What an LPS 1175 rating covers on windows and walling: the tested assembly of pane, frame, beads, seals and fixings, and what the rating does not prove.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed across the UK
Prefer to talk?+44 7352 267239

Get a free project quote

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

A rated window is not a strong pane in an ordinary frame. It is a tested assembly of pane, frame, beads, seals, fixings and hardware, and the rating belongs to the whole assembly as it was tested. A pane that held its rating in one frame carries no rating at all in a different frame, because the test never covered that combination. The same rule holds for the wall around the window: a rated window fixed into a wall that cannot hold it is not a rated opening, because the attacker goes through the wall beside the frame, not through the glass.

LPS 1175 covers windows and walling as part of its scope. Issue 8 of the standard lists windows, secondary glazing systems, curtain walling systems, cladding systems and walls among the products and systems it tests and certifies, beside doors, shutters, grilles, gates and fences. The rating works the same way on a window as it does on a door: a letter for the tool category, from A to H, and a number for the minutes of attack time the product must resist. A window rated C5 held for five minutes against category C tools, crowbars, drills and chisels. A window rated B3 held for three minutes against category B tools, screwdrivers, pliers and hand saws. Our LPS 1175 standard page carries the full rating table from A1 to H20, and our LPS 1175 Issue 8 guide works through how the old SR1 to SR8 labels map to the new codes.

The sections below work through the window first, then the wall, then the glass standards that sit beside LPS 1175, then fire and security on one window, then the moving parts, then what the rating does not prove and the mistakes that break an order. Our fire rated windows guide covers the fire side of a window in full, and our security windows page covers the range of rated windows for commercial buildings.

  • LPS 1175Windows, walling and curtain walling in scope
  • LPS 1270Security glazing, hand, arm and body passage
  • EN 356Manual attack glazing, P1A to P8B
  • EN 1627Burglar resistance, RC1 to RC6

A window is only as strong as its frame

An attacker who cannot break the glass will attack the frame. The beads that hold the pane, the fixings that hold the frame to the wall, and the locks and handles on an openable sash are all part of the route in, and an LPS 1175 test attacks them all. The test team works against the locked window as it would be installed, using only the tools permitted for the rating being tested, for the stated number of minutes. A window that holds its pane but gives way at the beads has failed, and a window that holds its frame but gives way at the handle has failed.

Beads are the small part that decides the rating most often. A bead that can be prised out with a screwdriver lets the pane fall out of the frame, and the rating is lost whatever the glass could have held. The same discipline applies to the seals: intumescent seals close the gap in a fire, and the seals on a rated window must be the ones the test evidence names, fitted where the evidence puts them.

Fixings decide whether the frame stays in the wall. A frame held by too few fixings, or by fixings into a substrate that cannot hold them, can be levered out as one piece. The fixing schedule should name the number, the type and the spacing of the fixings, and the substrate they go into. Our how to specify security doors guide covers the same discipline for doorsets, and our types of security doors guide sets out the range of rated products a building may need. The window order should name the pane, the frame, the beads, the seals, the fixings and the hardware as one assembly, and the evidence should name the same assembly.

What an LPS 1175 rating covers on a window

An LPS 1175 rating on a window covers the complete tested assembly at the stated tool category and time. The rating is written as a letter and a number, and both halves must be read together. A1 is one minute against category A tools, basic hand tools. B3 is three minutes against category B tools. C5 is five minutes against category C tools. D10 is ten minutes against category D tools, sledgehammers, disc cutters and jigsaws. E10, F10 and G10 are ten minutes against heavier tool sets, and H20 is twenty minutes against extreme tools. From D10 upward the attack time stays at ten minutes while the tool sets get heavier, and only H20 extends the time to twenty minutes.

The rating covers the window in the size and configuration that was tested. A window tested at one size is not rated at every size, and a window tested as fixed is not rated as openable. The test evidence names the sizes, the configuration and the options, and the order should stay inside them. A larger pane, a wider frame or an added opener takes the window outside the tested design unless the evidence covers it. Where a project needs several sizes, ask which sizes the evidence covers before the order is placed, and check that every size on the schedule sits inside the tested range.

The rating also covers the window only as installed. A rated window fitted with the wrong fixings, into the wrong wall, or with a bead system the evidence does not name, has no proven rating. Our guide to keeping an LPS 1175 rating valid sets out the changes that void a rating after handover, and the inspection routine that keeps it alive.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Walling: the wall is part of the rating

A window rating is only as good as the wall around it. LPS 1175 Issue 8 lists walls among the products and systems it tests, because an attacker who cannot beat the window will attack the wall beside it. A solid masonry wall holds a frame and resists hand tools. A lightweight wall of insulated sheet cladding does not, unless it is lined or reinforced to resist the same attack. Where a wall is lightweight, the specification should name the lining or reinforcement that lets it hold the frame, and the wall build up should be agreed before the window order is placed, not discovered on site.

The junction between the window and the wall is the point to check on site. The gap around the frame must be sealed with the material the evidence names, and the frame must be fixed to the structure behind the wall, not to a board that cannot hold a fixing. A gap left unsealed is a route for smoke in a fire and a starting point for a lever in an attack.

Glass under LPS 1175, LPS 1270 and EN 356

Three standards rate glass against attack, and each answers a different question. LPS 1175 rates the complete window assembly, pane and frame together, against a tool category and a time. LPS 1270 rates the glass itself against manual attack, with a three digit rating for hand hole, arm hole and body passage resistance. Each digit stands for one of those three attack goals, and a higher digit means the glass holds out longer against the tools used to make that opening. A ticket window needs to stop a hand reaching through, while a full height screen may need to stop an intruder climbing through, and the digits let a specifier match the glass to the threat.

EN 356 is the European standard for security glazing against manual attack, and it rates glass in eight classes from P1A to P8B. The lower classes, P1A to P5A, are tested by dropping a 4.11 kg steel ball onto the glass from increasing heights: 1,500 mm for P1A, 3,000 mm for P2A, 6,000 mm for P3A and 9,000 mm for P4A, with P5A using three sets of three drops from 9,000 mm. The higher classes, P6B to P8B, are tested with a hammer and an axe: P6B needs 30 to 50 blows to create a 400 mm by 400 mm opening, P7B needs 51 to 70 blows, and P8B needs more than 70 blows. Our LPS 1270 security glazing page covers the three digit rating in full, and our fire rated windows guide covers how glass, frame and beads are tested together.

The three standards should be specified together, not instead of each other. LPS 1270 rates the glass, LPS 1175 rates the assembly, and EN 356 rates the glass against a European manual attack test. On a window, specify the glass to LPS 1270 or EN 356 and the complete unit to LPS 1175, so neither the pane nor the frame is the weak point. A pane rated P8B in a frame rated B3 is a B3 window, because the frame gives way first. A pane rated P1A in a frame rated D10 is a window with a weak pane, because the glass gives way first. The rating of the assembly is the rating of its weakest part.

Standard What it rates Rating format Test in brief
LPS 1175 Complete window assembly Letter A to H plus minutes, A1 to H20 Timed attack with the tool category for the rating
LPS 1270 Glass against manual attack Three digits: hand, arm, body passage Manual attack to make a hand, arm or body opening
EN 356 Glass against manual attack P1A to P8B Steel ball drop P1A to P5A, hammer and axe P6B to P8B
EN 1627 Doors, windows, curtain walling, grilles, shutters RC1 to RC6 Burglar resistance test with defined tools and time

Fire and security on one window

Many windows must do two jobs: hold fire and resist forced entry. A window in a compartment wall must hold fire for the period the fire strategy names, and a ground floor window must also resist an attack. The two jobs need two sets of evidence on one assembly: a fire classification to EN 1634-1 and a forced entry rating to LPS 1175. A pane that holds fire can still be prised from its frame, and a pane that resists attack can still fail in a fire. Our dual certification guide works through how fire and security sit on one assembly, and our fire rated glazed doors page covers the glazed doorset that carries both jobs most often.

