame are covered by the smoke control doors guide.

The closer, the seals and the gap: what holds the period on the leaf

The closer that pulls the leaf shut after each patient is proved to BS EN 1154, and EN 3 is the smallest power size that standard allows on a fire door, so a closer of EN 1 has no place on a fire leaf. A patient with a bag over one shoulder still has to push the leaf open with the free hand, so BS 8300 with Approved Document M keeps that push under 30 N through the first 30 degrees of swing and under 22.5 N past that point.

Checked with a gauge at the sides and the top, the gap round the leaf must measure 4 mm, and a leaf that has swollen in the damp or dropped on its hinges leaves a gap the fire can use. How the gap is measured is covered by the fire door gaps guide, and the hinges, locks and closers that hang on the leaf are covered by the fire door hardware guide.

The leaves hang on hinges proved to BS EN 1935, where grade 13 has stood 200,000 cycles carrying a leaf of 120 kg and grade 14 has stood the same cycles carrying a leaf of 160 kg, so the leaf still meets its frame after years of arrivals and departures. The closer that must draw the leaf shut after every pass is covered by the fire door closers guide.

Count the knocks the A and E doorset takes in a week

Beds move through the A and E doors on every shift, and each pass brushes the edge of the door on its way through. A bed frame catches the same low corner again and again, and the paint there wears first, then the timber beneath it starts to show the marks. The door still shuts at first, and the wear only shows when the closer must pull a door out of true.

A kick plate takes the blows that would otherwise land on the door itself, and a plate fixed low on the push side spreads each knock across a wider face. The plate must sit flat, with its fixings tight, or the edge lifts and catches the bed frame on the next pass. BS EN 1154 puts closers on a scale, and a fire door in this department needs EN 3 or stronger, since anything weaker leaves the door hanging short of its frame after a bed has pushed through. The closer pages set out the grades a fire door closer must meet.

Mark Where it shows What it means
Scuffed paint low down Push side of the door Beds pass close every shift
Plate edge lifting Fixings at the base Knocks pull the plate free
Door stops short Frame on the latch side Closer power has faded

A gauge held to the frame reads the gap, and a reading past 4 mm where the door meets the latch shows the hinges have let the door drop. The gap pages show how the gauge is held and how a reading is taken, and a monthly reading shows whether the gap creeps wider a little at a time or jumps after one hard knock.

The kick plate wears thin before the closer loses its pull

Staff push beds through with one hand on the bed and one hand on the door, and the door swings wide, then the closer draws it back. The push stays light enough for opening with one hand free, under 30 N for the first 30 degrees, then under 22.5 N past that point, so the door can be opened while the bed is steadied. A closer running out of power gives no warning, and the first sign is a door that closes most of the way, then hangs short of its frame.

Seals take knocks of their own, because a bed wheel clips the strip where the door meets the frame. Paint on the strip blocks the swell, and a split strip leaves a line the heat can use, so the strip is looked at each time the gap is read. The strip begins to grow as the heat passes 200 degrees and has closed the gap before the heat reaches 250. The seal pages trace how the strip grows as the heat climbs.

The walk round the department tries each door in turn, pushing it open and watching it swing back, then looking at the plate, the strip and the gap. The checklist pages give the walk its order, door by door, and the upkeep pages name the jobs that keep a closer pulling a bed door shut after every pass.

When the order goes out for the department, the enquiry checklist takes the room, the period and the closer in a single line, so the doors that take the beds arrive with plates and closers matched to the traffic they will meet.

The A and E fire order: every leaf, its period and its proof

One list holds a line for every opening in the department, and each line names the leaf, the period, the grade and the closer for that opening. A leaf left off the list may be hung on the wrong opening, and the resuscitation room could end up with half an hour instead of a full hour.

On a set day each month the charge nurse takes the door list round the department and tries the leaves in turn, from the entrance through to the plant room. Any leaf that drags, any seal that has split and any closer that no longer draws the leaf shut is written beside its door on the day it is found. What the monthly round should look for is covered by the fire door inspection checklist, and the work that follows it is covered by the fire door maintenance guide.

Nothing is signed until the list has been read again from the first leaf to the last.

Order the leaf, the closer and the seals as one set for an A and E department, and check them as one set against the corridor and the route out behind the leaf.

What period does an A and E entrance take?

The entrance takes FD30 under EN 1634-1, a thirty minute hold, because patients and visitors pass through it on their way from the ambulance bays to the waiting area.

What period does the resuscitation room leaf take?

FD60 under EN 1634-1, a sixty minute hold, since the controlled drugs and the critical kit behind that leaf need more hold than the leaves at the front.

What period does the A and E drug store leaf take?

FD60 under EN 1634-1 gives the drug store leaf sixty minutes of hold, since the controlled drugs behind it need more hold than the leaves at the front.

Can one A and E leaf carry a fire period and a forced entry grade?

Yes, one report can cover the fire period and the forced entry grade together, so both sit on the same leaf.

Who checks the A and E fire doors?

The charge nurse takes the door list round the department each month and tries the leaves in turn, so a fault is found before the next arrival.

Specifying fire doors for an A and E department?Send the list of doors with the period, the grade and the closer each room must carry, and ask for a quotation on tested doors.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →