SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level

SR2 vs SR3 vs SR4 security doors compared by LPS 1175 tool category and attack time, with plain guidance on which level suits each UK building type.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

SR2 resists category B tools for 3 minutes, SR3 resists category C tools for 5 minutes, and SR4 resists category D tools for 10 minutes. Start from the threat and the response time, not the biggest number: the right rating is the lowest one that still outlasts the attack you expect.

  • SR2 / B33 minutes, screwdrivers, pliers, hand saws
  • SR3 / C55 minutes, crowbars, drills, chisels
  • SR4 / D1010 minutes, sledgehammers, disc cutters
  • RuleMatch the delay to the response time

What the three ratings actually test

All three ratings come from LPS 1175 Issue 8, the LPCB forced-entry standard. Each rating pairs a tool category with a minimum delay, and the test attacks the complete doorset, not just the lock. The table below sets out the three levels most often specified for doors.

Rating Issue 8 code Tool category Minimum delay
SR2 B3 B: screwdrivers, pliers, hand saws 3 minutes
SR3 C5 C: crowbars, drills, chisels 5 minutes
SR4 D10 D: sledgehammers, disc cutters, jigsaws 10 minutes

The categories build on each other in practice: a doorset rated C5 has shown it can also handle the lower tool sets. What the rating does not tell you is which building needs it, which is where the rest of this guide comes in. Our LPS 1175 guide covers the full scale from A1 to H20.

SR2: three minutes against category B

Category B tools are the contents of a determined burglar’s bag: screwdrivers, pliers, hand saws and claw hammers. Three minutes does not sound long, but against hand tools it is a serious delay, and most opportunists move on well before it ends.

SR2 suits buildings where the threat is real but the attacker is unlikely to bring power tools: shops, offices, schools and light industrial units. It is the most specified LPS 1175 level for security doors because it balances proven resistance with a doorset that still behaves like a normal door.

Think of SR2 as the entry point to rated security rather than a compromise. Anything below it on the LPS 1175 scale is the one-minute A1 rating, and anything above it starts adding weight, cost and hardware complexity.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

SR3: five minutes against category C

Category C adds leverage and noise: crowbars, drills, chisels and axes. These are the tools of someone who has chosen your building specifically and does not mind being heard. Five minutes against that toolkit is a different proposition from three minutes against hand tools.

SR3 fits cash-handling sites, pharmacies, high-value retail and plant rooms holding critical equipment. It is also the level many banking refurbishments land on for back-of-house doors. The doorset gets heavier and the hardware more substantial, which the structure around it must accept.

Note the jump is not just two extra minutes. The tool category changes, so the construction changes with it: thicker skins, stronger cores and fixings designed for prying loads.

SR4: ten minutes against category D

Category D brings power: sledgehammers, disc cutters, jigsaws and high-performance battery tools. Ten minutes against this kit is the level specified for data centres, utilities, government buildings and anywhere the risk assessment names experienced attackers.

An SR4 doorset is a serious piece of engineering. Expect significant weight, specialist hinges and locking, and a frame and wall construction to match.

Ten minutes also starts to overlap with realistic response times, which is why SR4 appears so often in critical infrastructure specifications. See data centres for how the rating fits a layered site.

Matching the rating to the building

Start with the risk assessment, not the catalogue. A convenience store on a busy high street faces a different attacker from a substation on an industrial estate, even though both might ask for a security door.

As a rough orientation: retail and offices usually land on SR2; cash, drugs and high-value stock push towards SR3; critical infrastructure, utilities and government work points at SR4. Schools and healthcare sit across SR2 and SR3 depending on the site. These are starting points for discussion, not rules.

The insurer’s loss-prevention team or the client’s security consultant normally names the rating. If no one has named one, say so in the enquiry: we will recommend a level from your description of the site and the threat, and you can have it confirmed by your insurer.

The opening, not the building: rating door by door

Rate each opening for the risk it faces, not for the building it sits in. A staffed front entrance faces less risk than a rear door onto a yard nobody watches after hours, so walk round the outside and note every door a person can reach, then set each one by the attack it could face. A schedule that gives every door on a building the same rating will waste money on the doors that face the least risk and leave the doors that face the most under-rated. The rating follows the opening, and the schedule carries one line per opening, with the building, the position and the rating named on it.

Two facts set the LPS 1175 rating: which tools the doorset resists and how many minutes it holds. Category B tools are screwdrivers, pliers and hand saws, and three minutes against them earns B3. Category C tools are crowbars, drills and chisels, and five minutes against them earns C5. Category D tools are sledgehammers, disc cutters and jigsaws, and ten minutes against them earns D10. LPS 1175 Issue 8.2, dated September 2024, carries the current labels, and drawings made before the change still show the earlier ones, so read SR2 as B3, SR3 as C5 and SR4 as D10. The old labels are the same ratings under earlier names, not lesser ones, and a drawing that shows SR3 asks for C5.