Fire ratings on windows use the letters E, EW and EI with the minutes. EI adds an insulation limit on temperature rise on the safe side, an average of 140 degrees Celsius and a maximum of 180 degrees Celsius, and escape routes usually need EI because people pass close to the window. A window rated EI60 in a 30 minute wall gives a 30 minute opening, and a window rated EI30 in a 60 minute wall gives a 30 minute opening too. The wall and the window are one decision, and the fire strategy names the period for each opening. Smoke control needs its own evidence to BS EN 1634-3, Sa or S200, where the fire strategy asks for it, because a fire rating on its own does not prove smoke control.

Ordering a window that must do both jobs means ordering the evidence for both jobs. The test report, the classification and the hardware schedule should arrive with the window, and the handover pack should name the inspection routine the building will follow. A window ordered with fire evidence only is a window with no proven security rating, and a window ordered with security evidence only is a window with no proven fire rating. Ask for both, on the same assembly, before the order is placed.

Sashes, handles and locks: the moving parts of a rated window

A fixed window has no moving parts, and its rating rests on the pane, the frame, the beads and the fixings. An openable window adds a sash, hinges, a handle and a lock, and each of those is a part the test attacks. The sash must close squarely into the frame, the hinges must carry the sash without dropping, and the lock must hold the sash shut against the tools for the rating. A sash that has dropped lets the lock miss its keep, and a window whose lock misses its keep has no forced entry rating, whatever the pane could have held.

Handles and locks must be the ones named in the test evidence. A handle swapped for a neater one takes the window outside its evidence if the evidence names a different handle, and a lock fitted with the wrong keep does the same. The hardware schedule should name every part: the hinges, the handle, the lock, the keeps and the restrictors where they are fitted. A window that must stand open for air needs a restrictor or a release that closes the sash when the alarm sounds, because a sash left open has no fire performance at all, and a sash held open with a wedge is a sash that cannot close in a fire.

What a window rating does not prove

A rating on a window proves one thing: the tested assembly held its rating in the test. It proves nothing else. Treat the certificate as a narrow statement, and ask what it leaves out before the order is placed.

It does not prove the glass suits the frame. A pane that carries a fire class or a security class in one frame carries no rating at all in a different frame, because the test never covered that combination. It does not prove the window holds as long as the wall. A window rated to hold for 60 minutes in a 30 minute wall gives a 30 minute opening, and the wall and the window must be specified together. It does not prove the window is checked. The rating was earned on the day of the test, and a window that has never been inspected since may have a dropped sash, a prised bead or a lock that misses its keep.

It does not prove the building is secure. A rated window on the ground floor and an unrated window on the first floor above a flat roof leaves a route in over the top, and a rated window beside an unrated wall leaves a route in around the side. The rating covers one opening. Security covers the whole building, and the specification should work through the openings one by one, naming the rating for each, so no opening is left as the easy route.

Mistakes that break a rated window order

Most rated window orders fail in small ways. Each mistake below has the same result: a window that looks right and cannot be proved.

The first mistake is ordering the pane without the frame. The rating belongs to the tested assembly, not the glass alone, so order pane, frame, beads, seals and fixings as one assembly. The second is swapping the beads on site. A neater bead takes the window outside its evidence, so fit only the bead system the test evidence names. The third is leaving the gap around the frame unsealed. The compartment line is broken beside the window, so seal the gap with the material the evidence names. The fourth is painting over the intumescent seals. The seals cannot expand when heat reaches them, so tell the decorators the seals are never to be coated. The fifth is fitting a handle or a lock the evidence does not name. The hardware schedule is part of the tested assembly, so fit only the hardware the evidence names.

Keep the evidence with the windows. The test report, the classification and the hardware schedule should travel with the assembly, and the handover pack should name the wall build up, the fixing schedule and the inspection routine. For the glass behind the order, see our fire rated windows guide, and for how fire and security sit on one assembly, see our dual certification guide.

A rated pane in an untested frame is not a rated window. The rating belongs to the assembly, and the assembly includes the frame, the beads, the seals and the wall behind them.

Does LPS 1175 cover windows and walling?

