ArxBridge
Rising Bollard Cost Factors
Rising bollard cost factors: what sets the price of a rated rising bollard line, from the vehicle rating to the pit, the power and one schedule for the site.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
A rising bollard stops a vehicle by rising out of the road, and the price of the line follows the vehicle it must stop, the ground it sits in and the number of bollards on the line. A single bollard guarding a shopfront costs less than a line of bollards guarding a stadium approach, because every part of the order grows with the rating, the count and the ground.
The order starts with the approach, not with the bollard. A narrow lane with one vehicle at a time asks for a different line from a wide forecourt where vehicles arrive in both directions, and a site on flat tarmac asks for different ground works from a site on a slope with services under the road.
The rating, the foundations, the power, the access control and the records all sit inside one schedule, and an order that names each one plainly gets the right bollards on the right line. The ratings in full are in our ISO 22343 vehicle security barriers guide, and the rising bollards page covers the bollards themselves.
- ISO 22343-1Vehicle security barrier ratings
- 1,500 kg to 30,000 kgTest vehicles, car to truck
- 48, 64 or 80 km/hTest speeds for the vehicle
- 1,200 mm / 500 mmProtectUK gap cap and height floor
Where a rising bollard line starts: the approach, the lane and the ground
The approach decides the line. A bollard line sits where vehicles must stop and people must pass, so the lane width, the flow of vehicles and the space beside the lane all belong on the order before the bollard is chosen. A lane that takes one vehicle at a time needs fewer bollards than a forecourt that takes two lanes side by side, and a line that leaves a gap beside the last bollard leaves the approach open.
The ground under the lane decides the foundations. A bollard that must stop a truck needs a pit and a concrete foundation that holds the impact, and the depth of the pit follows the rating, so a higher rating asks for deeper foundations and more concrete. The foundations are covered in our PAS 68 bollard foundations guide.
Walk the approach and note every way a vehicle can reach the building, then set the line by the vehicle it must stop. A staffed entrance faces less risk than a rear approach nobody watches after dark, so the rating follows the line, not the site. The hostile vehicle mitigation page covers the line in full.
Reading the rating on a bollard order: ISO 22343-1 and the vehicle it stops
A rising bollard earns its rating in a live test, with a vehicle driven at it and the result written into one string. Cars from 1,500 kg up to trucks of 30,000 kg are driven at 48, 64 or 80 km/h, and the string records the vehicle class, the speed, the angle and the penetration, so a rating such as V/7500[N3]/80/90:0/0 can be written straight onto the schedule for the line.
Vehicle ratings moved on from PAS 68:2013, and ISO 22343-1:2023 is the standard a schedule should name now. A line that still asks for PAS 68 asks for a rating no test house issues, so write the current standard beside each bollard and the rating beside the standard. The change from PAS 68 and IWA 14-1 to the current standard is worked through in our HVM standards guide.
The rating follows the vehicle, not the bollard. A bollard that must stop a 7,500 kg truck at 80 km/h takes a higher rating than a bollard that must stop a 1,500 kg car at 48 km/h, and the step up the scale adds steel, depth and foundations to the pit, so the rating on the order should match the vehicle the line faces. The vehicle impact ratings page sets out the ratings the order should name.
The test behind the rating: the vehicle, the speed and the penetration
The rating on a rising bollard order is proved to ISO 22343-1, which supersedes PAS 68:2013. The test runs a vehicle of a set mass at a set speed into the barrier and measures how far it gets through, with masses from a 1,500 kg car to a 30,000 kg truck and speeds of 48, 64 or 80 km/h. The rating on the order names the mass, the speed and the penetration, so a bollard that stops a car at 48 km/h carries a different rating from one that stops a truck at 80 km/h.
A rating reads like V/7500[N3]/80/90:0/0, and each part of it names one part of the test. The figures name the vehicle, the mass, the speed and how far it gets through, so the order should carry the whole rating, because a rating with the mass or the speed left out proves nothing about the vehicle the line must stop.
