Buying Security Doors and HVM Through Public Frameworks

A framework lets a buyer order security doors or barriers without a full tender. How the Procurement Act 2023 route works and what a supplier must show.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

A public framework lets a buyer place an order for security doors or barriers without running a full tender of its own. This guide explains how frameworks work under the Procurement Act 2023, who runs them, and what a supplier must show to win work through one.

  • Section 45The Act’s framework definition
  • Four yearsUsual maximum framework term
  • Call-offThe order placed under a framework
  • GCAThe largest central buyer

What a framework is, and what a call-off is

The Procurement Act 2023 defines a framework as a contract between a contracting authority and one or more suppliers that provides for the future placing of contracts by that authority with those suppliers. The future contracts are called call-offs. A framework sets out the terms under which those call-offs will be placed, including the price to be paid or how the price will be worked out.

The point is to do the heavy work once. The competition to join the framework tests the suppliers, agrees the terms and fixes the pricing method. A buyer who later needs doors or barriers then places a call-off under those terms instead of running a fresh competition from scratch.

A framework does not commit a buyer to buy anything at all. It is a route to market, not an order. The tender response checklist covers the supplier side of a public tender, and the housing tender guide covers the buyer side of the same process.

Closed frameworks, open frameworks and dynamic markets

A closed framework fixes its list of suppliers for its term. No new supplier can join once it has started. Under the Act the usual maximum term is four years, though a framework for defence or utilities can run for eight years, and a longer term is possible where the nature of the goods or works needs it, with the reason published in the tender or transparency notice.

An open framework is a scheme of successive frameworks on substantially the same terms. New suppliers can join when the framework re-opens. It must re-open at least once in its first three years and at least every five years after that, and it lasts eight years in total. The first framework in the scheme can last at most three years, and the later ones at most five years each.

A dynamic market is a list of qualified suppliers that stays open, so new suppliers can join through its life. Only above-threshold work can be placed under it. The gov.uk guidance on frameworks sets out the rules for each type in full.

Route How suppliers join Longest term When it fits
Closed framework Once, before it starts Four years, or eight for defence and utilities Settled markets
Open framework At each re-opening Eight years across the scheme Fast-moving markets
Dynamic market At any time while it runs No fixed list to close Changing supplier base
Dynamic purchasing system At any time while it runs Under the 2015 rules Older lists still running
Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Who runs the frameworks a buyer can use

A centralised procurement authority carries out procurements for other authorities. It sets up frameworks for others to use and takes responsibility for complying with the Act when it sets the framework up. The buyer who places a call-off under it stays responsible for complying with the Act when it places that call-off.

The Government Commercial Agency is the largest centralised procurement authority in the UK. It was formed on 1 April 2026, combining the Crown Commercial Service with several Cabinet Office central commercial teams. The Crown Commercial Service name still appears in older framework documents, so a buyer may see both names for the same route.

Other centralised procurement authorities include regional purchasing bodies such as ESPO, YPO and NEPO. The gov.uk action plan for the Crown Commercial Service describes how its agreements work for buyers and suppliers.

The checks before you call off

The gov.uk Framework Practice Guide tells buyers to run pre-procurement checks first, starting with the Summarised Search on Find a Tender, which shows the levy, the suppliers on each lot, whether it is an open framework, how many small suppliers it holds, and the value against its length.

The buyer should also check that the framework was set up by a contracting authority, that the notice names the buyer as one allowed to use it, that the framework covers what the buyer needs, and that the total value of call-offs so far has not passed the estimated value in the notice.

One risk: a framework set up by a private operator and merely hosted by a small authority can leave the buyer carrying the provider’s liabilities if the framework was not set up properly. A market assessment made when the framework was set up can also go stale if suppliers have left or merged since. The Operational Requirement guide sets out how a buyer writes down what a site needs before any route is chosen.

How a call-off is placed

A call-off can be placed with or without a competition between the suppliers on the framework, and the selection process must be set out in the framework itself. Where a competition is run, the assessment must rest only on some or all of the criteria used when the framework itself was set up, although those criteria can be refined.

A call-off without a competition is allowed only in two cases: where there is a single supplier on the framework, or where the framework sets out an objective way of choosing the supplier together with the core terms of the call-off. The core terms cannot be changed except under the Act’s rules for modifying a public contract. They cover the deliverables, warranties, charges and pricing method, record keeping, indemnities, termination and variation.

A framework cannot be used to place another framework, or to place a concession contract. A direct placement cannot be used to place a call-off under a framework, and it is not needed: if a direct placement is allowed, the buyer can place the contract directly with any supplier, including one on a framework. The vehicle barrier due diligence guide shows the evidence checks a buyer runs before choosing a barrier supplier.

What the supplier must show

The Act lets a framework set conditions of participation for a call-off. Those conditions must be a proportionate way of making sure the suppliers have the legal and financial capacity and the technical ability to do the work. A condition can repeat one from the framework set-up, or add a new one for the particular call-off, such as bespoke insurance for that job.

Before a call-off is placed, the buyer must check that the supplier is not an excluded supplier. A framework cannot permit a call-off to go to an excluded supplier, so the buyer should check the central debarment list rather than rely on the check made when the framework was set up.

For security doors and barriers, the technical ability check is where the ratings sit. A supplier should be able to show the certificate and the live listing for each product. The LPS 1175 certificate guide runs through the five checks on a certificate, and the Secured by Design listing guide does the same for a scheme listing. The mixing standards guide shows the schedule mistakes that make a call-off hard to answer.

A framework is a route to market, not a shortcut past the rules. The checks still happen, they just happen at a different point.

After the call-off: who owns what

Once a call-off is placed, the buyer owns the relationship. The buyer sets the call-off key performance indicators, watches them, and tells the framework provider if a systemic problem appears. The buyer also watches the supplier’s financial standing through the life of the contract.

Contracting authorities must publish a contract notice after a call-off is placed, and buyers using a framework must link their notices to the framework provider’s notices on the central digital platform. Fees can only be charged to suppliers that have been given a call-off, as a fixed percentage of its estimated value, and no fee can be charged for access to the framework itself.

PPN 023, issued in November 2025, sets the thresholds for procurements that start on or after 1 January 2026. Central government goods and services sit at £135,018, sub-central bodies at £207,720, works at £5,193,000 and light touch contracts at £663,540. Under the same note, central government bodies must publish contracts of £12,000 or more, and other public bodies must publish contracts of £30,000 or more, on the central digital platform. The forced entry, ballistic and blast guide helps a buyer name the rating family the call-off must ask for, and the installation handover guide runs through the checks a buyer makes when the product arrives on site.

Can a buyer place a call-off with any supplier?

No. A call-off can only go to a supplier on that framework, and only for goods, services or works the framework covers.

How long can a framework run?

Four years is the usual maximum, or eight years for defence and utilities. An open framework lasts eight years in total.

What is the difference between a framework and a dynamic market?

A framework holds a fixed list of suppliers for its term, and call-offs go to suppliers on that list. A dynamic market stays open, so new suppliers can join at any time.

Must a notice be published after a call-off?

Yes. A contract notice must go out after a call-off is placed.

Can a private company run a framework?

No. Only a contracting authority can establish a framework. A private operator can only set one up as the agent of a named contracting authority.

Buying security doors or barriers through a framework?Send the framework name and the ratings it must cover.
Contact us for a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? LPS 1175 Windows and Walling Explained Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.