Yes. LPS 1175 Issue 8 lists windows, secondary glazing systems, curtain walling systems, cladding systems and walls among the products and systems it tests and certifies, beside doors, shutters, grilles, gates and fences. The rating works the same way on a window as on a door: a letter for the tool category and a number for the minutes of attack time.

What is the difference between LPS 1175 and LPS 1270 on a window?

LPS 1175 rates the complete window assembly, pane and frame together, against a tool category and a time. LPS 1270 rates the glass itself against manual attack, with a three digit rating for hand hole, arm hole and body passage resistance. Specify both: the glass to LPS 1270 and the complete unit to LPS 1175, so neither the pane nor the frame is the weak point.

What does EN 356 P6B mean for a window?

EN 356 is the European standard for security glazing against manual attack. P6B means the glass withstood 30 to 50 hammer and axe blows before a 400 mm by 400 mm opening could be created. P7B needs 51 to 70 blows and P8B needs more than 70 blows. The lower classes P1A to P5A are tested with a steel ball drop instead.

Can one window carry a fire rating and an LPS 1175 rating?

Yes, where both sets of evidence cover the same assembly. The fire classification comes from a test to EN 1634-1 and the forced entry rating from a test to LPS 1175, and the two must be proved on the same window. A pane that holds fire can still be prised from its frame, and a pane that resists attack can still fail in a fire.

What should a rated window order name for each opening?

The position, the LPS 1175 rating in full, the glass rating to LPS 1270 or EN 356, the fire rating where one is needed, and the pane, the frame, the beads, the seals, the fixings and the hardware as one assembly. The test report, the classification and the hardware schedule should arrive with the window.

The frame, the fixings and the wall: the parts buyers forget

A rated window is a tested assembly, and the glass is only one part of it. The frame, the fixings, the beads and the wall around the opening all carry the rating together, so a rated pane in an untested frame is not a rated window. A window that was tested in a steel frame proves nothing about the same glass in a timber frame, and a change to any part can break the tested construction.

Start with the wall. LPS 1175 rates walling as well as windows, and a rated window set into a wall that was never tested leaves the opening unproven. Walk the opening before ordering, and note the wall construction, the reveal and the fixings that will hold the frame. Where the wall cannot take the fixings, the frame must be designed for the wall that is there, not the wall the drawing assumed.

The moving parts decide how long the rating lasts in use. Sashes, handles and locks work every day, and a handle that has loosened lets the sash sit short of the seal. Check the gaps on the same visit: a 4 mm gap around the leaf is the usual limit, and a seal that has shrunk leaves a path past the glass. Intumescent seals close the gap in a fire by expanding at roughly 200 to 250 degrees, so check that the seals are whole and fixed, and that no seal has been painted over. Our fire rated windows guide sets out how glass, frame and beads are tested together as one assembly.

PAS 24 is the enhanced security standard for doorsets, and Secured by Design is a scheme, not a rating: a scheme mark on its own proves nothing about resistance, so ask for the test rating behind it. The same rule holds for a window: a scheme mark without a test rating is a label, not proof.

Ordering a rated window: the evidence that must travel with it

Order the window as one assembly, naming the glass, the frame, the beads, the seals and the hardware, and the wall the frame will fix into. Ask for the test report and the classification naming the exact window before the order is placed. Where the window must also hold fire, the fire classification comes from a test to EN 1634-1, and FD30 and FD60 name the minutes the assembly holds in the furnace test.

Glass ratings need the same care. Under LPS 1270, a three-digit code names hand, arm and body passage, so a pane that stops a hand may still pass an arm. EN 356 sets P1A to P8B for manual attack on glass, and EN 1627 sets resistance classes RC1 to RC6 for windows, doors and shutters. Ask which standard tested the glass, and read the rating whole before ordering. Our fire rated glazed doors page covers the doors that pair rated glass with a rated frame.

A window rating does not prove the room behind it. A rated window in a room with an unrated door leaves the room open through the door, so check every opening in the room on the same schedule. The same discipline, column by column, is covered in our how to specify security doors guide.