Match the rating to the time the building needs. Three minutes suits a door where a guard or a camera will spot the attempt quickly, five minutes suits a door where the response takes longer, and ten minutes suits a door guarding high value stock, a plant room or a cash handling area. Where many openings share the same risk, one rating can cover the whole group, and the schedule can carry them on one line, as long as each opening is named on it.

When the rating outgrows the door: cost, weight and the leaf that must carry it

A higher rating is not always a better order. Each step up the ratings adds weight to the leaf, strength to the frame and work to the fixings, and a door rated far above its risk costs more to buy, more to fit and more to keep working. A D10 leaf on a staffed entrance that faces little risk is a door that costs the building money every day it stands there, and a B3 leaf on a rear door that faces a quiet yard is a door that leaves the building short. The rating that fits is the one the risk asks for, and the schedule should show the risk beside the rating, so the next reader can see why each door carries the rating it does.

The changes that void a rating are set out in our keeping an LPS 1175 rating valid guide, and the two routes are compared in our LPS 1175 vs PAS 24 guide. PAS 24 covers the enhanced security doorset, and a schedule that names PAS 24 beside an LPS 1175 rating has named two proofs for the same door, so each one needs its own test report behind it. Our LPS 1175 page sets out the forced entry ratings in full.

Rating Tools Minutes Old label
B3 Screwdrivers, pliers, hand saws 3 SR2
C5 Crowbars, drills, chisels 5 SR3
D10 Sledgehammers, disc cutters, jigsaws 10 SR4

Keep the test report, the rating and the risk beside each opening in one file, so the next specifier can see why each door carries the rating it does, and no door is rated above or below its risk.

Why a higher rating is not always better

Every step up the scale adds weight. An SR4 doorset can be far heavier than an SR2 equivalent, which affects the hinges, the closer, the frame, the wall it fixes into and the people who use the door every day. A fire exit that staff struggle to open is a problem no rating solves.

Cost follows the same curve: more material, more machining, heavier hardware and longer test programmes. Specifying SR4 where SR2 would do spends budget that could have gone on a second layer of protection elsewhere, such as combining the rating with fire resistance in a fire and security door.

There is also the question of what the rating protects. A D10 door in a plasterboard partition is theatre: the attacker goes through the wall. Match the doorset to the construction around it, or upgrade both together.

Right-size the rating. The best specification is the lowest rating that still defeats the expected attack, fitted into construction that deserves it.

Working backwards from response time

The delay in minutes exists for one reason: to outlast the time it takes for someone to respond. Work backwards from that. If the alarm response is eight minutes away, a three-minute door leaves a five-minute gap, while a ten-minute door closes it.

This is why remote or unstaffed sites specify higher than their threat alone might suggest. A lone substation with a long response time needs the delay to do the heavy lifting, while a staffed reception with guards close by can justify less.

Put the two numbers side by side in the specification: expected attack tools on one side, response time on the other. The rating that covers both is the answer. If the numbers do not meet, add detection earlier or a second barrier rather than chasing a higher rating alone. Our LPS 1175 vs PAS 24 guide helps where the choice is between standards rather than levels, Issue 8 explained decodes the ratings on existing certificates, and all our guides are listed in one place.

Evidence to ask for before you order

Ask for the LPCB Red Book listing first. It confirms the product, the rating and the issue of the standard in one place, and it is the same record an insurer asks for when the rating has to be proved. If the product is not listed, ask why before going further.

Ask who issued the evidence. Third-party evidence comes from an independent test house or certification body, not from the supplier’s own laboratory. A supplier’s own test sheet can support a claim, but it is not the third-party evidence an insurer asks for.

Ask for the certificate itself, naming LPS 1175 Issue 8.2, the exact product, its configuration and its sizes. A certificate that names a different model, a different size range or a different set of options does not cover what is being ordered.

Check the issue on the certificate. Older certificates use SR labels only, because the letter and minute codes arrived with Issue 8. An SR label on its own does not tell you which edition the product was tested to, so ask for the issue number in writing. Our guide to LPS 1175 Issue 8 explained translates the old SR labels into the new codes.

Where the order covers more than one opening, ask for evidence for each configuration. A certificate for a single leaf does not cover a double doorset, and a certificate for one size does not cover a larger leaf.

Compare the submittal with the evidence line by line: product name, configuration, sizes, glazing, ironmongery and fixings. Anything on the submittal that is not on the certificate is not covered by the rating, and the supplier should say so rather than leaving it to be found on site.

Ask for the evidence before the order is placed, not after the doors arrive. A certificate produced after delivery cannot change what was built, and a product that fails the check at that stage means delay while a replacement is made and evidenced.

Three mistakes that waste the rating

The three mistakes below all survive until the doors are on site, which is when they cost the most to fix. None of them is visible in a quotation, and none of them is caught by comparing prices.

