Tender Evaluation Criteria and Scoring for Security Doors and HVM
How a buyer scores bids for security doors and barriers: the criteria, the weighting between quality and price, and what every bidder is told afterwards.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
A tender for security doors and barriers is not won on price alone. The buyer scores every bid against criteria published before the tender opens, and the contract goes to the bid that best meets them. This guide explains how those criteria are set, how the marks are given, and what a bidder should watch for.
- Section 19The rule for choosing the winner
- Section 23The criteria and how they are set
- Most advantageous tenderThe basis of the choice
- Life-cycle costThe price the buyer weighs
The most advantageous tender, not the cheapest
Under the Procurement Act 2023 the contract goes to the most advantageous tender: the bid that meets the buyer’s requirements and best meets the criteria the buyer published. The Act replaced the old “most economically advantageous tender” with the new name: the lowest price need not win, and price need not come first.
That matters for security doors and barriers, where the cheapest leaf may carry no evidence, no record and no maintenance behind it. A bid that costs less on the day can cost more over the life of the building, in repairs and in doors replaced early.
The rules sit in sections 19, 23 and 24 of the Act. Section 19 sets how the contract is given after a competitive tender. Section 23 sets the criteria. Section 24 sets when the criteria may be refined. The gov.uk guidance on assessing competitive tenders sets out the three sections together.
What the criteria must do
Every criterion must do four things. It must relate to the subject of the contract, be clear, measurable and specific, follow the rules on technical specifications, and be a proportionate way to judge the bids.
The buyer may set criteria on price, on quality and on wider matters such as social value, where those relate to the contract and meet the same four tests. The criteria must be published with the method the buyer will use to mark them, so every bidder prepares against the same test.
The criteria are not the conditions of participation. The conditions test whether a supplier can do the work at all: legal and financial standing, and technical ability. The criteria test the merits of the bid itself. The Operational Requirement guide turns the threat into a written requirement, and the specification guide gives the bidder a checklist to price against.
Quality against price: how the split works
Where more than one criterion is used, the buyer must say how much each one counts. The usual way is a weighting: each criterion takes a percentage of the total, and the percentages add to one hundred. The buyer may also rank the criteria, or describe the split in another way.
For a security door and barrier package, the split often puts quality first. A criterion on the evidence behind each door, the certificate, the listing and the test report, tests what the bid proves. A criterion on the programme tests whether the supplier can survey, make and fit the doors in the order the site needs.
Value for money is the best blend of economy, efficiency and effectiveness over the whole life of the contract, so the buyer should weigh the life-cycle cost, not the purchase price alone, except for basic purchases. The frameworks guide covers buying through a framework, and the route the buyer takes to market.
The scoring scale and what a mark means
The method the buyer publishes must say how each bid is marked. The usual form is a scoring matrix: each criterion carries a scale, often from zero to five, with a short description of what each mark asks for. The evaluator reads the bid against the description and gives the mark the bid earns.
The marks are then weighted and added. A criterion weighted at 40% counts for 40% of the total, whatever its raw mark. A bid that scores five on a small criterion and two on a large one loses to a bid that scores well where the weight sits. The buyer should test the method on a sample bid before it is published.
The guidance warns against relative scoring on price, where a bidder’s price mark comes from the lowest price on the table. A small gap in price can then swing the whole result. The tender response checklist names the documents the supplier needs once the competition opens.
The tender that is too cheap
A price that looks too low is not thrown out on sight. The buyer is not required to ask the supplier to explain it, but must look into it, and must give the supplier a fair chance to show it can do the work at the price offered, before the bid is set aside on that ground.
A low price may have a sound reason behind it: a cheaper way of making the doors, or savings from doing several sites at once. It may also come from a mistake in the costing, so the buyer must ask what lies behind the price and judge the answer on the evidence.
A supplier that can show the work is covered at the price keeps its bid in the running. A supplier that does not show it is set aside, and the buyer records the reason. The test report guide helps the buyer read the evidence behind a door.
Changing the criteria once the tender opens
In a competitive flexible procedure the buyer may refine the criteria as the tender runs, but only within limits. The buyer may add detail to a criterion already published, or move a weighting inside a range already published. The buyer may not add a new main criterion, or a sub-criterion that belongs to none of the published criteria, or add or remove a pass or fail test, or turn a fail into a pass.
The chance to refine must be written into the tender notice or the tender documents from the start, and any change must be made before the final tenders are invited. The buyer must then change and republish the documents the change touches, so every bidder works from the same text.
The rule protects the bidders that fell out early: a change that would have let a supplier through an earlier round, had it been made sooner, is not allowed. The preliminary market engagement guide covers the talks a public buyer holds with the market before the tender, and the mixing standards guide names the three standards and the proof each one needs.
What the buyer tells every bidder afterwards
Before the contract notice is published, the buyer must send an assessment summary to every bidder whose bid was marked. The summary says why the bid won or lost, in terms the bidder can follow. The summaries must reach the bidders before the contract notice starts the standstill period.
The summary names each criterion and its weighting, the mark the bid earned on each and the total, and the reason for each mark. A bidder that lost also receives the same information about the winning bid, with confidential details removed, so it can see where the winning bid scored better.
A bid that fails a pass or fail test need not be marked further, but the buyer must have said so in the method. No summary is needed where the contract is placed under a framework or placed directly. The gov.uk guidance on assessment summaries sets out what each summary must hold. The housing tender guide covers the tender a housing provider writes for its own stock, the layered security guide places the doors among the wider measures of the site, and the lead times guide and the warranty guide cover the programme and the terms the buyer should have in writing.
| Criterion | What it tests | How it is scored |
|---|---|---|
| Evidence of rating | Certificate and listing behind each door | Mark for the documents |
| Programme and method | Survey, manufacture and fitting | Mark for the plan |
| Whole-life cost | Price, maintenance and replacement | Mark for the life-cycle figure |
| Maintenance and record | Visits, parts and the record | Mark for the contract terms |
| Wider value | Social value and carbon | Mark where the contract names it |
The criteria are published before the bids arrive. A bid is marked against the test the buyer wrote, not the test the bidder hoped for.
Must the lowest price win?
No. The most advantageous tender wins, and price need not come first. A cheaper bid can still lose on quality.
What must a criterion do?
Each criterion must relate to the contract, be clear and specific, follow the technical specification rules, and fit the size and cost of the contract.
How does the buyer show how much each criterion counts?
By weighting each one as a percentage, by ranking them, or by describing the split in another way. The split is published with the criteria.
Can the buyer change the criteria during the tender?
Only in a competitive flexible procedure, by adding detail to what was published within a range already set. No new main criterion.
What does a losing bidder receive?
An assessment summary before the contract notice is published, with the marks, the reasons, and the same information about the winning bid.
Contact us for a free quote
Related
More in guides for specifiers
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.