One bollard or a line of them changes the quote, because a single bollard guards one lane and a line guards a whole frontage. The count follows the width of the approach and the gaps between the bollards, with no more than 1,200 mm clear between bollards and a minimum height of 500 mm on the line. A line that stops a vehicle at the bollard and leaves it open at the kerb is no line at all, so the spacing belongs on the order beside the count.
The pit and the foundations are the work under the road, and they decide whether the bollard holds when the vehicle hits it. The pit takes the force of the impact and passes it into the ground, so the depth, the concrete and the steel belong on the order beside the bollard. Utilities and drainage run through the same ground, and the survey that finds them comes before the pit is dug, not after.
The pit, the pump and the round: keeping a rising bollard working
Power and hydraulics drive the cycle that never stops, because a rising bollard lifts and drops through the day. The pump, the motor and the controls take the cycle count of the site, and a bollard that lifts for every vehicle through a gate needs a drive rated for that cycle.
Access control and safety sit beside the bollard, because the parts that keep people safe round a moving bollard matter as much as the parts that stop a vehicle. The reader, the intercom and the safety loop belong on the order beside the bollard, and the fail position must be written on the order, so the bollard drops when the power fails and the way out stays open.
The round that looks after a rising bollard walks the line and stops at each bollard in turn. The pit is checked for water and silt, the seals are checked for wear, the hydraulics are checked for leaks, and the cycle is run to watch the bollard lift and drop cleanly. A fault found on the round is written down the same day against the bollard it belongs to, with the part that failed and the date beside it, so the repair is ordered before the line is left standing open.
| Position | Bollard | Rating | What to check |
|---|---|---|---|
| Single lane | Rising bollard | ISO 22343-1 | Pit, pump, cycle |
| Wide frontage | Line of bollards | ISO 22343-1 | Spacing, height, gaps |
| Staff entrance | Rising bollard | ISO 22343-1 | Reader, loop, fail position |
| Escape route | Fixed bollard | Spacing 1,200 mm | Gap, height, line |
Name the rating, the pit and the power beside every bollard on the order, so the bollard that arrives is the bollard that was tested. The ratings in full are set out in our ISO 22343 vehicle security barriers guide, and the rated options for the line beside the gates are covered in our anti-ram gates and barriers guide. The foundations a bollard stands on are covered in our PAS 68 bollard foundations guide, and the factors behind the quote are set out in our bollard cost factors guide.
One bollard or a line of them: how the count changes the quote
The count of bollards on the line sets the scale of the order. One bollard takes one pit, one motor and one set of controls, and a line of six takes six of each, so the count multiplies every part of the quote, not just the bollards themselves.
The gap beside a bollard and the height of the bollard both belong on the schedule, because ProtectUK guidance puts a 1,200 mm cap on the clear gap and a 500 mm floor under the height. Leave a wider gap and a vehicle slips past the line; fit a lower bollard and a vehicle climbs it.
The fixed bollards between the rising ones close the line where a vehicle could slip through. They sit beside the gate post, along the wall and at the kerb where a vehicle could mount the pavement, and each one takes the same spacing and height as the rising bollards beside it. The security bollards page covers the fixed bollards, and our bollard cost factors guide works through what each step up the scale adds to the build.
The pit and the foundations: the work under the road
The pit is where the quote really lives. A rising bollard drops into a pit in the road, and the pit takes concrete, reinforcement, drainage and a frame that holds the bollard true, so the ground works under the road often cost as much as the bollard above it.
The depth of the pit follows the rating. A higher rating asks for a deeper pit and more concrete, and a pit on ground with a high water table asks for drainage and a pump, because a pit that fills with water leaves the bollard standing in it.
The road must be cut, the pit dug, the concrete poured and the surface reinstated, and each step needs the road closed for the time it takes. A line on a busy road takes longer to build than a line on a quiet yard, and the programme belongs on the order beside the rating. The PAS 68 bollards guide covers the bollards and the foundations they sit in.
Power, hydraulics and the cycle that never stops
A rising bollard moves on power, and the drive decides how fast it rises and how often it can cycle. A hydraulic drive lifts a heavy bollard quickly and holds it up against a vehicle, and an electric drive suits a lighter bollard on a line that cycles less often, so the drive follows the duty, not the catalogue.