Mistake Why it wastes the rating What to do instead
Ordering by the SR name without naming Issue 8 Bidders price to different editions, and the evidence may describe an older test. Write “LPS 1175 Issue 8.2” and the letter-minute code on every order.
Buying a rated leaf without the tested frame, locks and fixings The rating belongs to the tested assembly, so a leaf on its own carries no rating. Order the complete doorset exactly as tested, frame, locks and fixings included.
Assuming better locks can upgrade an existing door to SR3 Locks alone do not create a rated doorset; the leaf, frame and fixings were never tested together. Replace the door, frame and ironmongery with a tested and evidenced SR3 assembly.

None of these mistakes shows up in a brochure or a quotation. They show up when the evidence is checked, so check it before the order is placed. The check takes an afternoon; the fix takes a replacement doorset and a second installation.

SR1, SR2 and SR3 side by side: the quick answer

SR1, SR2 and SR3 are three steps on one scale, and the quick answer is to match the step to the opening, not to the building. SR1, known as A1 under LPS 1175, holds back an opportunist with basic hand tools for 1 minute. SR2, known as B3, holds back an attack with screwdrivers, pliers and hand saws for 3 minutes. SR3, known as C5, holds back an attack with crowbars, drills and chisels for 5 minutes. The number after the letter is the minutes of attack time, and the letter is the tool category. The LPS 1175 guide sets out the full rating table, from A1 to H20.

Rating Old code Tools and time Where it fits
SR1 A1 Basic hand tools, 1 minute A low risk opening where a basic delay is enough
SR2 B3 Screwdrivers, pliers, hand saws, 3 minutes Shops, offices and schools, the usual starting point
SR3 C5 Crowbars, drills, chisels, 5 minutes Rooms that hold cash, stock or equipment worth carrying away

Where A1 fits is the question most buyers skip, because SR2 is the usual starting point and SR1 looks like a lesser door. A1 fits an opening where the risk is opportunist and the delay of 1 minute is enough for the alarm or the response to take over: an internal door in a building that is already guarded at its perimeter, or a store that holds nothing worth carrying away. A1 does not fit a door a person can reach from the street with tools in a bag, because 1 minute against basic hand tools is a short delay once an attacker is unseen.

What changes at each step is the tool set, not only the time. SR2 adds 2 minutes and moves from basic hand tools to screwdrivers, pliers and hand saws. SR3 adds 2 more minutes and moves to crowbars, drills and chisels, which is a different attack: the door must hold against leverage and power, not only against prying. The build steps up at each level, with heavier skins and cores, stronger edge construction and hardware rated for the tools in that category. The frame, fixings and surrounding wall must be specified to match, because a strong leaf in a weak frame is a weak doorset.

The step that wastes money is the step taken without a reason. A door that is ordered at SR3 because SR3 sounds safer, on an opening where SR2 would hold, carries weight and cost the building does not need, and a leaf that is heavier than the frame can carry will sag and open a gap. Work backwards from the response time: how long before someone answers the alarm, and which tool set could be used in that time. The SR2 security doors page covers the usual starting point in full, and the security doors page covers the full doorset range.

Where A1 fits and where it stops

A1 stops where the opening is the only barrier between an attacker and something worth taking. A street facing door, a rear door beside a car park, a door on a building that stands empty at night: each of these needs SR2 at least, because the attacker has time and cover. A1 also stops where the insurer or the risk assessment names a higher rating, because the rating on the schedule is the rating that must be proved, whatever the door looks like.

The check before ordering is the same at every level. Name the rating in full, with the LPS 1175 issue and the letter-minute code, and ask for the test evidence before the order is placed. Evidence asked for after delivery arrives too late to change what was built, so a door that fails the check then means delay while a replacement is made and evidenced. Ask for the complete doorset as tested, with frame, locks and fixings, because the rating belongs to the tested assembly and a leaf on its own carries no rating.

Frequently asked questions

Is SR2 enough for a shop?

For most shops, yes. SR2 covers the hand-tool attack a retail burglary usually involves, and three minutes is a long time against screwdrivers and saws. Step up to SR3 where the shop holds cash, high-value stock or controlled drugs.

What changes in the doorset between SR3 and SR4?

The tool category changes from C to D, so the build steps up accordingly: heavier skins and cores, stronger edge construction and hardware rated for power-tool attack. The frame, fixings and surrounding wall must be specified to match.

Can an SR4 door also be fire rated?

Yes, combined fire and security doorsets are tested to both standards. Name both ratings in the enquiry, for example D10 plus 60 minutes integrity, so the doorset is built and evidenced for each.

Do I need SR3 for a school?

Not automatically. Most school applications are well served by SR2; SR3 enters the picture for specific risks such as server rooms or workshops holding valuable equipment. Check what the site’s risk assessment actually names.

How do I prove the rating to an insurer?

With third-party test evidence: the certificate or Red Book listing stating the product, the rating and the issue of the standard. A supplier’s word is not evidence; the paperwork is.

Which SR level does your building need?Describe the site and the threat and we will recommend a rating within one working day.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.