Part What to check Why it matters
Glass Standard and rating named on the report The pane alone is not the window
Frame and fixings Tested frame, fixings suit the wall A change breaks the tested assembly
Seals and gaps 4 mm gap, seals whole and fixed A gap past the glass defeats the rating
Test evidence Report naming the exact window A rating for another window proves nothing

File the test report, the classification and the hardware schedule with the order, so the next specifier can see what the rating rests on.

Specifying rated windows or walling?Send the opening schedule and the threat for a tested assembly quotation.
Get a free quote

Related

More in guides for specifiers

10 mistakes when specifying certified security doors 10 steps to specify an LPS 1175 door Acceptance and Snagging of a Security Door or Barrier Job Access Control Doors Acoustic Doors: Ratings and Specification After a Forced Entry Attempt: Checking a Security Door Airport Security Doors Anti-Ligature Doors for Mental Health Wards Anti-Ram Bollards Anti-ram gates and barriers: protecting vehicle entrances Arcade Security Doors Explained Automatic Doors Automatic Gates Cost Factors Automatic Vehicle Barriers Ballistic Panels Bank Security Doors Bingo Hall Security Doors Explained Blast doors: glazed vs solid and how they are rated Blast protection window film: what it does and what it cannot do Blast resistant windows: what drives the cost and how to specify them Bollard Cost Factors Explained Bollard regulations in the UK: spacing, height and depth Bookmaker Security Doors Explained Builders Merchant Security Doors Bullet Resistant Glass Cost Factors Bullet resistant glass ratings explained: BR1 to BR7 and SG classes Bullet resistant vs bulletproof glass: what the difference means Buying Security Doors and HVM Through Public Frameworks Car Park Security Doors Explained Car Showroom Security Doors Casino Security Doors Explained CDM 2015 Duties When Security Doors, Shutters or HVM Are Installed Cinema Security Doors Cleanroom Doors Cold Store Doors College Security Doors Commissioning, Handover and the O&M Manual for Security Doors and HVM Communal entrance doors for flats: Secured by Design and what to specify Community Centre Security Doors Control Room Doors Court Security Doors Crash Rated Fences and HVM Fencing Explained Data centre physical security: doors, glazing, HVM and shielding by zone Dental Practice Security Doors Depot Security Doors Explained Door Entry Systems Due Diligence When Selecting Vehicle Security Barriers Emergency Exit Doors EMP Shielding Cost Factors Explained Exhibition Centre Fire Door Rules Exhibition Centre Security Doors Factory Security Doors Faraday cage vs RF shielded room: what a business needs FB4 vs FB6 vs FB7: how to choose a ballistic rating Fire and security doors: how dual certification works Fire Compartmentation Fire Curtains Fire Door Certification Fire Door Closers Explained Fire Door Cost Factors Fire Door Duties of the Accountable Person Fire Door Gaps Fire Door Hardware Explained Fire door inspection checklist for steel and timber doors Fire Door Maintenance Fire Door Regulations Care Homes Fire Door Regulations for A and E Departments Fire Door Regulations for Airports Explained Fire Door Regulations for Bowls Clubs Fire door regulations for commercial buildings in the UK Fire Door Regulations for Dialysis Centres Fire Door Regulations for Hockey Clubs Fire Door Regulations for Hospitals Explained Fire Door Regulations for Offices Explained Fire Door Regulations for Operating Theatres Fire Door Regulations for Retail Explained Fire Door Regulations for Schools Explained Fire Door Regulations for Snooker Clubs Fire Door Regulations for Stadiums Fire Door Regulations for Student Accommodation Fire Door Regulations for Warehouses Fire Door Regulations Leisure Centres Fire Door Regulations Restaurants Fire Door Remediation Programme for Housing Providers Fire Door Rules for Badminton Clubs Fire Door Rules for Bingo Halls Fire Door Rules for Bookmakers Fire Door Rules for Bowling Alleys Fire Door Rules for Car Parks Fire Door Rules for Car