The cycle count decides the wear. A bollard on a staff entrance that rises and falls a hundred times a day needs a drive proved for that duty, and a bollard on a service yard that moves once a week needs less, so the daily cycle belongs on the order beside the rating.
When the power goes, the bollard must fail safe, so vehicles and people can still pass. The release on power failure belongs in the specification beside the motor, because a bollard that stays up in a power cut blocks the approach and the escape route alike. The gate automation guide covers how a powered barrier is driven and released.
Access control and safety: the parts that keep people safe around a moving bollard
Access control on a bollard line decides who can lower it, and when. Staff take a card or a fob for the lane they use every day, visitors take the intercom, and a code suits a lane that many hands use, because a code can be changed when staff leave.
A moving bollard is a hazard to anyone standing over it, so the safety devices belong on the order beside the motor. Loops in the road, photocells across the lane and warning lights on the approach each stop the bollard rising under a vehicle or a person, and a line without them has no proven safety at all.
The safety devices must be proved with the bollard, not bought separately and fitted later. A loop that does not see a vehicle, a photocell set too low or a warning light nobody can see each leaves the line unsafe, so the test report must name the devices with the bollard. Our security turnstiles guide covers readers, fobs and biometrics in the lane.
Utilities, drainage and the ground the pit sits in
The ground under a bollard line often holds services, and the pit must not cut through them. Water, gas, power and data each run under the road, and the survey that finds them belongs on the order before the pit is dug, because a pit that strikes a service stops the job and the quote with it.
Drainage decides how long a bollard lasts. A pit that holds water corrodes the bollard from below, so the drain, the sump and the pump belong on the schedule beside the concrete, and the inspection round should look for the pit that no longer drains.
The surface around the pit must be reinstated to the same standard as the road it sits in, because a patch that sinks leaves a dip in the lane and a trip at the kerb. The reinstatement belongs on the order, with the material and the finish named beside the pit. The bollard regulations guide sets out the rules the line must meet.
The bollard order: one schedule for the whole line
Build the enquiry as a specification, with one line for every bollard on the site. Each line names the position, the rating, the diameter and the height, the foundations and the pit, the power and the drive, the access control and the safety devices, and the bollard, the pit and the controls as one line.
Have the test report, the classification and the maintenance schedule travel with the bollards, and file them the day the bollards arrive. The handover pack should name the inspection routine the site will follow, so the record covers the whole life of the line. What each check looks for is set out in the fire door inspection checklist, and the how to specify security doors guide runs through the same discipline column by column.
| Position | Bollard | Rating | What to check |
|---|---|---|---|
| Site entrance | Rising bollard | ISO 22343-1 | Rating, pit, drainage |
| Forecourt line | Rising bollards | ISO 22343-1 | Gap 1,200 mm, height 500 mm |
| Service yard | Rising bollard | ISO 22343-1 | Motor, loops, release |
| Pedestrian area | Fixed bollards | ProtectUK spacing | Spacing, height, fixings |
| Car park exit | Rising bollard | ISO 22343-1 | Reader, loops, self-lowering |
A rising bollard stops a vehicle by rising out of the road, so the rating, the pit, the power and the safety devices must all sit on the same schedule.
What vehicle rating do rising bollards need?
The site decides, by the vehicle the line must stop. ISO 22343-1 tests barriers against vehicles from a 1,500 kg car to a 30,000 kg truck, at 48, 64 or 80 km/h.
Do rising bollards need foundations?
Yes. A rising bollard drops into a pit with concrete foundations, and the depth follows the rating, so the pit and the concrete belong on the order beside the bollard.
What happens to a rising bollard in a power cut?
It must fail safe, so vehicles and people can still pass, and the release belongs in the specification beside the motor.
How wide can the gap beside a rising bollard be?
ProtectUK guidance caps the clear gap at 1,200 mm and sets the minimum height at 500 mm, so a wider gap lets a vehicle through beside the line.
Who checks rising bollards?
The team that runs the site, on the routine the maintenance plan sets. Each record names the bollard, the fault, the repair and the date.
Get a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.