Showrooms Fire Door Rules for Cinemas Fire Door Rules for Climbing Centres Fire Door Rules for Colleges Fire Door Rules for Community Centres Fire Door Rules for Cricket Clubs Fire Door Rules for Dental Practices Fire Door Rules for Depots Explained Fire Door Rules for Golf Clubs Fire Door Rules for GP Surgeries Fire Door Rules for Gyms Explained Fire Door Rules for Ice Rinks Fire Door Rules for Maternity Units Fire Door Rules for Mental Health Units Fire Door Rules for Museums Fire Door Rules for Oncology Units Fire Door Rules for Opticians Fire Door Rules for Pawnbrokers Fire Door Rules for Petrol Stations Fire Door Rules for Pharmacies Fire Door Rules for Ports Fire Door Rules for Post Offices Fire Door Rules for Prisons Fire Door Rules for Rehabilitation Centres Fire Door Rules for Self Storage Fire Door Rules for Shopping Centres Fire Door Rules for Squash Clubs Fire Door Rules for Supermarkets Fire Door Rules for Swimming Pools Fire Door Rules for Tennis Clubs Fire Door Rules for Theatres Fire Door Rules for UK Arcades Fire Door Rules for UK Casinos Fire Door Rules for UK Hospices Fire Door Rules for Walk-in Centres Fire Door Signage Fire Door Vision Panels Fire Doors and Gateway 2 in Higher-Risk Buildings Fire Rated Glass Cost Explained Fire Rated Sliding Doors Explained Fire Rated Windows Cost Factors Fire Rated Windows Explained Fire Safety Enforcement Notices and Fire Doors: What the Responsible Person Must Do Flat Entrance Doors: PAS 24 and Fire Rated Forced Entry vs Ballistic vs Blast: Which Rating a Site Needs Garage Security Doors Explained Gate Automation Explained Golden Thread Records for Fire Doors GP Surgery Security Doors Explained Gym Security Doors Explained High Speed Doors HMO Fire Doors Hospice Security Doors Explained Hospital Security Doors: Wards, A&E, Plant Hospital Security Gates Hotel Fire Doors Hotel Security Doors How to choose HVM bollards: fixed, shallow mount, removable and automatic How to keep an LPS 1175 door rating valid after installation How to Specify Fire Doors in a Housing Tender How to specify security doors: a checklist for architects How to Verify a Secured by Design Listing How to Verify an LPS 1175 Certificate on Red Book Live How to Write an Operational Requirement for Physical Security HVM planters and street furniture: protection that blends in In-Service Care of Vehicle Security Barriers Installation Handover: LPS 1175 Doors and PAS 68 Barriers Intumescent Seals ISO 16933 explained: EXV and SB classes and hazard ratings ISO 22343 vehicle security barriers explained Keeping a Dual-Certified Fire and Security Door Valid in Service Laboratory Security Doors Layered Security for a Site: Deter, Detect, Delay, Mitigate, Respond Lead Times and Programme Risks for LPS 1175 Doors Leisure Centre Security Doors Library Security Doors Listed Building Fire Doors Loading Bay Doors Explained Lockdown and Access Control Hardware on an LPS 1175 Door LPS 1175 Gates and Grilles Explained LPS 1175 Issue 8 explained: from SR1 to SR8 to A1 to H20 LPS 1175 Roller Shutters LPS 1175 vs ASTM F2781 and Other US Ratings Explained LPS 1175 vs EN 1627: how UK and European burglar resistance ratings compare LPS 1175 vs PAS 24: which security standard does your door need? Martyn’s Law and Places of Worship: What a Buyer Checks for Doors and Entry Control Martyn’s Law Enhanced Tier: Physical Measures and the Specifier Brief Martyn’s Law Standard Tier: Procedures, Doors and Shutters Martyn’s Law Timeline and the SIA Regulator Martyn’s Law: what premises must do and which physical measures to consider Master Key Systems MRI and RF shielded rooms: how they work and what to specify Museum Security Doors NPSA Catalogue of Security Equipment (CSE) Explained NPSA Forced Entry and Blast Guidance for Government Sites NPSA Guidance on Lockdown and Marauding Attack: What It Asks of Doors and Entrances Office Security Doors Optician Security Doors Explained Panic Hardware PAS 24 requirements for doors and windows explained PAS 68 Bollard Foundations Explained PAS 68 bollards: ratings, spacing and cost factors PAS 68 vs IWA 14 vs ISO 22343: hostile vehicle mitigation standards explained Pawnbroker Security Doors Explained Pedestrian Gates Petrol Station Security Doors Pharmacy Security Doors Planning Permission for Security Shutters, Gates and Bollards on Commercial Premises Plant room doors: fire, security and ventilation requirements Plant Room Fire Doors Port Security Doors Post Office Security Doors Explained Powder coating vs galvanising vs paint for steel Preliminary Market Engagement for Security Doors and HVM Prison Security Doors Programming a Security Door and Barrier Package on a Live Site Public-Sector Tender Response Checklist for Security Door and HVM Supply Reading a PAS 24 and SBD Door Test Report Regulation 38 Fire Safety Information at Handover for Fire-Rated Security Doorsets Replacing Security Doors in an Occupied Building Restaurant Security Doors Retail Security Doors Revolving Doors RF shielding standards and how shielded rooms are tested Rising Bollard Cost Factors Road Blocker Cost Factors Explained Road Blockers Explained Roller Shutter Cost Factors: What Drives the Price Roller shutter regulations in the UK: safety and maintenance Safe room and panic room doors: specification basics Safety Duties for Powered Doors, Gates and Barriers on Commercial Sites School Security Doors Sectional Doors Secured by Design explained: is it mandatory for doors? Secured by Design vs NPSA vs LPCB: Which One You Need Security Door Locks Security Door Maintenance Checklist Security Doors and Access for Everyone: What Approved Document M Asks Security Doors for A and E Departments Security Doors for Badminton Clubs Security Doors for Bowling Alleys Security Doors for Bowls Clubs Security Doors for Climbing Centres Security Doors for Cricket Clubs Security Doors for Dialysis Centres Security Doors for Golf Clubs Security Doors for Hockey Clubs Security Doors for Ice Rinks Security Doors for Maternity Units Security Doors for Mental Health Units Security Doors for Oncology Units Security Doors for Operating Theatres Security Doors for Rehabilitation Centres Security Doors for Snooker Clubs Security Doors for Squash Clubs Security Doors for Swimming Pools Security Doors for Tennis Clubs Security Doors for Walk-in Centres Security Doors West Midlands Explained Security Fencing Security Gates Cost Factors Explained Security shutters vs high performance roller doors Security shutters vs retractable grilles: which suits retail and commercial openings? Security Turnstiles Explained Security Window Film Security Windows for Schools Explained Self Storage Security Doors Server Room Doors Explained Shopping Centre Security Doors Smoke Control Doors Explained Smoke Curtains Specification Mistakes When Mixing LPS 1175, PAS 24 and SBD in One Tender SR2 vs SR3 vs SR4 security doors: choosing the right LPS 1175 level Stadium Security Doors Steel Door Frames Steel vs aluminium security doors: strength, ratings and looks Steel vs timber fire doors: which suits your building? Student Accommodation Security Doors Substation doors: security, ventilation and specification Supermarket Security Doors Telescopic Bollards Tender Evaluation Criteria and Scoring for Security Doors and HVM The Scope of a Maintenance Contract for Security Doors and Barriers Theatre Security Doors Thermal and Weather Performance of External Security Doorsets Thermally broken steel security doors: U-values and certification Traffic Calming as Hostile Vehicle Mitigation Transport hub security requirements Turnstile Cost Factors Explained Turnstile vs speed gate vs security portal: choosing entrance control Types of security doors for commercial buildings University Security Doors Explained Vehicle Dynamics Assessment: What It Tells the Buyer Before a Barrier Is Specified Warehouse Security Doors Explained Warehouse Security Gates Warranty, Defects Liability and Guarantees for Security Doors and Barriers What affects the cost of a bullet resistant door What affects the cost of a high-security door in the UK Window Security Bars View all →

Products

One supplier for the whole building envelope

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.